ODOT letting results, January 16, 2025
33 contracts let by Ohio DOT on January 16, 2025, $60,111,991 in low bids, a median of 4 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 23 times; median low bid -7.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 33
- Low bids, total
- $60,111,991
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 250013 | HAM-IR 71-01.81 (BRIDGE REPLACEMENT (1 BRIDGE)) | HAM | 4 | Prus Construction Company | $12,889,022 | $13,027,416 | +1.0% | +34% | ODOT |
| 250036 | HOL-SR 515-00.00 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | HOL | 4 | Shelly Company | $5,847,883 | $6,234,366 | +7.0% | -25% | ODOT |
| 250018 | LIC-SR 37-19.18 (PART 1) (BRIDGE REPLACEMENT (1 BRIDGE)) | LIC | 3 | Complete General Construction Company | $4,915,311 | $5,317,418 | +8.0% | -5.0% | ODOT |
| 250014 | HAM-IR 71-04.27 (BRIDGE REPAIR) | HAM | 2 | Elite Contractors Inc | $3,879,682 | $3,989,624 | +3.0% | +22% | ODOT |
| 250021 | SAN-SR 412/SR 590-08.86/06.56 Resurf (TWO LANE RESURFACING) | SAN | 4 | Kokosing Construction Company Inc | $3,653,694 | $4,010,653 | +10% | -25% | ODOT |
| 250027 | D04-PM FY2025 (East) (PAVEMENT MARKING) | District 4 | 2 | The Aero-Mark Company LLC | $2,644,000 | $2,984,703 | +13% | -6.0% | ODOT |
| 240576 | DEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES)) | DEL | 7 | Miller Bros Const Inc | $2,571,926 | $2,617,665 | +2.0% | -16% | ODOT |
| 250020 | PIK-US 23-00.00 (FOUR LANE RESURFACING) | PIK | 2 | Shelly Company | $2,534,913 | $2,805,866 | +11% | -4.0% | ODOT |
| 250012 | GAL-SR 7-19.94 (SLIDE REPAIR) | GAL | 4 | Alan Stone Co Inc | $2,473,505 | $2,490,466 | +1.0% | +11% | ODOT |
| 250008 | D04-BH/CR FY2025 (East) (CULVERT REPLACEMENT) | District 4 | 4 | Eclipse Co LLC | $2,037,343 | $2,087,919 | +2.0% | +26% | ODOT |
| 240582 | HAM-US 52-36.85 (SLIDE REPAIR) | HAM | 9 | Alan Stone Co Inc | $1,928,724 | $1,956,795 | +1.0% | +7.0% | ODOT |
| 250016 | HUR-SR 18-17.10 (INTERSECTION) | HUR | 7 | D L Smith Concrete LLC | $1,519,776 | $1,562,056 | +3.0% | -15% | ODOT |
| 250022 | SAN-US 6-17.66 Slide Repair (SLIDE REPAIR) | SAN | 3 | Great Lakes Demolition Company | $1,304,978 | $1,613,200 | +24% | -38% | ODOT |
| 250025 | D01-BM FY25 (BRIDGE REPAIR) | District 1 | 1 | BCC Ohio Inc | $1,134,093 | +11% | ODOT | ||
| 250011 | GAL-SR 218/VAR-14.77/VAR (CULVERT REPLACEMENT) | GAL | 4 | Parker Corporation | $997,612 | $1,051,476 | +5.0% | -4.0% | ODOT |
| 250024 | CRA-/ RIC / WAY RM FY2025 (SPOT PATCHING / PAVEMENT REPAIR) | CRA | 3 | Kokosing Construction Company Inc | $905,385 | $1,130,888 | +25% | -1.0% | ODOT |
| 250017 | JEF-SR 43-20.94 (TWO LANE RESURFACING) | JEF | 3 | NLS Paving, Inc | $902,413 | $1,187,351 | +32% | +10% | ODOT |
| 250031 | D08-Mowing FY2025 (A) (MOWING) | District 8 | 2 | Linkel Company | $838,000 | $932,894 | +11% | -14% | ODOT |
| 250030 | D07-ITS Maint-FY 2025 (SIGNALIZATION) | District 7 | 5 | Asplundh Construction LLC | $809,467 | $880,505 | +9.0% | -20% | ODOT |
| 250035 | FRA-MOW FY25 (MOWING) | FRA | 2 | Tom Mayle & Sons Construction Inc | $793,000 | $826,396 | +4.0% | -13% | ODOT |
| 250019 | MEG-US 33-(07.61)(07.87) (SLIDE REPAIR) | MEG | 6 | Allard Excavation LLC | $699,083 | $832,425 | +19% | -19% | ODOT |
| 250033 | D09-Guardrail Project FY2025 (GUARDRAIL REBUILDING) | District 9 | 4 | PDK Construction Inc | $608,511 | $698,943 | +15% | -18% | ODOT |
| 250006 | COL-SR 170-20.03 (CULVERT REPLACEMENT) | COL | 10 | Bog Construction Inc | $599,986 | $620,795 | +3.0% | -21% | ODOT |
| 250037 | HOL-SR 515-00.15 (CULVERT REPLACEMENT) | HOL | 5 | Shelly & Sands Inc | $594,539 | $685,120 | +15% | -7.0% | ODOT |
| 250034 | ERI-/ LOR RM FY2025 (SPOT PATCHING / PAVEMENT REPAIR) | ERI | 2 | Erie Blacktop Inc | $577,644 | $602,950 | +4.0% | +40% | ODOT |
| 250028 | D07-GR FY 2025 (GUARDRAIL REBUILDING) | District 7 | 2 | Lake Erie Construction Company | $514,525 | $529,794 | +3.0% | -8.0% | ODOT |
| 250005 | CLE-/WAR CS FY2025 (CRACK SEALING) | CLE | 3 | Russell Standard Corporation and Subsidiary | $474,526 | $502,221 | +6.0% | -2.0% | ODOT |
| 254000 | ASD-/WAY-US 42/SR 301-01.90/05.54 (CULVERT REPLACEMENT) | ASD | 2 | Great Lakes Demolition Company | $353,092 | $368,200 | +4.0% | -13% | ODOT |
| 250038 | RIC-SR 314-02.75 (CULVERT REPLACEMENT) | RIC | 8 | Crawford Construction Company Inc | $329,618 | $358,737 | +9.0% | -30% | ODOT |
| 250023 | SCI-SR 139-07.65 (CULVERT REPLACEMENT) | SCI | 6 | Scioto Valley Paving LLC | $230,215 | $238,868 | +4.0% | -11% | ODOT |
| 250032 | D08-DELINEATOR-FY2025 (MISCELLANEOUS) | District 8 | 4 | Hydratech Engineered Products LLC | $215,626 | $259,467 | +20% | -30% | ODOT |
| 250026 | D03-MOW FY2025 (A) (MOWING) | District 3 | 3 | Esk Landscaping | $177,636 | $179,568 | +1.0% | +4.0% | ODOT |
| 250039 | VIN-SR 328-08.97 (SLIDE REPAIR) | VIN | 7 | MC Kee Paving & Sealing LLC | $156,266 | $165,849 | +6.0% | +3.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way