Vernon Nagel Inc: ODOT bid record
Vernon Nagel Inc submitted 115 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 34 of them (30%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $88,241,993
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 23 | 9 | 39% |
| 2021 | 25 | 3 | 12% |
| 2022 | 15 | 5 | 33% |
| 2023 | 8 | 5 | 63% |
| 2024 | 14 | 6 | 43% |
| 2025 | 15 | 2 | 13% |
| 2026 | 15 | 4 | 27% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WOO | 14 | 7 | 50% |
| SAN | 10 | 1 | 10% |
| PAU | 9 | 1 | 11% |
| VAN | 9 | 5 | 56% |
| PUT | 9 | 3 | 33% |
| DEF | 9 | 3 | 33% |
| HEN | 8 | 3 | 38% |
| LUC | 8 | 5 | 63% |
| OTT | 7 | 2 | 29% |
| HAN | 6 | 1 | 17% |
| ALL | 6 | 0 | 0% |
| WIL | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 117 | 117 (100%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 107 | 88 (82%) | $1.00 | $3.00 |
| Water | 659E35000 | MGAL | 111 | 87 (78%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 108 | 58 (54%) | $645.00 | $850.00 |
| Non-tracking tack coat | 407E20000 | GAL | 84 | 57 (68%) | $2.00 | $3.25 |
| Tack coat | 407E10000 | GAL | 72 | 52 (72%) | $1.92 | $3.25 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 69 | 52 (75%) | $15.00 | $23.50 |
| Water | 616E10000 | MGAL | 61 | 49 (80%) | $10.00 | $20.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 53 | 41 (77%) | $15.00 | $15.20 |
| Seeding and mulching | 659E10000 | SY | 104 | 38 (37%) | $2.00 | $2.60 |
| Repair seeding and mulching | 659E14000 | SY | 73 | 38 (52%) | $1.20 | $1.25 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 60 | 38 (63%) | $15.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Bros Const Inc | 58 | 29 of 58 |
| Eclipse Co LLC | 32 | 9 of 32 |
| Great Lakes Demolition Company | 29 | 22 of 29 |
| Eagle Bridge Co | 18 | 12 of 18 |
| R & I Construction Inc | 18 | 10 of 18 |
| Mosser Construction Inc | 16 | 7 of 16 |
| R G Zachrich Construction Inc | 14 | 6 of 14 |
| Geddis Paving & Excavating Inc | 13 | 5 of 13 |
| E S Wagner Company | 13 | 6 of 13 |
| Miller Contracting Group Inc | 11 | 7 of 11 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 7 | $1,167,366 | +23% |
| 29 OCT 2026 | 264028 | HAN | HAN-SR 103-12.43 (BRIDGE REPAIR) | 3 of 4 | $609,245 | +5.0% |
| 01 OCT 2026 | 260433 | PUT | PUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT) | 6 of 6 | $2,362,115 | +16% |
| 27 AUG 2026 | 260358 | WOO | WOO-IR 75-06.94 Slide Repair (SLIDE REPAIR) | 3 of 4 | $499,323 | +33% |
| 30 JUL 2026 | 260342 | ALL | ALL-SR 65-13.25 (BRIDGE REPAIR) | 2 of 4 | $2,028,632 | +1.0% |
| 16 JUL 2026 | 264017 | CRA | CRA-SR 100-18.38 (CULVERT REPLACEMENT) | 3 of 4 | $479,071 | +9.0% |
| 11 JUN 2026 | 260287 | FUL | FUL-US 20-19.75 Roundabout (INTERSECTION) | 3 of 3 | $3,731,075 | +12% |
| 07 MAY 2026 | 260226 | ALL | ALL-SR 117-10.78 (INTERSECTION) | 3 of 3 | $2,877,284 | +19% |
| 07 MAY 2026 | 260248 | SAN | SAN-US 20-20.80 roundabout (INTERSECTION) | 3 of 3 | $7,787,483 | +8.0% |
| 23 APR 2026 | 260216 | VAN | VAN-US 224-10.88 (PART 1, PART 2 AND PART 3) (INTERSECTION) | 1 of 2 | $6,451,324 | Low, 12% under the second |
| 09 APR 2026 | 264008 | PUT | PUT-SR 190-05.71 (CULVERT REPLACEMENT) | 3 of 3 | $839,265 | +40% |
| 19 FEB 2026 | 260095 | SAN | SAN-SR 510-00.00 Rehab (MINOR RECONSTRUCTION) | 2 of 3 | $6,022,385 | +7.0% |
| 29 JAN 2026 | 264003 | WIL | WIL-SR 34-27.22 Bridge Repair (BRIDGE REPAIR) | 1 of 2 | $576,218 | Low, 5.0% under the second |
| 15 JAN 2026 | 260022 | LUC | LUC-US 20A-09.77 Roundabout (INTERSECTION) | 1 of 4 | $1,529,372 | Low, 3.0% under the second |
| 15 JAN 2026 | 260029 | WOO | WOO-SR 795-01.76 Resurf & Overlay (BRIDGE REPAIR) | 1 of 2 | $3,157,003 | Low, 9.0% under the second |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 7 | $1,587,120 | +5.0% |
| 25 SEP 2025 | 254026 | SAN | SAN-SR 523-03.07 Brdg Rehab (BRIDGE REPAIR) | 3 of 4 | $786,337 | +14% |
| 11 SEP 2025 | 250399 | WOO | WOO-SR 64/SR 65-05.78/06.18/23.39 Br Rpl (BRIDGE REPLACEMENT (3 BRIDGES)) | 1 of 3 | $3,693,160 | Low, 8.0% under the second |
| 14 AUG 2025 | 250378 | FUL | FUL-SR 109-16.98 Bridge Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $1,097,097 | +2.0% |
| 31 JUL 2025 | 250363 | PAU | PAU-US 127-10.23 (BRIDGE REPAIR) | 2 of 6 | $331,187 | +1.0% |
| 08 MAY 2025 | 250257 | OTT | OTT-SR 269-01.78 Roundabout (INTERSECTION) | 2 of 3 | $3,201,231 | +3.0% |
| 08 MAY 2025 | 250258 | PAU | PAU-SR 637-12.27 (SLIDE REPAIR) | 2 of 6 | $770,273 | +4.0% |
| 08 MAY 2025 | 254016 | PAU | PAU-SR 111-01.65 (CULVERT REPLACEMENT) | 2 of 3 | $331,156 | +4.0% |
| 24 APR 2025 | 250209 | ALL | ALL-Harrod Improvements (MINOR RECONSTRUCTION) | 3 of 6 | $2,039,028 | +33% |
| 24 APR 2025 | 250217 | DEF | DEF-US 24-01.61/02.89 (SLIDE REPAIR) | 2 of 5 | $2,906,213 | +11% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.