ODOT letting results, April 9, 2026
27 contracts let by Ohio DOT on April 9, 2026, $58,162,343 in low bids, a median of 3 bidders per contract. On the 27 with an engineer's estimate, the low bid came in under it 12 times; median low bid +3.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 27
- Low bids, total
- $58,162,343
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260171 | COL-US 30-19.05 (MAJOR RECONSTRUCTION) | COL | 2 | Shelly & Sands Inc | $14,298,906 | $14,999,853 | +5.0% | +12% | ODOT |
| 260175 | GAL-SR 850-00.22/03.52 (MINOR RECONSTRUCTION) | GAL | 1 | Allard Excavation LLC | $7,498,898 | +19% | ODOT | ||
| 260147 | DEL-SR 229-00.45 AND VARIOUS (BRIDGE REPAIR) | DEL | 3 | Complete General Construction Company | $5,631,747 | $6,118,449 | +9.0% | +4.0% | ODOT |
| 268005 | MED-IR 71 Rest Areas TP (PARKING AREAS) | MED | 3 | Great Lakes Construction Co | $5,035,276 | $5,434,867 | +8.0% | -8.0% | ODOT |
| 260178 | LUC-/OTT-SR 2-34.05/00.00 Resurf (TWO LANE RESURFACING) | LUC | 3 | Kokosing Construction Company Inc | $3,388,866 | $3,781,213 | +12% | -10% | ODOT |
| 260186 | WOO-Roche De Boeuf Interurban (DEMOLITION) | WOO | 3 | Kokosing Construction Company Inc | $3,062,302 | $3,197,051 | +4.0% | -13% | ODOT |
| 260179 | MED-SR 421-00.00 (TWO LANE RESURFACING) | MED | 2 | Karvo Companies Inc | $2,387,979 | $2,438,301 | +2.0% | +13% | ODOT |
| 260168 | ATB-SR 84-13.43 (MINOR RECONSTRUCTION) | ATB | 1 | Union Industrial Contractors Inc | $1,985,926 | +34% | ODOT | ||
| 260177 | LIC-SR 37-04.09 (INTERSECTION) | LIC | 2 | Shelly Company | $1,607,479 | $1,752,509 | +9.0% | +6.0% | ODOT |
| 260182 | SCI-US 52-21.80 (TWO LANE RESURFACING) | SCI | 1 | Shelly Company | $1,363,320 | +21% | ODOT | ||
| 260190 | D11-SP FY2026 (SPOT PATCHING / PAVEMENT REPAIR) | District 11 | 3 | NLS Paving, Inc | $1,291,463 | $1,354,800 | +5.0% | +41% | ODOT |
| 260191 | POR-SR 303-04.50 (INTERSECTION) | POR | 1 | Karvo Companies Inc | $1,255,541 | +3.0% | ODOT | ||
| 260176 | HAR-SR 67-Sidewalks (SIDEWALK) | HAR | 2 | D L Smith Concrete LLC | $1,068,922 | $1,147,122 | +7.0% | +9.0% | ODOT |
| 260185 | WAS-SR 26-03.75 (INTERSECTION) | WAS | 3 | Shelly & Sands Inc | $934,443 | $977,288 | +5.0% | +9.0% | ODOT |
| 260180 | MOT-CR 74-08.40 (SIGNALIZATION) | MOT | 4 | Capital Electric Line Builders Inc | $818,666 | $840,307 | +3.0% | +38% | ODOT |
| 260184 | WAR-SR 123-16.79 (MINOR RECONSTRUCTION) | WAR | 3 | Barrett Paving Materials Inc | $818,000 | $846,720 | +4.0% | +5.0% | ODOT |
| 260170 | CLE-SR 32-09.80 Herold Rd (INTERSECTION) | CLE | 3 | John R Jurgensen Company | $762,909 | $763,315 | 0.0% | +11% | ODOT |
| 260183 | STA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE)) | STA | 5 | Matt Winters Excavation LLC | $744,413 | $796,619 | +7.0% | -12% | ODOT |
| 260169 | ATH-Nelsonville Mobility Corridor (SIDEWALK) | ATH | 4 | MC Kee Paving & Sealing LLC | $655,947 | $693,827 | +6.0% | -3.0% | ODOT |
| 264008 | PUT-SR 190-05.71 (CULVERT REPLACEMENT) | PUT | 3 | Fenson Contracting LLC | $598,999 | $838,452 | +40% | -38% | ODOT |
| 260133 | PIC-US 23-16.94 (FOUR LANE RESURFACING) | PIC | 2 | Shelly Company | $594,875 | $711,088 | +20% | -14% | ODOT |
| 260172 | D04-TSG FY2026 (SIGNALIZATION) | District 4 | 5 | TC Randel Constructon LLC | $591,998 | $604,955 | +2.0% | +2.0% | ODOT |
| 260189 | ATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT) | ATB | 5 | Bog Construction Inc | $545,956 | $593,000 | +9.0% | -7.0% | ODOT |
| 260181 | PER-TR 358-00.00 (THORN TWP) (BIKEWAYS) | PER | 3 | Shelly Company | $421,583 | $464,526 | +10% | -12% | ODOT |
| 260188 | ASD-SR 60-14.97 (CULVERT REPLACEMENT) | ASD | 5 | Adena Corporation | $389,830 | $410,138 | +5.0% | -9.0% | ODOT |
| 260187 | WYA-Carey SRTS Phase 2 (SIDEWALK) | WYA | 6 | Smith Paving & Excavating Inc | $262,074 | $269,766 | +3.0% | -14% | ODOT |
| 260173 | DAR-Tecumseh Trail RSF Ph 1 (BIKEWAYS) | DAR | 2 | Henry W Bergman Inc | $146,027 | $156,222 | +7.0% | -9.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.