Bog Construction Inc: ODOT bid record
Bog Construction Inc submitted 52 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 27 AUG 2026, and was the low bidder on 24 of them (46%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $13,307,694
- Latest bid
- 27 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 5 | 33% |
| 2021 | 10 | 5 | 50% |
| 2022 | 14 | 6 | 43% |
| 2023 | 1 | 1 | 100% |
| 2024 | 4 | 1 | 25% |
| 2025 | 3 | 3 | 100% |
| 2026 | 5 | 3 | 60% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 10 | 4 | 40% |
| ATB | 5 | 1 | 20% |
| CAR | 5 | 2 | 40% |
| COL | 5 | 3 | 60% |
| HOL | 5 | 3 | 60% |
| HAS | 4 | 2 | 50% |
| TUS | 3 | 1 | 33% |
| STA | 3 | 0 | 0% |
| GEA | 3 | 3 | 100% |
| COS | 2 | 0 | 0% |
| JEF | 2 | 1 | 50% |
| TRU | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 54 | 54 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 46 | 36 (78%) | $1.00 | $1.00 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 36 | 16 (44%) | $122.50 | $250.00 |
| Soil analysis test | 659E00100 | EACH | 37 | 15 (41%) | $50.00 | $115.50 |
| Field office, type B | 619E16010 | MNTH | 25 | 14 (56%) | $500.00 | $2,000.00 |
| Excavation | 203E10000 | CY | 48 | 13 (27%) | $27.50 | $27.00 |
| Topsoil | 659E00300 | CY | 42 | 11 (26%) | $35.00 | $45.00 |
| Concrete masonry | 602E20000 | CY | 22 | 10 (45%) | $1,750.00 | $2,300.00 |
| Portable barrier, unanchored | 622E41100 | FT | 19 | 10 (53%) | $16.00 | $24.34 |
| Rock channel protection, type C with filter | 601E32200 | CY | 13 | 10 (77%) | $100.00 | $176.55 |
| Field office, type A | 619E16000 | MNTH | 16 | 9 (56%) | $500.00 | $1,400.00 |
| Aggregate base | 304E20000 | CY | 41 | 8 (20%) | $110.00 | $90.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 24 | 5 of 24 |
| Shelly & Sands Inc | 17 | 5 of 17 |
| Ohio-West Virginia Excavating Co | 14 | 8 of 14 |
| Alan Stone Co Inc | 12 | 4 of 12 |
| Stanley Miller Construction Company | 11 | 1 of 11 |
| R C Construction Company and Son Inc | 8 | 2 of 8 |
| Black Horse Bridge Construction Inc | 7 | 3 of 7 |
| Jet Excavating Company | 7 | 2 of 7 |
| J & J Bridge Company Inc | 7 | 2 of 7 |
| Litman Excavating Inc | 6 | 2 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | 264020 | CAR | CAR-SR 164-10.22/11.98/17.32 (CULVERT REPLACEMENT) | 1 of 2 | $708,579 | Low, 26% under the second |
| 23 APR 2026 | 264010 | JEF | JEF-Wintersville Sidewalk Improv (SIDEWALK) | 1 of 3 | $291,808 | Low, 37% under the second |
| 09 APR 2026 | 260189 | ATB | ATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT) | 1 of 5 | $545,956 | Low, 9.0% under the second |
| 26 MAR 2026 | 260157 | STA | STA-SR 241-14.58 (SRTS) (SIDEWALK) | 2 of 5 | $450,761 | +14% |
| 15 JAN 2026 | 264000 | COL | COL-SR 644-07.96 (MISCELLANEOUS) | 4 of 4 | $1,092,836 | +64% |
| 27 MAR 2025 | 254012 | GEA | GEA-SR 528-10.71/14.87 (CULVERT REPLACEMENT) | 1 of 4 | $630,304 | Low, -12% under the second |
| 27 FEB 2025 | 254009 | LAK | LAK-SR 84-30.86 Replace (CULVERT REPLACEMENT) | 1 of 4 | $585,274 | Low, -6.0% under the second |
| 16 JAN 2025 | 250006 | COL | COL-SR 170-20.03 (CULVERT REPLACEMENT) | 1 of 10 | $599,986 | Low, 3.0% under the second |
| 31 OCT 2024 | 240486 | COL | COL-SR 172-10.80 (CULVERT REPLACEMENT) | 5 of 7 | $413,327 | +15% |
| 31 OCT 2024 | 244023 | TRU | TRU-SR 46-11.20 (BRIDGE REPAIR) | 1 of 4 | $778,352 | Low, 5.0% under the second |
| 26 SEP 2024 | 240433 | COS | COS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 11 | $718,433 | +30% |
| 08 AUG 2024 | 244018 | TUS | TUS-SR 212-07.84 (CULVERT REPLACEMENT) | 2 of 4 | $518,809 | +3.0% |
| 24 AUG 2023 | 234020 | HOL | HOL-SR 83-11.91 (BRIDGE REPAIR) | 1 of 3 | $849,150 | Low, 17% under the second |
| 15 DEC 2022 | 224032 | HAS | HAS-SR 9-17.78 (BRIDGE REPAIR) | 1 of 3 | $518,656 | Low, 0.0% under the second |
| 11 AUG 2022 | 220461 | ATB | ATB-SR 307-07.64/19.87 (BRIDGE REPAIR) | 2 of 5 | $580,622 | +11% |
| 28 JUL 2022 | 220456 | HOL | HOL-SR 514-04.51 (SPOT PATCHING / PAVEMENT REPAIR) | 1 of 3 | $261,822 | Low, 25% under the second |
| 26 MAY 2022 | 220332 | BEL | BEL-SR 148-11.35 (BRIDGE REPAIR) | 2 of 3 | $828,907 | +3.0% |
| 26 MAY 2022 | 220335 | CAR | CAR-SR 542-05.61 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 6 | $1,485,250 | Low, 11% under the second |
| 26 MAY 2022 | 220345 | HAS | HAS-US 250-03.91 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 3 | $827,490 | Low, 45% under the second |
| 12 MAY 2022 | 220291 | COL | COL-SR 45-03.36 (CULVERT REPLACEMENT) | 1 of 6 | $556,775 | Low, 11% under the second |
| 28 APR 2022 | 220262 | BEL | BEL-CR 56-33.21/34.26 (SLIDE REPAIR) | 3 of 7 | $492,297 | +15% |
| 28 APR 2022 | 220286 | HAS | HAS-SR 151-24.96 (SLIDE REPAIR) | 4 of 6 | $1,592,925 | +28% |
| 31 MAR 2022 | 220227 | HOL | HOL-US 62-15.03 (SLIDE REPAIR) | 5 of 5 | $704,443 | +30% |
| 10 MAR 2022 | 224011 | STA | STA-SR 21-02.80 (CULVERT REPLACEMENT) | 2 of 3 | $630,094 | +2.0% |
| 17 FEB 2022 | 224010 | TUS | TUS-SR 212-10.80 (CULVERT REPLACEMENT) | 2 of 5 | $617,044 | +1.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.