ODOT contract 260019 bid tabulation

JEF-SR 213-04.51 (SLIDE REPAIR). Let by Ohio DOT on January 15, 2026, JEF. 8 bids received; low bid $1,423,293 by Marucci & Gaffney Excavating Co, -23% against the engineer's estimate of $1,854,000.

Owner
Ohio DOT
Letting
15 JAN 2026
Pay items
62
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Marucci & Gaffney Excavating Co$1,423,293Low-23%
2Rudzik Excavating Inc$1,518,470+7.0%-18%
3Cast & Baker Corporation$1,534,031+8.0%-17%
4Mike Pusateri Excavating Inc$1,566,430+10%-16%
5HK Concrete LLC$1,621,906+14%-13%
6Shelly & Sands Inc$1,834,428+29%-1.0%
7Eclipse Co LLC$2,299,155+62%+24%
8S E T Inc$2,446,803+72%+32%
ODOT contract 260019: bids by rank

Engineer's estimate: $1,854,000.

Bid tabulation

LinePay itemUnitQuantity1. Marucci & Gaffney Excavating Co2. Rudzik Excavating Inc3. Cast & Baker Corporation4. Mike Pusateri Excavating Inc5. HK Concrete LLC6. Shelly & Sands Inc
1Clearing and grubbing (201E11000)LS1$125,000$112,995$70,000$141,762$33,000$175,600
2Pavement removed (202E23000)SY2,286$8.73$12.00$20.00$4.90$6.50$17.00
3Pipe removed, 24" and under (202E35100)FT53$35.00$10.00$20.00$38.50$36.50$42.00
4Guardrail removed (202E38000)FT878$2.25$3.30$6.00$2.36$6.00$7.00
5Catch basin removed (202E58100)EACH1$250.00$500.00$1,000.00$350.00$500.00$400.00
6Removal misc.: post removed (202E98100)EACH2$50.00$250.00$18.00$40.00$150.00$150.00
7Excavation (203E10000)CY37,455$12.99$13.09$14.00$11.60$14.50$15.75
8Excavation, as per plan (203E10001)CY16,709$12.99$18.00$14.00$18.25$23.25$20.00
9Embankment (203E20000)CY201$5.00$30.00$10.00$26.50$10.70$20.00
10Subgrade compaction (204E10000)SY2,607$1.50$1.00$3.00$2.00$2.50$4.00
11Excavation of subgrade (204E13000)CY302$15.00$25.00$15.00$39.00$31.00$38.00
12Granular material, type B, as per plan (204E30011)CY302$65.00$95.33$122.00$109.40$87.00$115.00
13Proof rolling (204E45000)HR1$50.00$400.00$750.00$375.00$140.00$280.00
14Guardrail, type MGS with long posts (606E15100)FT833$29.00$26.86$27.00$27.62$27.25$29.00
15Monument assembly, type C (623E38500)EACH5$2,000.00$1,865.30$1,800.00$3,175.00$1,500.00$2,000.00
16Monument assembly removed and reset (623E40000)EACH3$1,000.00$1,660.00$5,500.00$2,875.00$2,000.00$2,100.00
17Tied concrete block mat with type 1 underlayment (601E21050)SY726$65.00$50.00$100.00$96.00$87.00$54.00
18Soil analysis test (659E00100)EACH2$50.00$165.00$150.00$29.50$30.00$150.00
19Topsoil (659E00300)CY371$35.00$18.00$40.00$38.00$42.50$23.00
20Seeding and mulching (659E10000)SY3,342$0.75$1.32$2.00$1.07$1.00$1.20
21Seeding and mulching, as per plan (659E10001)SY11,678$2.20$1.10$1.10$1.18$1.10$1.00
22Repair seeding and mulching (659E14000)SY167$0.27$1.00$1.10$1.18$1.10$1.00
23Inter-seeding (659E15000)SY167$0.27$1.00$1.10$0.02$0.20$1.00
24Commercial fertilizer (659E20000)TON2.05$400.00$1,375.00$1,400.00$295.00$275.00$1,250.00
25Lime (659E31000)ACRE3.10$20.00$150.00$160.00$29.50$28.00$150.00
