Bog Construction Inc: ODOT bid record

Bog Construction Inc submitted 52 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 27 AUG 2026, and was the low bidder on 24 of them (46%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$13,307,694
Latest bid
27 AUG 2026
Data through
12 NOV 2026
52Bids
24Low bids
46Win rate, percent
+12%Median gap to the low bid when not low, 28 bids

By year

YearBidsLow bidsWin rate
202015533%
202110550%
202214643%
202311100%
20244125%
202533100%
20265360%
Bog Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL10440%
ATB5120%
CAR5240%
COL5360%
HOL5360%
HAS4250%
TUS3133%
STA300%
GEA33100%
COS200%
JEF2150%
TRU22100%
Bog Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5454 (100%)$1.00$1.00
Water659E35000MGAL4636 (78%)$1.00$1.00
Asphalt concrete for maintaining traffic614E13000CY3616 (44%)$122.50$250.00
Soil analysis test659E00100EACH3715 (41%)$50.00$115.50
Field office, type B619E16010MNTH2514 (56%)$500.00$2,000.00
Excavation203E10000CY4813 (27%)$27.50$27.00
Topsoil659E00300CY4211 (26%)$35.00$45.00
Concrete masonry602E20000CY2210 (45%)$1,750.00$2,300.00
Portable barrier, unanchored622E41100FT1910 (53%)$16.00$24.34
Rock channel protection, type C with filter601E32200CY1310 (77%)$100.00$176.55
Field office, type A619E16000MNTH169 (56%)$500.00$1,400.00
Aggregate base304E20000CY418 (20%)$110.00$90.00
Bog Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Bog Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
27 AUG 2026264020CARCAR-SR 164-10.22/11.98/17.32 (CULVERT REPLACEMENT)1 of 2$708,579Low, 26% under the second
23 APR 2026264010JEFJEF-Wintersville Sidewalk Improv (SIDEWALK)1 of 3$291,808Low, 37% under the second
09 APR 2026260189ATBATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT)1 of 5$545,956Low, 9.0% under the second
26 MAR 2026260157STASTA-SR 241-14.58 (SRTS) (SIDEWALK)2 of 5$450,761+14%
15 JAN 2026264000COLCOL-SR 644-07.96 (MISCELLANEOUS)4 of 4$1,092,836+64%
27 MAR 2025254012GEAGEA-SR 528-10.71/14.87 (CULVERT REPLACEMENT)1 of 4$630,304Low, -12% under the second
27 FEB 2025254009LAKLAK-SR 84-30.86 Replace (CULVERT REPLACEMENT)1 of 4$585,274Low, -6.0% under the second
16 JAN 2025250006COLCOL-SR 170-20.03 (CULVERT REPLACEMENT)1 of 10$599,986Low, 3.0% under the second
31 OCT 2024240486COLCOL-SR 172-10.80 (CULVERT REPLACEMENT)5 of 7$413,327+15%
31 OCT 2024244023TRUTRU-SR 46-11.20 (BRIDGE REPAIR)1 of 4$778,352Low, 5.0% under the second
26 SEP 2024240433COSCOS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE))6 of 11$718,433+30%
08 AUG 2024244018TUSTUS-SR 212-07.84 (CULVERT REPLACEMENT)2 of 4$518,809+3.0%
24 AUG 2023234020HOLHOL-SR 83-11.91 (BRIDGE REPAIR)1 of 3$849,150Low, 17% under the second
15 DEC 2022224032HASHAS-SR 9-17.78 (BRIDGE REPAIR)1 of 3$518,656Low, 0.0% under the second
11 AUG 2022220461ATBATB-SR 307-07.64/19.87 (BRIDGE REPAIR)2 of 5$580,622+11%
28 JUL 2022220456HOLHOL-SR 514-04.51 (SPOT PATCHING / PAVEMENT REPAIR)1 of 3$261,822Low, 25% under the second
26 MAY 2022220332BELBEL-SR 148-11.35 (BRIDGE REPAIR)2 of 3$828,907+3.0%
26 MAY 2022220335CARCAR-SR 542-05.61 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$1,485,250Low, 11% under the second
26 MAY 2022220345HASHAS-US 250-03.91 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 3$827,490Low, 45% under the second
12 MAY 2022220291COLCOL-SR 45-03.36 (CULVERT REPLACEMENT)1 of 6$556,775Low, 11% under the second
28 APR 2022220262BELBEL-CR 56-33.21/34.26 (SLIDE REPAIR)3 of 7$492,297+15%
28 APR 2022220286HASHAS-SR 151-24.96 (SLIDE REPAIR)4 of 6$1,592,925+28%
31 MAR 2022220227HOLHOL-US 62-15.03 (SLIDE REPAIR)5 of 5$704,443+30%
10 MAR 2022224011STASTA-SR 21-02.80 (CULVERT REPLACEMENT)2 of 3$630,094+2.0%
17 FEB 2022224010TUSTUS-SR 212-10.80 (CULVERT REPLACEMENT)2 of 5$617,044+1.0%
Bog Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy