ODOT contract 260265 bid tabulation

DEF-SR 66-04.24 (SLIDE REPAIR). Let by Ohio DOT on May 21, 2026, DEF. 6 bids received; low bid $1,558,998 by Kokosing Construction Company Inc, +6.6% against the engineer's estimate of $1,463,000.

Owner
Ohio DOT
Letting
21 MAY 2026
Pay items
53
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Kokosing Construction Company Inc$1,558,998Low+7.0%
2Geddis Paving & Excavating Inc$1,501,500-4.0%+3.0%
3Advanced Excavating & Demolition LLC$1,597,339+2.0%+9.0%
4Alan Stone Co Inc$1,699,606+9.0%+16%
5Miller Contracting Group Inc$1,753,227+12%+20%
6Beaver Excavating Company$2,014,588+29%+38%
ODOT contract 260265: bids by rank

Engineer's estimate: $1,463,000.

Bid tabulation

LinePay itemUnitQuantity1. Kokosing Construction Company Inc2. Geddis Paving & Excavating Inc3. Advanced Excavating & Demolition LLC4. Alan Stone Co Inc5. Miller Contracting Group Inc6. Beaver Excavating Company
1Clearing and grubbing (201E11000)LS1$10,000$1,750.00$15,000$8,000.00$2,500.00$8,000.00
2Pavement removed (202E23000)SY295$20.00$40.00$30.00$20.00$20.00$40.00
3Curb removed (202E32000)FT772$5.25$3.00$7.50$9.00$3.00$4.00
4Pipe removed, 24" and under (202E35100)FT109$15.00$25.00$25.00$15.00$19.00$45.00
5Guardrail removed (202E38000)FT782$2.50$5.00$2.50$3.00$3.00$2.00
6Manhole removed (202E58000)EACH2$600.00$250.00$1,350.00$480.00$850.00$650.00
7Catch basin removed (202E58100)EACH2$600.00$250.00$1,000.00$480.00$600.00$650.00
8Excavation (203E10000)CY92$20.00$12.00$31.00$30.00$9.50$40.00
9Embankment (203E20000)CY84$55.00$12.00$32.00$35.00$52.50$40.00
10Subgrade compaction (204E10000)SY397$2.50$1.00$3.00$8.00$2.75$4.00
11Reshaping under guardrail (209E15000)STA2$65.00$300.00$150.00$1,000.00$145.00$80.00
12Guardrail, type MGS, as per plan (606E15051)FT725$24.75$27.00$26.00$30.00$30.00$26.00
13Anchor assembly, MGS type E (606E26150)EACH1$1,450.00$1,450.00$1,500.00$1,800.00$3,400.00$2,925.00
14Preconstruction survey monument verification and report (623E50000)LS1$500.00$3,480.00$3,300.00$3,300.00$3,000.00$1,800.00
15Post construction survey monument verification and report (623E51000)LS1$500.00$3,480.00$3,300.00$3,300.00$3,000.00$1,800.00
16Rock channel protection, type C with filter (601E32200)CY21$220.00$180.00$220.00$240.00$173.00$240.00
17Rock channel protection, with grout, type C (601E34400)CY192$140.00$260.00$265.00$270.00$147.00$290.00
18Topsoil (659E00300)CY81$80.00$140.00$85.00$100.00$54.00$100.00
19Seeding and mulching (659E10000)SY727$2.60$3.00$2.60$3.00$3.00$2.60
20Commercial fertilizer (659E20000)TON0.10$800.00$870.00$800.00$870.00$912.00$800.00
21Lime (659E31000)ACRE0.15$1.00$20.00$1.00$1.00$1.00$1.00
22Water (659E35000)MGAL4$0.50$10.00$2.00$0.60$1.00$0.50
23Erosion control (832E30000)EACH3,000$1.00$1.00$1.00$1.00$1.00$1.00
24Concrete masonry (602E20000)CY0.20$5,500.00$7,400.00$4,500.00$7,400.00$13,893$6,000.00
254" base pipe underdrains with geotextile fabric (605E06020)FT361$20.00$35.00$25.00$10.00$18.25$25.00
264" conduit, type F for underdrain outlet (611E00410)FT20$42.00$35.00$80.00$25.00$26.00$30.00
2712" conduit, type C (611E04600)FT16$75.00$64.00$95.00$55.00$83.00$95.00
2812" conduit, type F (611E05200)FT36$110.00$64.00$150.00$90.00$48.00$130.00
29Catch basin, no. 3A (611E98180)EACH2$4,650.00$2,850.00$4,000.00$5,300.00$3,611.00$5,000.00
30Pavement planing, asphalt concrete, 1.5" depth (254E01000)SY428$10.00$18.00$7.00$7.50$8.00$7.00
31Asphalt concrete base, PG64-22, (449) (301E56000)CY64$400.00$285.00$300.00$320.00$335.00$295.00
32Aggregate base (304E20000)CY77$100.00$100.00$95.00$80.00$85.00$125.00
33Non-tracking tack coat (407E20000)GAL85$1.00$3.00$3.00$3.00$2.75$2.65
34Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY42$450.00$305.00$450.00$490.00$450.00$445.00
35Curb, type 4-C (609E24510)FT650$26.50$28.00$30.00$55.00$30.00$24.00
36Delineator, post ground mounted (620E00500)EACH1$250.00$255.00$400.00$440.00$456.00$235.00
37Barrier reflector, type 2, bidirectional (626E00110)EACH9$13.00$14.00$13.00$15.00$69.00$14.00
38Removal of ground mounted sign and reerection (630E85100)EACH1$150.00$2,600.00$500.00$550.00$570.00$95.00
39Removal of ground mounted post support and reerection (630E86010)EACH1$150.00$215.00$500.00$550.00$570.00$195.00
40Edge line, 6", type 1 (642E00104)MI0.12$8,300.00$33,800$20,000$22,000$22,778$8,300.00
41Pavement repair (253E02000)CY20$740.00$905.00$865.00$590.00$700.00$575.00
42Non-tracking tack coat (407E20000)GAL20$1.00$3.50$3.00$3.00$2.75$2.65
43Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY10$700.00$564.00$875.00$960.00$875.00$875.00
44Compacted aggregate (617E10100)CY50$140.00$100.00$105.00$140.00$110.00$95.00
45Steel piles, misc.: W24X55 steel beam, furnished, (507E00400)FT4,715$78.00$58.00$55.00$70.00$66.00$81.00
46Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703)FT3,946$143.50$145.00$152.00$135.00$140.00$165.00
47Drilled shafts, 36" diameter, into bedrock, as per plan (524E94705)FT810$150.00$195.00$192.00$380.00$200.00$400.00
48Drilled shafts, misc.: plug pile, 36" diameter, UN (524E95000)FT1,600$100.00$105.00$120.00$80.00$105.00$145.00
49Premium for contract performance bond and for payment bond (103E05000)LS1$6,200.00$13,000$40,000$15,000$17,600$12,000
50Maintaining traffic (614E11000)LS1$4,262.80$11,100$30,000$17,000$13,500$9,000.00
51Field office, type B (619E16010)MNTH3$6,750.00$1,750.00$1,650.00$1,500.00$2,500.00$3,400.00
52Construction layout stakes and surveying (623E10000)LS1$11,000$7,300.00$15,500$12,000$5,000.00$34,000
53Mobilization (624E10000)LS1$77,000$43,500$30,000$75,000$295,178$100,729
ODOT contract 260265: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy