ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250013HAM-IR 71-01.81 (BRIDGE REPLACEMENT (1 BRIDGE))HAM4Prus Construction Company$12,889,022$13,027,416+1.0%+34%ODOT
250036HOL-SR 515-00.00 (PART 1 AND PART 2) (MINOR RECONSTRUCTION)HOL4Shelly Company$5,847,883$6,234,366+7.0%-25%ODOT
250018LIC-SR 37-19.18 (PART 1) (BRIDGE REPLACEMENT (1 BRIDGE))LIC3Complete General Construction Company$4,915,311$5,317,418+8.0%-5.0%ODOT
250014HAM-IR 71-04.27 (BRIDGE REPAIR)HAM2Elite Contractors Inc$3,879,682$3,989,624+3.0%+22%ODOT
250021SAN-SR 412/SR 590-08.86/06.56 Resurf (TWO LANE RESURFACING)SAN4Kokosing Construction Company Inc$3,653,694$4,010,653+10%-25%ODOT
250027D04-PM FY2025 (East) (PAVEMENT MARKING)District 42The Aero-Mark Company LLC$2,644,000$2,984,703+13%-6.0%ODOT
240576DEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES))DEL7Miller Bros Const Inc$2,571,926$2,617,665+2.0%-16%ODOT
250020PIK-US 23-00.00 (FOUR LANE RESURFACING)PIK2Shelly Company$2,534,913$2,805,866+11%-4.0%ODOT
250012GAL-SR 7-19.94 (SLIDE REPAIR)GAL4Alan Stone Co Inc$2,473,505$2,490,466+1.0%+11%ODOT
250008D04-BH/CR FY2025 (East) (CULVERT REPLACEMENT)District 44Eclipse Co LLC$2,037,343$2,087,919+2.0%+26%ODOT
240582HAM-US 52-36.85 (SLIDE REPAIR)HAM9Alan Stone Co Inc$1,928,724$1,956,795+1.0%+7.0%ODOT
250016HUR-SR 18-17.10 (INTERSECTION)HUR7D L Smith Concrete LLC$1,519,776$1,562,056+3.0%-15%ODOT
250022SAN-US 6-17.66 Slide Repair (SLIDE REPAIR)SAN3Great Lakes Demolition Company$1,304,978$1,613,200+24%-38%ODOT
250025D01-BM FY25 (BRIDGE REPAIR)District 11BCC Ohio Inc$1,134,093+11%ODOT
250011GAL-SR 218/VAR-14.77/VAR (CULVERT REPLACEMENT)GAL4Parker Corporation$997,612$1,051,476+5.0%-4.0%ODOT
250024CRA-/ RIC / WAY RM FY2025 (SPOT PATCHING / PAVEMENT REPAIR)CRA3Kokosing Construction Company Inc$905,385$1,130,888+25%-1.0%ODOT
250017JEF-SR 43-20.94 (TWO LANE RESURFACING)JEF3NLS Paving, Inc$902,413$1,187,351+32%+10%ODOT
250031D08-Mowing FY2025 (A) (MOWING)District 82Linkel Company$838,000$932,894+11%-14%ODOT
250030D07-ITS Maint-FY 2025 (SIGNALIZATION)District 75Asplundh Construction LLC$809,467$880,505+9.0%-20%ODOT
250035FRA-MOW FY25 (MOWING)FRA2Tom Mayle & Sons Construction Inc$793,000$826,396+4.0%-13%ODOT
250019MEG-US 33-(07.61)(07.87) (SLIDE REPAIR)MEG6Allard Excavation LLC$699,083$832,425+19%-19%ODOT
250033D09-Guardrail Project FY2025 (GUARDRAIL REBUILDING)District 94PDK Construction Inc$608,511$698,943+15%-18%ODOT
250006COL-SR 170-20.03 (CULVERT REPLACEMENT)COL10Bog Construction Inc$599,986$620,795+3.0%-21%ODOT
250037HOL-SR 515-00.15 (CULVERT REPLACEMENT)HOL5Shelly & Sands Inc$594,539$685,120+15%-7.0%ODOT
250034ERI-/ LOR RM FY2025 (SPOT PATCHING / PAVEMENT REPAIR)ERI2Erie Blacktop Inc$577,644$602,950+4.0%+40%ODOT
250028D07-GR FY 2025 (GUARDRAIL REBUILDING)District 72Lake Erie Construction Company$514,525$529,794+3.0%-8.0%ODOT
250005CLE-/WAR CS FY2025 (CRACK SEALING)CLE3Russell Standard Corporation and Subsidiary$474,526$502,221+6.0%-2.0%ODOT
254000ASD-/WAY-US 42/SR 301-01.90/05.54 (CULVERT REPLACEMENT)ASD2Great Lakes Demolition Company$353,092$368,200+4.0%-13%ODOT
250038RIC-SR 314-02.75 (CULVERT REPLACEMENT)RIC8Crawford Construction Company Inc$329,618$358,737+9.0%-30%ODOT
250023SCI-SR 139-07.65 (CULVERT REPLACEMENT)SCI6Scioto Valley Paving LLC$230,215$238,868+4.0%-11%ODOT
250032D08-DELINEATOR-FY2025 (MISCELLANEOUS)District 84Hydratech Engineered Products LLC$215,626$259,467+20%-30%ODOT
250026D03-MOW FY2025 (A) (MOWING)District 33Esk Landscaping$177,636$179,568+1.0%+4.0%ODOT
250039VIN-SR 328-08.97 (SLIDE REPAIR)VIN7MC Kee Paving & Sealing LLC$156,266$165,849+6.0%+3.0%ODOT
ODOT contracts let on January 16, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy