Union Industrial Contractors Inc: ODOT bid record
Union Industrial Contractors Inc submitted 25 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 2 of them (8%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,675,119
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 1 | 25% |
| 2024 | 4 | 0 | 0% |
| 2025 | 3 | 0 | 0% |
| 2026 | 4 | 1 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| GEA | 7 | 0 | 0% |
| ATB | 5 | 1 | 20% |
| LAK | 5 | 0 | 0% |
| CUY | 5 | 1 | 20% |
| District 12 | 2 | 0 | 0% |
| TRU | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 20 | 10 (50%) | $1.00 | $1.00 |
| Guardrail removed | 202E38000 | FT | 16 | 9 (56%) | $2.00 | $2.50 |
| Tack coat | 407E10000 | GAL | 12 | 9 (75%) | $3.00 | $3.25 |
| Guardrail, type MGS | 606E15050 | FT | 14 | 8 (57%) | $20.70 | $22.73 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 15 | 7 (47%) | $1.60 | $2.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 13 | 7 (54%) | $25.00 | $23.50 |
| Anchor assembly, MGS type T | 606E26550 | EACH | 10 | 7 (70%) | $1,135.00 | $1,260.00 |
| Seeding and mulching | 659E10000 | SY | 13 | 6 (46%) | $4.00 | $2.60 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 13 | 6 (46%) | $20.00 | $20.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 16 | 5 (31%) | $925.00 | $950.00 |
| Sign, flat sheet | 630E80100 | SF | 12 | 5 (42%) | $22.50 | $24.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Marucci & Gaffney Excavating Co | 10 | 8 of 10 |
| Ruhlin Company | 10 | 7 of 10 |
| Eclipse Co LLC | 9 | 7 of 9 |
| J D Williamson Construction Co Inc | 8 | 8 of 8 |
| Great Lakes Construction Co | 8 | 4 of 8 |
| Shelly & Sands Inc | 7 | 7 of 7 |
| Catts Construction Inc | 6 | 4 of 6 |
| Suburban Maintenance & Construction Inc | 4 | 1 of 4 |
| A P O'Horo Company | 3 | 3 of 3 |
| Bog Construction Inc | 3 | 3 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260501 | GEA | GEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 4 | $2,994,062 | +34% |
| 11 JUN 2026 | 260282 | ATB | ATB-/TRU-SR 7/VAR-18.62/VAR (PART 1, 2, 3) (BRIDGE REPAIR) | 4 of 4 | $4,972,283 | +30% |
| 09 APR 2026 | 260168 | ATB | ATB-SR 84-13.43 (MINOR RECONSTRUCTION) | 1 of 1 | $1,985,926 | Low |
| 09 APR 2026 | 260189 | ATB | ATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT) | 5 of 5 | $878,016 | +61% |
| 14 AUG 2025 | 250380 | LAK | LAK-SR 283-14.34 Deck (BRIDGE REPAIR) | 4 of 5 | $5,705,568 | +21% |
| 27 FEB 2025 | 250121 | District 12 | D12-West Woods Road Replace (CULVERT REPLACEMENT) | 2 of 2 | $826,294 | +1.0% |
| 13 FEB 2025 | 250073 | GEA | GEA-US 322/SR 44-08.63/14.93 (CULVERT REPLACEMENT) | 4 of 5 | $1,932,389 | +36% |
| 14 NOV 2024 | 240492 | GEA | GEA-SR 87-12.13 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $1,922,543 | +27% |
| 14 NOV 2024 | 240493 | GEA | GEA-US 322-19.41 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $2,565,601 | +24% |
| 08 AUG 2024 | 240392 | LAK | LAK-US 6-04.61 Super (BRIDGE REPAIR) | 2 of 5 | $4,598,750 | +13% |
| 04 APR 2024 | 240209 | GEA | GEA-West Woods Road Replace (CULVERT REPLACEMENT) | 3 of 3 | $881,933 | +15% |
| 11 AUG 2022 | 220461 | ATB | ATB-SR 307-07.64/19.87 (BRIDGE REPAIR) | 5 of 5 | $620,411 | +18% |
| 17 MAR 2022 | 220171 | CUY | CUY-Interurban Pedestrian Bridge (NEW CONSTRUCTION) | 2 of 2 | $888,098 | +42% |
| 27 JAN 2022 | 220042 | CUY | CUY-Ashton Lane Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 6 | $689,193 | Low, -23% under the second |
| 13 JAN 2022 | 223001 | TRU | TRU-SR 46-25.07 (BRIDGE REPAIR) | 5 of 5 | $1,032,170 | +20% |
| 29 APR 2021 | 210270 | LAK | LAK-SR 306-05.18 Deck (BRIDGE REPAIR) | 4 of 5 | $4,742,465 | +12% |
| 11 MAR 2021 | 210145 | CUY | CUY-IR 480-22.41 Subdeck (BRIDGE REPAIR) | 2 of 13 | $169,424 | +4.0% |
| 11 FEB 2021 | 210081 | CUY | CUY-IR 90-14.52 Deck (BRIDGE REPAIR) | 4 of 5 | $3,574,261 | +19% |
| 28 JAN 2021 | 210056 | GEA | GEA-US 422-12.26 Deck (BRIDGE REPAIR) | 8 of 8 | $3,047,365 | +23% |
| 14 JAN 2021 | 210018 | GEA | GEA-SR 166-01.08 (CULVERT REPLACEMENT) | 6 of 11 | $236,593 | +26% |
| 17 DEC 2020 | 200563 | CUY | CUY-IR 480-07.27 Deck (BRIDGE REPAIR) | 8 of 9 | $4,431,183 | +30% |
| 03 DEC 2020 | 200568 | LAK | LAK-IR 271-01.27 Deck (BRIDGE REPAIR) | 6 of 7 | $2,801,170 | +39% |
| 13 AUG 2020 | 200434 | District 12 | D12-MNT FY2020 Drainage (CULVERT REPLACEMENT) | 8 of 8 | $574,491 | +57% |
| 13 AUG 2020 | 200435 | LAK | LAK-SR 44-02.20 Culvert (MISCELLANEOUS) | 3 of 9 | $176,423 | +75% |
| 13 FEB 2020 | 200045 | ATB | ATB-US 20/SR 45-19.13/08.28 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 8 | $1,721,865 | +34% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.