Allard Excavation LLC: ODOT bid record

Allard Excavation LLC submitted 127 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 29 OCT 2026, and was the low bidder on 39 of them (31%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$63,731,365
Latest bid
29 OCT 2026
Data through
12 NOV 2026
127Bids
39Low bids
31Win rate, percent
+14%Median gap to the low bid when not low, 88 bids

By year

YearBidsLow bidsWin rate
202020420%
202115640%
2022341029%
202313538%
202418211%
202512542%
202615747%
Allard Excavation LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
LAW221045%
MEG15320%
GAL13538%
SCI13538%
ROS11327%
PIK11327%
ATH10110%
BRO7343%
HIG6117%
ADA6350%
JAC500%
HOC5240%
Allard Excavation LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH125125 (100%)$1.00$1.00
Water659E35000MGAL11899 (84%)$1.00$1.00
Commercial fertilizer659E20000TON12070 (58%)$625.00$850.00
Tack coat407E10000GAL7452 (70%)$2.25$3.25
Excavation203E10000CY10648 (45%)$17.44$27.00
Embankment203E20000CY10743 (40%)$16.50$25.00
Seeding and mulching659E10000SY10840 (37%)$2.00$2.60
Center line, type 1642E00300MI6337 (59%)$8,355.00$5,500.00
Edge line, 6", type 1642E00104MI6035 (58%)$4,777.50$3,200.00
Aggregate base304E20000CY9932 (32%)$84.00$90.00
Pavement removed202E23000SY6632 (48%)$8.15$17.00
Non-tracking tack coat407E20000GAL4129 (71%)$3.90$3.25
Allard Excavation LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Allard Excavation LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260467LAWLAW-US 52-07.44 (SLIDE REPAIR)1 of 2$8,751,687Low, 1.0% under the second
15 OCT 2026260484GALGAL-US 35 Rest Areas TP (PARKING AREAS)1 of 3$3,951,942Low, 7.0% under the second
01 OCT 2026260418ADAADA-SR 41-31.36 (SLIDE REPAIR)1 of 5$561,074Low, 13% under the second
01 OCT 2026260427LAWLAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION)1 of 4$2,734,290Low, 5.0% under the second
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)3 of 7$766,792+13%
27 AUG 2026260386LAWLAW-VAR South Point-Sidewalk (SIDEWALK)2 of 3$1,183,938+2.0%
13 AUG 2026260368PIKPIK-SR 32-18.40 (INTERSECTION)1 of 9$2,836,187Low, 6.0% under the second
23 APR 2026260142MEGMEG-SR 681-03.072 of 4$10,025,000+1.0%
09 APR 2026260175GALGAL-SR 850-00.22/03.52 (MINOR RECONSTRUCTION)1 of 1$7,498,898Low
12 MAR 2026260141ROSROS-US 35/US 50 Interchange TP (PARKING AREAS)2 of 4$3,195,377+4.0%
19 FEB 2026264004LAWLAW-SR 775-05.77 (SLIDE REPAIR)2 of 3$564,007-21%
29 JAN 2026260042ATHATH-SR 56-00.90 (MINOR RECONSTRUCTION)3 of 6$1,798,580+4.0%
29 JAN 2026260058LAWLAW-SR 775-08.77 (SLIDE REPAIR)2 of 2$1,353,953+14%
29 JAN 2026260063PIKPIK-SR 32-09.27/09.96 (Safety) (INTERSECTION)3 of 4$2,508,181+12%
15 JAN 2026260006ATHATH-SR 13-13.71 (SLIDE REPAIR)1 of 7$984,857Low, -10% under the second
04 DEC 2025250559HOCHOC-SR 664-12.74 (INTERSECTION)3 of 5$2,298,817+12%
13 NOV 2025250536VINVIN-SR 93-07.20 (MINOR RECONSTRUCTION)4 of 4$1,878,513+26%
09 OCT 2025250471ROSROS-US 35-23.67 (SLIDE REPAIR)5 of 7$772,115+31%
17 JUL 2025250355SCISCI-Shawnee State ODNR FY26 (PARKING AREAS)3 of 5$420,001+8.0%
26 JUN 2025258017LAWLAW-SR 217-02.53 (SLIDE REPAIR)1 of 5$444,747Low, 0.0% under the second
22 MAY 2025250282PIKPIK-SR 124-14.96 (MINOR RECONSTRUCTION)1 of 4$1,944,512Low, 2.0% under the second
10 APR 2025250199SCISCI-US 52-15.06 (RELOCATION)1 of 3$1,898,155Low, 8.0% under the second
27 MAR 2025250181HOCHOC-SR 664-13.03 (MINOR RECONSTRUCTION)1 of 5$1,031,780Low, 2.0% under the second
27 FEB 2025250092LAWLAW-SR 775-19.50 (SLIDE REPAIR)2 of 5$848,668+18%
27 FEB 2025250128MEGMEG-US 33-13.98 (MAJOR WIDENING)2 of 6$34,982,063+12%
Allard Excavation LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way