S E T Inc: ODOT bid record

S E T Inc submitted 115 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 7 of them (6%). When it was not low, its total sat a median +24% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,998,846
Latest bid
12 NOV 2026
Data through
12 NOV 2026
115Bids
7Low bids
6Win rate, percent
+24%Median gap to the low bid when not low, 108 bids

By year

YearBidsLow bidsWin rate
20201119%
20212314%
20221000%
20231417%
202413323%
20252100%
20262314%
S E T Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MAH1318%
STA1318%
MED900%
COL8225%
GEA8113%
TRU800%
CUY800%
District 4600%
SUM6117%
ATB500%
JEF500%
POR500%
S E T Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH115115 (100%)$1.00$1.00
Law enforcement officer with patrol car for assistance614E11110HR7931 (39%)$80.00$80.00
Aggregate base304E20000CY7224 (33%)$84.00$90.00
Excavation203E10000CY8421 (25%)$26.00$27.00
Pull box, 725.08, 24"625E30706EACH3420 (59%)$1,043.00$1,229.10
Embankment203E20000CY8619 (22%)$22.00$25.00
Pull box, 725.08, 18"625E30700EACH3019 (63%)$847.00$1,000.00
Removal of existing pavement marking512E74500FT1919 (100%)$2.10$3.00
Water616E10000MGAL6518 (28%)$51.25$20.00
Subgrade compaction204E10000SY7917 (22%)$2.00$3.00
Field office, type B619E16010MNTH6817 (25%)$1,500.00$2,000.00
Non-tracking tack coat407E20000GAL5816 (28%)$3.62$3.25
S E T Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

S E T Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260491BELBEL-SR 7-25.27 (SLIDE REPAIR)4 of 8$1,179,153+40%
12 NOV 2026260512TRUTRU-SR 534-22.36/26.04 (BRIDGE REPAIR)4 of 5$1,970,364+22%
29 OCT 2026260399CUYCUY-US 422-16.20 Interchange (INTERCHANGE)2 of 4$12,124,213+7.0%
29 OCT 2026260468MAHMAH-SR 46-13.55 (PART 1 AND PART 2) (INTERSECTION)4 of 4$8,370,000+28%
15 OCT 2026260482District 11D11-DS-FY2027 (BRIDGE REPAIR)3 of 4$1,469,825+20%
01 OCT 2026260419BELBEL-IR 70-19.19 (CULVERT REPLACEMENT)2 of 4$8,791,659+17%
01 OCT 2026260422District 3D03-BH FY2027 (A) (BRIDGE REPAIR)5 of 5$1,186,695+66%
01 OCT 2026260429MEDMED-SR 3-20.63 (INTERSECTION)5 of 6$2,143,016+16%
01 OCT 2026260435SANSAN-US 6-17.51 Med Parapet Repr (BRIDGE REPAIR)3 of 3$951,495+112%
17 SEP 2026260402CUYCUY-Cle Downtown Connector Trl 1 (BIKEWAYS)3 of 5$1,600,330+20%
17 SEP 2026260406GEAGEA-Chardon TSG upgrade (SIGNALIZATION)1 of 3$1,610,000Low, 0.0% under the second
27 AUG 2026260388MEDMED-SR 162-25.11 (INTERSECTION)2 of 4$2,018,670+23%
27 AUG 2026260391CUYCUY-IR 480-11.64 BH (BRIDGE REPAIR)5 of 6$619,502+42%
13 AUG 2026260332STASTA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION)4 of 4$10,466,954+46%
13 AUG 2026268017ATBATB-US 6-22.78 (CULVERT REPLACEMENT)3 of 3$480,545+40%
30 JUL 2026260354MAHMAH-US 224-17.72 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION)3 of 4$15,490,000+8.0%
25 JUN 2026268014PORPOR-/SUM Culverts FY2026 (CULVERT REPLACEMENT)2 of 3$1,349,754+9.0%
07 MAY 2026260242JEFJEF-SR 7-13.95 (MISCELLANEOUS)2 of 3$7,827,875+33%
07 MAY 2026260258District 12D12-TSG FY2026 (SIGNALIZATION)2 of 3$414,000+22%
09 APR 2026260172District 4D04-TSG FY2026 (SIGNALIZATION)4 of 5$698,000+18%
09 APR 2026260183STASTA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 5$1,282,374+72%
09 APR 2026260189ATBATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT)4 of 5$728,571+33%
15 JAN 2026260019JEFJEF-SR 213-04.51 (SLIDE REPAIR)8 of 8$2,446,803+72%
18 DEC 2025250598TRUTRU-US 422-08.01 (SIGNALIZATION)4 of 6$223,000+9.0%
04 DEC 2025250556GEAGEA-/LAK-SR 44-18.39/00.00 Rehab (MINOR RECONSTRUCTION)3 of 3$12,483,651+18%
S E T Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy