Alan Stone Co Inc: ODOT bid record

Alan Stone Co Inc submitted 410 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 85 of them (21%). When it was not low, its total sat a median +19% above the low bid.

Owner
Ohio DOT
Low bid volume
$95,931,424
Latest bid
12 NOV 2026
Data through
12 NOV 2026
410Bids
85Low bids
21Win rate, percent
+19%Median gap to the low bid when not low, 325 bids

By year

YearBidsLow bidsWin rate
2020601017%
202153917%
2022701319%
2023611626%
2024651422%
2025581526%
202643819%
Alan Stone Co Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL42717%
MEG26623%
ATH251040%
WAS25728%
MOE21419%
LAW20525%
ROS16319%
NOB15427%
MRG15213%
PIK15427%
HAS1417%
BRO13431%
Alan Stone Co Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH403403 (100%)$1.00$1.00
Embankment203E20000CY361164 (45%)$17.00$25.00
Commercial fertilizer659E20000TON348127 (36%)$810.00$850.00
Excavation203E10000CY341100 (29%)$25.00$27.00
Water659E35000MGAL28786 (30%)$15.00$1.00
Aggregate base304E20000CY34382 (24%)$100.00$90.00
Seeding and mulching659E10000SY31375 (24%)$3.00$2.60
Subgrade compaction204E10000SY33870 (21%)$4.00$3.00
Pavement removed202E23000SY23664 (27%)$19.75$17.00
Portable barrier, unanchored622E41100FT18958 (31%)$21.00$24.34
1" preformed expansion joint filler516E13600SF9156 (62%)$2.00$10.00
Porous backfill with geotextile fabric518E21200CY20441 (20%)$150.00$125.00
Alan Stone Co Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Alan Stone Co Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260459FULFUL-US 20A-19.20 Slide Repair (SLIDE REPAIR)5 of 5$1,826,008+44%
12 NOV 2026260491BELBEL-SR 7-25.27 (SLIDE REPAIR)6 of 8$1,395,379+65%
12 NOV 2026260502HAMHAM-IR 275-05.25 (SLIDE REPAIR)1 of 4$1,018,980Low, 7.0% under the second
12 NOV 2026260509SCISCI-US 52-13.33 (CULVERT REPLACEMENT)3 of 5$829,554+15%
12 NOV 2026260521GUEGUE-IR 70 EB Rest Area TP (PARKING AREAS)5 of 8$7,803,299+6.0%
12 NOV 2026264030CUYCUY-SR 43-04.80 Replace (BRIDGE REPLACEMENT (1 BRIDGE))3 of 4$2,204,420+47%
29 OCT 2026260454ADAADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES))3 of 5$5,154,401+6.0%
29 OCT 2026260461HAMHAM-IR 275-11.40 (SLIDE REPAIR)3 of 5$3,013,017+9.0%
29 OCT 2026260465HOLHOL-US 62-30.74 (SLIDE REPAIR)2 of 5$524,559+9.0%
29 OCT 2026260467LAWLAW-US 52-07.44 (SLIDE REPAIR)2 of 2$8,878,603+1.0%
29 OCT 2026260469MOTMOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))6 of 6$2,110,167+61%
29 OCT 2026268021JEFJEF-SR 7-32.95 (SLIDE REPAIR)3 of 3$3,667,934+7.0%
15 OCT 2026260484GALGAL-US 35 Rest Areas TP (PARKING AREAS)2 of 3$4,228,003+7.0%
01 OCT 2026260418ADAADA-SR 41-31.36 (SLIDE REPAIR)2 of 5$635,348+13%
01 OCT 2026260427LAWLAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION)4 of 4$3,261,373+19%
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)2 of 7$654,706+1.0%
01 OCT 2026264025CLICLI-SR 72-02.18 (CULVERT REPLACEMENT)5 of 5$457,583+54%
01 OCT 2026268019NOBNOB-SR 821-02.98 (SLIDE REPAIR)2 of 4$1,867,203+3.0%
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)1 of 7$675,653Low, 13% under the second
17 SEP 2026264023BELBEL-SR 148-20.10 (SLIDE REPAIR)2 of 2$1,021,773+8.0%
27 AUG 2026260386LAWLAW-VAR South Point-Sidewalk (SIDEWALK)3 of 3$1,385,588+20%
27 AUG 2026260390SCISCI-SR 348-17.51 (BRIDGE REPAIR)1 of 3$851,020Low, -23% under the second
27 AUG 2026260395GUEGUE-ODNR Salt Fork SP FY2027 (PARKING AREAS)3 of 3$1,475,100+9.0%
13 AUG 2026260361GALGAL-SR 218-04.81/08.56 (CULVERT REPLACEMENT)3 of 4$950,099+6.0%
13 AUG 2026260362HASHAS-SR 646-01.94 (SLIDE REPAIR)4 of 6$845,930+8.0%
Alan Stone Co Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy