Miller Bros Const Inc submitted 148 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 39 of them (26%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $182,175,040
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 35 | 4 | 11% |
| 2021 | 29 | 8 | 28% |
| 2022 | 20 | 8 | 40% |
| 2023 | 12 | 3 | 25% |
| 2024 | 19 | 4 | 21% |
| 2025 | 21 | 9 | 43% |
| 2026 | 12 | 3 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| LUC | 18 | 7 | 39% |
| HEN | 9 | 2 | 22% |
| DEF | 9 | 3 | 33% |
| WOO | 8 | 0 | 0% |
| HAN | 7 | 2 | 29% |
| PAU | 6 | 2 | 33% |
| LIC | 6 | 4 | 67% |
| SAN | 5 | 1 | 20% |
| VAN | 5 | 2 | 40% |
| ALL | 5 | 0 | 0% |
| OTT | 4 | 1 | 25% |
| UNI | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 156 | 156 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 136 | 107 (79%) | $1.00 | $1.00 |
| Seeding and mulching | 659E10000 | SY | 128 | 77 (60%) | $1.30 | $2.60 |
| Non-tracking tack coat | 407E20000 | GAL | 99 | 74 (75%) | $2.25 | $3.25 |
| Commercial fertilizer | 659E20000 | TON | 142 | 64 (45%) | $605.00 | $850.00 |
| Guardrail removed | 202E38000 | FT | 91 | 56 (62%) | $2.00 | $2.50 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 89 | 56 (63%) | $20.00 | $23.50 |
| Sign, flat sheet | 630E80100 | SF | 83 | 52 (63%) | $19.95 | $24.00 |
| Repair seeding and mulching | 659E14000 | SY | 106 | 50 (47%) | $1.00 | $1.25 |
| Tack coat | 407E10000 | GAL | 74 | 50 (68%) | $2.00 | $3.25 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 72 | 49 (68%) | $14.75 | $15.20 |
| Guardrail, type MGS | 606E15050 | FT | 72 | 48 (67%) | $20.60 | $22.73 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vernon Nagel Inc | 58 | 29 of 58 |
| Complete General Construction Company | 55 | 18 of 55 |
| Eagle Bridge Co | 45 | 26 of 45 |
| Shelly & Sands Inc | 40 | 23 of 40 |
| R & I Construction Inc | 25 | 16 of 25 |
| Double Z Construction Company | 21 | 6 of 21 |
| Mosser Construction Inc | 20 | 7 of 20 |
| E S Wagner Company | 17 | 9 of 17 |
| R G Zachrich Construction Inc | 16 | 8 of 16 |
| Eclipse Co LLC | 16 | 3 of 16 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260521 | GUE | GUE-IR 70 EB Rest Area TP (PARKING AREAS) | 2 of 8 | $7,415,048 | 0.0% |
| 29 OCT 2026 | 260475 | WOO | WOO-IR 75-13.83 Deck Replacement (BRIDGE REPAIR) | 2 of 3 | $3,022,171 | +9.0% |
| 01 OCT 2026 | 260405 | DEL | DEL-US 36-00.00 (MAJOR RECONSTRUCTION) | 3 of 3 | $20,363,649 | +15% |
| 27 AUG 2026 | 260358 | WOO | WOO-IR 75-06.94 Slide Repair (SLIDE REPAIR) | 2 of 4 | $437,718 | +17% |
| 13 AUG 2026 | 260367 | PIK | PIK-SR 32-06.60 (BRIDGE REPAIR) | 1 of 6 | $516,978 | Low, 24% under the second |
| 13 AUG 2026 | 260368 | PIK | PIK-SR 32-18.40 (INTERSECTION) | 8 of 9 | $3,341,073 | +18% |
| 30 JUL 2026 | 260342 | ALL | ALL-SR 65-13.25 (BRIDGE REPAIR) | 3 of 4 | $2,074,382 | +3.0% |
| 25 JUN 2026 | 260324 | PER | PER-SR 345-06.48 (BRIDGE REPAIR) | 3 of 6 | $920,157 | +6.0% |
| 11 JUN 2026 | 260287 | FUL | FUL-US 20-19.75 Roundabout (INTERSECTION) | 1 of 3 | $3,332,719 | Low, 10% under the second |
| 07 MAY 2026 | 260167 | ERI | ERI-US 6-Connectivity Corrid. (MAJOR RECONSTRUCTION) | 2 of 3 | $33,149,790 | +7.0% |
| 07 MAY 2026 | 260260 | LUC | LUC-US 24 24.98 Bridge Repair (BRIDGE REPAIR) | 1 of 1 | $1,269,616 | Low |
| 29 JAN 2026 | 260002 | HEN | HEN-US 6/US 24-11.32/04.62 (MAJOR RECONSTRUCTION) | 2 of 3 | $59,336,765 | +2.0% |
| 13 NOV 2025 | 250521 | FAI | FAI-SR 158-04.20 (INTERSECTION) | 2 of 7 | $2,414,763 | +4.0% |
| 23 OCT 2025 | 250459 | CRA | CRA-US 30-08.42 (BRIDGE REPAIR) | 2 of 4 | $7,823,265 | +2.0% |
| 09 OCT 2025 | 250455 | AUG | AUG-SR 219-09.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $952,134 | 0.0% |
| 09 OCT 2025 | 250468 | MAR | MAR-SR 37-08.44 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $2,572,669 | Low, 16% under the second |
| 25 SEP 2025 | 250437 | LOG | LOG-US 33-20.86 (SLIDE REPAIR) | 2 of 4 | $632,711 | +6.0% |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 7 | $1,596,201 | +5.0% |
| 11 SEP 2025 | 250399 | WOO | WOO-SR 64/SR 65-05.78/06.18/23.39 Br Rpl (BRIDGE REPLACEMENT (3 BRIDGES)) | 3 of 3 | $4,145,521 | +12% |
| 11 SEP 2025 | 250415 | PIC | PIC-SR 56-20.77 (SLIDE REPAIR) | 5 of 10 | $549,884 | +17% |
| 28 AUG 2025 | 250396 | ROS | ROS-SR 772-07.64 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 8 | $1,649,002 | Low, 1.0% under the second |
| 14 AUG 2025 | 250378 | FUL | FUL-SR 109-16.98 Bridge Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $1,079,950 | Low, 2.0% under the second |
| 31 JUL 2025 | 250363 | PAU | PAU-US 127-10.23 (BRIDGE REPAIR) | 4 of 6 | $383,021 | +17% |
| 24 APR 2025 | 250217 | DEF | DEF-US 24-01.61/02.89 (SLIDE REPAIR) | 1 of 5 | $2,611,765 | Low, 11% under the second |
| 27 MAR 2025 | 250079 | HEN | HEN-US 24-00.43 CR-17D Interchng (INTERCHANGE) | 3 of 3 | $12,915,753 | +5.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.