ODOT contract 260467 bid tabulation
LAW-US 52-07.44 (SLIDE REPAIR). Let by Ohio DOT on October 29, 2026, LAW. 2 bids received; low bid $8,751,687 by Allard Excavation LLC, +9.4% against the engineer's estimate of $8,002,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 60
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allard Excavation LLC | $8,751,687 | Low | +9.0% |
| 2 | Alan Stone Co Inc | $8,878,603 | +1.0% | +11% |
Engineer's estimate: $8,002,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allard Excavation LLC | 2. Alan Stone Co Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $225,282 | $220,000 |
| 2 | Concrete barrier removed, as per plan (202E30701) | FT | 1,935 | $10.00 | $15.00 |
| 3 | Guardrail removed (202E38000) | FT | 113 | $4.00 | $8.50 |
| 4 | Bridge terminal assembly removed (202E47000) | EACH | 1 | $93.00 | $940.00 |
| 5 | Excavation, as per plan (203E10001) | CY | 241,838 | $25.00 | $27.00 |
| 6 | Embankment (203E20000) | CY | 688 | $12.00 | $25.00 |
| 7 | Pre-blast condition survey (208E10000) | LS | 1 | $144,563 | $145,000 |
| 8 | Blasting consultant (208E12000) | LS | 1 | $10,745 | $21,000 |
| 9 | Air blast and noise control (208E13000) | LS | 1 | $28,653 | $5,400.00 |
| 10 | Vibration control and monitoring (208E14000) | LS | 1 | $28,653 | $22,000 |
| 11 | Presplitting, as per plan (208E15001) | SY | 20,968 | $32.00 | $8.00 |
| 12 | Hydrologist (208E16000) | LS | 1 | $71,632 | $87,000 |
| 13 | Guardrail, type MGS (606E15050) | FT | 112.50 | $50.00 | $50.00 |
| 14 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,450.00 | $5,300.00 |
| 15 | Fence, type 47 (607E15000) | FT | 1,661 | $24.00 | $30.00 |
| 16 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 2,008 | $293.00 | $230.00 |
| 17 | Barrier transition, as per plan (622E10201) | EACH | 1 | $25,500 | $14,000 |
| 18 | Concrete barrier end section, type D (622E25000) | EACH | 1 | $25,500 | $12,000 |
| 19 | Scaling (862E00500) | HR | 240 | $667.00 | $990.00 |
| 20 | Seeding and mulching (659E10000) | SY | 6,410 | $2.00 | $5.00 |
| 21 | Repair seeding and mulching (659E14000) | SY | 321 | $2.00 | $3.00 |
| 22 | Inter-seeding (659E15000) | SY | 321 | $2.00 | $0.10 |
| 23 | Commercial fertilizer (659E20000) | TON | 1.45 | $1,250.00 | $1,600.00 |
| 24 | Lime (659E31000) | ACRE | 1.33 | $1,251.00 | $65.00 |
| 25 | Water (659E35000) | MGAL | 36 | $1.00 | $1.50 |
| 26 | Storm water pollution prevention plan (832E15000) | LS | 1 | $6,000.00 | $4,200.00 |
| 27 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $23,000 | $18,000 |
| 28 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,000 | $13,000 |
| 29 | Erosion control (832E30000) | EACH | 100,000 | $1.00 | $1.00 |
| 30 | Pavement planing, asphalt concrete ( 1-1/2") (254E01000) | SY | 1,823 | $9.00 | $6.50 |
| 31 | Aggregate base (304E20000) | CY | 114 | $102.00 | $140.00 |
| 32 | Tack coat (407E10000) | GAL | 155 | $4.00 | $3.50 |
| 33 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 76 | $380.00 | $410.00 |
| 34 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 2,050 | $4.00 | $5.50 |
| 35 | Barrier reflector, type 1, one-way (626E00102) | EACH | 21 | $14.00 | $15.00 |
| 36 | Barrier reflector, type 2, one-way (626E00110) | EACH | 3 | $15.00 | $15.00 |
| 37 | Sign, flat sheet (630E80100) | SF | 6 | $45.00 | $60.00 |
| 38 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $25.00 | $870.00 |
| 39 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 1 | $7,000.00 | $9,200.00 |
| 40 | Edge line, 6", type 1 (642E00104) | MI | 0.93 | $1,625.00 | $1,800.00 |
| 41 | Lane line, 6", type 1 (642E00204) | MI | 0.93 | $1,050.00 | $1,100.00 |
| 42 | Dotted line, 6", type 1 (642E01510) | FT | 1,000 | $1.00 | $0.80 |
| 43 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 400 | $98.00 | $160.00 |
| 44 | Increased barrier delineation (614E11630) | FT | 55 | $2.00 | $2.00 |
| 45 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 3 | $2,100.00 | $3,800.00 |
| 46 | Detour signing (614E12420) | LS | 1 | $3,300.00 | $3,600.00 |
| 47 | Work zone increased penalties sign (614E12484) | EACH | 3 | $100.00 | $110.00 |
| 48 | Barrier reflector, type 1, one-way (614E13310) | EACH | 37 | $13.00 | $30.00 |
| 49 | Object marker, one way (614E13350) | EACH | 35 | $13.00 | $35.00 |
| 50 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,250.00 | $1,400.00 |
| 51 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.08 | $10,575 | $11,000 |
| 52 | Work zone channelizing line, class I, 12", 740.06, type I (614E23410) | FT | 976 | $4.00 | $4.50 |
| 53 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 1,788 | $1.00 | $0.70 |
| 54 | Water (616E10000) | MGAL | 847 | $1.00 | $0.10 |
| 55 | Portable barrier, unanchored (622E41100) | FT | 1,710 | $19.00 | $45.00 |
| 56 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 10 | $700.00 | $760.00 |
| 57 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $46,650 | $50,000 |
| 58 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $25,000 | $90,000 |
| 59 | Construction layout stakes and surveying (623E10000) | LS | 1 | $49,000 | $110,000 |
| 60 | Mobilization (624E10000) | LS | 1 | $171,000 | $140,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.