Stanley Miller Construction Company: ODOT bid record
Stanley Miller Construction Company submitted 95 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 AUG 2026, and was the low bidder on 19 of them (20%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $12,171,786
- Latest bid
- 13 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 19 | 3 | 16% |
| 2021 | 18 | 4 | 22% |
| 2022 | 11 | 4 | 36% |
| 2023 | 5 | 0 | 0% |
| 2024 | 12 | 4 | 33% |
| 2025 | 22 | 4 | 18% |
| 2026 | 8 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 11 | 2 | 18% |
| STA | 10 | 2 | 20% |
| TUS | 10 | 3 | 30% |
| MED | 7 | 3 | 43% |
| HOL | 7 | 0 | 0% |
| WAY | 5 | 2 | 40% |
| ASD | 5 | 0 | 0% |
| COL | 5 | 1 | 20% |
| CAR | 4 | 1 | 25% |
| RIC | 4 | 0 | 0% |
| SUM | 3 | 0 | 0% |
| HAS | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 92 | 92 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 85 | 74 (87%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 59 | 42 (71%) | $1.00 | $3.00 |
| Commercial fertilizer | 659E20000 | TON | 85 | 33 (39%) | $800.00 | $850.00 |
| Lime | 659E31000 | ACRE | 82 | 20 (24%) | $150.00 | $150.00 |
| Topsoil | 659E00300 | CY | 74 | 19 (26%) | $44.75 | $45.00 |
| Repair seeding and mulching | 659E14000 | SY | 64 | 19 (30%) | $1.00 | $1.25 |
| Concrete masonry | 602E20000 | CY | 47 | 17 (36%) | $1,610.00 | $2,300.00 |
| Field office, type B | 619E16010 | MNTH | 43 | 14 (33%) | $1,000.00 | $2,000.00 |
| RPM | 621E00100 | EACH | 29 | 13 (45%) | $250.00 | $52.92 |
| Inter-seeding | 659E15000 | SY | 34 | 11 (32%) | $1.00 | $1.00 |
| 1" preformed expansion joint filler | 516E13600 | SF | 24 | 10 (42%) | $3.52 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 43 | 15 of 43 |
| Shelly & Sands Inc | 36 | 22 of 36 |
| Ohio-West Virginia Excavating Co | 22 | 14 of 22 |
| Lockhart Concrete Co | 20 | 3 of 20 |
| Adena Corporation | 18 | 16 of 18 |
| BCC Ohio Inc | 17 | 12 of 17 |
| S E T Inc | 14 | 3 of 14 |
| Tucson Inc | 13 | 9 of 13 |
| Black Horse Bridge Construction Inc | 13 | 7 of 13 |
| Bog Construction Inc | 11 | 10 of 11 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | 260363 | HAS | HAS-Bridge St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 5 | $2,408,305 | +15% |
| 13 AUG 2026 | 260369 | RIC | RIC-/WAY-IR 71/SR 226-19.61/05.26 (CULVERT REPLACEMENT) | 3 of 3 | $1,435,942 | +106% |
| 30 JUL 2026 | 260349 | HAM | HAM-Inverts FY2027 (CULVERT REPLACEMENT) | 5 of 5 | $2,862,531 | +52% |
| 09 APR 2026 | 260183 | STA | STA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $796,619 | +7.0% |
| 26 MAR 2026 | 260157 | STA | STA-SR 241-14.58 (SRTS) (SIDEWALK) | 5 of 5 | $555,436 | +41% |
| 12 MAR 2026 | 268002 | LAW | LAW-SR 7-13.63 (CULVERT REPLACEMENT) | 3 of 4 | $367,512 | +61% |
| 19 FEB 2026 | 260099 | TUS | TUS-W. 3rd Street Bridge (BRIDGE REPAIR) | 2 of 4 | $1,904,614 | +17% |
| 29 JAN 2026 | 260074 | HOL | HOL-SR 179-03.89 (BRIDGE REPAIR) | 5 of 5 | $2,094,371 | +94% |
| 18 DEC 2025 | 250580 | BEL | BEL-TR 428-00.30 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $884,486 | Low, 7.0% under the second |
| 18 DEC 2025 | 250594 | NOB | NOB-CEVSD Campus Connectivity (SIDEWALK) | 2 of 5 | $2,099,551 | +3.0% |
| 13 NOV 2025 | 250529 | MAH | MAH-Afton Ave (SRTS) (SIDEWALK) | 4 of 6 | $324,843 | +34% |
| 23 OCT 2025 | 250490 | COL | COL-SR 164-01.66 (CULVERT REPLACEMENT) | 2 of 9 | $484,876 | +1.0% |
| 23 OCT 2025 | 250513 | HUR | HUR-SR 303-02.42 (CULVERT REPLACEMENT) | 7 of 8 | $289,642 | +36% |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 8 of 9 | $1,498,414 | +24% |
| 14 AUG 2025 | 250384 | WAY | WAY-BH FY2026 (CULVERT REPLACEMENT) | 2 of 3 | $749,277 | +64% |
| 31 JUL 2025 | 250365 | TUS | TUS-IR 77-01.21 (CULVERT REPLACEMENT) | 3 of 4 | $448,559 | +50% |
| 17 JUL 2025 | 250339 | BEL | BEL-SR 149-02.11 (CULVERT REPLACEMENT) | 5 of 7 | $1,429,345 | +63% |
| 17 JUL 2025 | 250341 | BEL | BEL-IR 70-10.08 (CULVERT REPLACEMENT) | 4 of 4 | $623,880 | +79% |
| 08 MAY 2025 | 250261 | SUM | SUM-Barberton Sidewalks (SIDEWALK) | 3 of 3 | $971,741 | +29% |
| 24 APR 2025 | 250214 | CAR | CAR-Magnolia Sidewalks (SIDEWALK) | 1 of 4 | $519,849 | Low, 13% under the second |
| 24 APR 2025 | 250227 | STA | STA-Minerva Bridge (BIKEWAYS) | 2 of 3 | $755,787 | +2.0% |
| 10 APR 2025 | 250200 | STA | STA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT) | 1 of 5 | $330,889 | Low, 12% under the second |
| 27 MAR 2025 | 250166 | TUS | TUS-Gnadenhutten Streetscape (SIDEWALK) | 1 of 3 | $1,259,126 | Low, 1.0% under the second |
| 27 MAR 2025 | 250167 | TUS | TUS-Heritage Drive Sidewalks (SIDEWALK) | 5 of 5 | $829,192 | +23% |
| 27 MAR 2025 | 258002 | ASD | ASD-US 30-09.32L Bridge Hit (BRIDGE REPAIR) | 5 of 5 | $292,372 | +193% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.