Geddis Paving & Excavating Inc: ODOT bid record

Geddis Paving & Excavating Inc submitted 29 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 17 SEP 2026, and was the low bidder on 10 of them (34%). When it was not low, its total sat a median +18% above the low bid.

Owner
Ohio DOT
Low bid volume
$12,028,360
Latest bid
17 SEP 2026
Data through
12 NOV 2026
29Bids
10Low bids
34Win rate, percent
+18%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2020700%
202112650%
202211100%
20242150%
20252150%
20265120%
Geddis Paving & Excavating Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
LUC8338%
WOO5240%
HAN3133%
HEN200%
SAN200%
OTT2150%
DEF200%
PAU11100%
SEN11100%
PUT100%
FUL100%
WIL11100%
Geddis Paving & Excavating Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2727 (100%)$1.00$1.00
Water659E35000MGAL2313 (57%)$1.00$1.00
Subgrade compaction204E10000SY1713 (76%)$0.45$3.00
Non-tracking tack coat407E20000GAL1912 (63%)$1.10$3.25
Repair seeding and mulching659E14000SY1610 (63%)$1.40$1.25
Commercial fertilizer659E20000TON219 (43%)$655.00$850.00
Excavation203E10000CY248 (33%)$25.50$27.00
Embankment203E20000CY208 (40%)$25.00$25.00
Walk removed202E30000SF108 (80%)$1.10$4.00
Seeding and mulching659E10000SY207 (35%)$1.52$2.60
Removal of ground mounted sign and disposal630E84900EACH137 (54%)$11.50$20.00
Catch basin, no. 3A611E98180EACH97 (78%)$2,550.00$3,500.00
Geddis Paving & Excavating Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Vernon Nagel Inc138 of 13
Miller Bros Const Inc96 of 9
Eclipse Co LLC73 of 7
Miller Contracting Group Inc52 of 5
Gerken Paving Inc52 of 5
Beaver Excavating Company42 of 4
Great Lakes Demolition Company43 of 4
Advanced Excavating & Demolition LLC41 of 4
Shelly Company31 of 3
Crestline Paving & Excavating Co Inc30 of 3
Geddis Paving & Excavating Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
17 SEP 2026260416WILWIL-US 127-15.09 Culvert (CULVERT REPLACEMENT)1 of 3$404,515Low, 5.0% under the second
11 JUN 2026260287FULFUL-US 20-19.75 Roundabout (INTERSECTION)2 of 3$3,682,638+10%
21 MAY 2026260265DEFDEF-SR 66-04.24 (SLIDE REPAIR)2 of 6$1,501,500-4.0%
09 APR 2026260186WOOWOO-Roche De Boeuf Interurban (DEMOLITION)2 of 3$3,197,051+4.0%
15 JAN 2026260022LUCLUC-US 20A-09.77 Roundabout (INTERSECTION)4 of 4$1,713,490+12%
24 APR 2025250217DEFDEF-US 24-01.61/02.89 (SLIDE REPAIR)3 of 5$3,540,347+36%
13 FEB 2025250112WOOWOO-IR 75-08.58 Weigh Station (PARKING AREAS)1 of 4$693,840Low, 0.0% under the second
19 DEC 2024240585HENHEN-SR 109-06.00/21.30 (MINOR RECONSTRUCTION)2 of 3$5,815,648+13%
23 MAY 2024240319OTTOTT-ODNR Portage River Access (PARKING AREAS)1 of 5$211,663Low, 11% under the second
01 DEC 2022220637LUCLUC-SR 2-13.77 Intr Widen Grp A (PART 1 AND PART 2) (INTERSECTION)1 of 2$5,978,551Low, 6.0% under the second
18 NOV 2021210609LUCLUC-US 20-13.70 Replacement (CULVERT REPLACEMENT)2 of 2$1,587,331+1.0%
16 SEP 2021210501WOOWOO-ODNR-Fort Meigs Resurface (PARKING AREAS)1 of 4$81,641Low, 3.0% under the second
29 JUL 2021210439LUCLUC-US 20-16.47 Safety Grp A (INTERSECTION)1 of 2$1,299,141Low, 5.0% under the second
15 JUL 2021210412HANHAN-SR 15-25.30/27.17 (MINOR RECONSTRUCTION)1 of 2$588,218Low, 9.0% under the second
01 JUL 2021210405PUTPUT-SR 109-02.63 (MISCELLANEOUS)2 of 5$266,863+20%
13 MAY 2021210308SENSEN-US 224-11.98 Safety Grp A (INTERSECTION)1 of 1$1,477,781Low
29 APR 2021210271LUCLUC-US 24-26.41 Det Rndabt Grp B (INTERSECTION)2 of 2$1,324,402+12%
29 APR 2021210289WOOWOO-ODNR Mary Jane Thurston Park (PARKING AREAS)4 of 5$85,931+20%
01 APR 2021210201LUCLUC-Toledo Ped Safety Impv (SPOT SAFETY)2 of 2$1,090,069+18%
01 APR 2021210202LUCLUC-US 20-13.40 Safety Grp A (INTERSECTION)1 of 2$994,994Low, 42% under the second
01 APR 2021210209PAUPAU-SR 111-23.69 (SLIDE REPAIR)1 of 5$298,016Low, 5.0% under the second
25 FEB 2021210134OTTOTT-SR 105-04.11 Slide repair (SLIDE REPAIR)4 of 7$261,532+58%
03 DEC 2020200578SANSAN-US 6-15.30 Slope Repair (SLIDE REPAIR)10 of 11$1,868,027+24%
05 NOV 2020200526SANSAN-SR 19-00.24 Bridge Repl. (CULVERT REPLACEMENT)8 of 9$945,409+38%
27 AUG 2020200441HENHEN-US 6-16.77 Slide Repair (SLIDE REPAIR)3 of 3$443,194+36%
Geddis Paving & Excavating Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way