26Water (659E35000)MGAL81$0.01$1.00$1.10$2.00$1.00$1.00
27Storm water pollution prevention plan (832E15000)LS1$3,200.00$2,200.00$5,500.00$6,231.95$2,500.00$2,100.00
28Storm water pollution prevention inspections (832E15002)LS1$7,490.00$7,568.00$10,000$5,161.60$5,000.00$7,500.00
29Storm water pollution prevention inspection software (832E15010)LS1$10,500$10,000$12,000$645.20$12,000$10,500
30Erosion control (832E30000)EACH40,000$1.00$1.00$1.00$1.00$1.00$1.00
31Aggregate drains (605E31100)FT490$23.00$18.00$12.00$19.95$19.50$42.00
3224" conduit, type D (611E10900)FT96$84.88$145.00$100.00$142.90$105.50$130.00
33Asphalt concrete base, PG64-22, (449) (301E56000)CY251$230.00$269.50$245.00$283.20$308.00$230.00
34Aggregate base (304E20000)CY403$97.25$115.33$115.00$100.35$87.00$120.00
35Non-tracking tack coat (407E20000)GAL328$3.50$3.85$3.25$7.10$3.40$3.50
36Prime coat, as per plan (408E10001)GAL280$12.50$9.35$10.00$10.05$6.00$12.50
37Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY76$230.00$412.50$310.00$401.20$560.00$230.00
38Asphalt concrete intermediate course, type 2, (449) (441E70300)CY107$230.00$330.00$265.00$354.00$353.00$230.00
396" non-reinforced concrete pavement, class QC MS (452E10050)SY89$150.00$215.00$105.00$175.00$74.25$135.00
40Compacted aggregate (617E10100)CY156$90.00$104.50$150.00$172.00$100.00$88.00
41RPM (621E00100)EACH33$100.00$110.00$105.00$141.60$132.00$100.00
42Raised pavement marker removed (621E54000)EACH33$1.00$35.00$0.01$40.00$30.00$15.00
43Barrier reflector, type 2 (bidirectional) (626E00110)EACH18$13.00$13.86$12.00$15.22$13.00$13.00
44Ground mounted support, no. 3 post (630E03100)FT113.40$27.50$30.25$17.00$31.95$16.50$27.50
45Sign post reflector (630E08600)EACH14$55.00$60.50$30.00$113.70$31.00$55.00
46Sign, flat sheet (630E80100)SF66$45.00$49.50$33.00$37.28$33.00$45.00
47Removal of ground mounted sign and disposal (630E84900)EACH22$75.00$50.00$17.00$19.55$16.50$75.00
48Removal of ground mounted post support and disposal (630E86002)EACH14$75.00$50.00$17.00$75.00$16.50$75.00
49Edge line, 6" (646E10010)MI0.31$8,000.00$8,800.00$14,000$9,440.00$14,300$8,500.00
50Center line (646E10200)MI0.16$8,000.00$8,800.00$23,000$9,440.00$22,550$16,500
51Law enforcement officer with patrol car for assistance (614E11110)HR50$40.00$65.00$65.00$225.00$100.00$97.00
52Detour signing (614E12420)LS1$20,000$4,015.00$4,000.00$13,500$9,350.00$3,650.00
53Asphalt concrete for maintaining traffic (614E13000)CY50$100.00$193.60$450.00$225.00$300.00$425.00
54Work zone center line, class II, 642 paint (614E21500)MI0.16$1,000.00$4,200.00$3,500.00$4,484.00$4,180.00$3,200.00
55Work zone center line, class III, 642 paint (614E21550)MI0.16$3,200.00$3,520.00$3,500.00$4,484.00$4,180.00$3,200.00
56Work zone edge line, class III, 6", 642 paint (614E22360)MI0.31$1,650.00$1,815.00$1,800.00$4,484.00$4,180.00$1,650.00
57Water (616E10000)MGAL110$1.00$50.00$150.00$2.00$15.00$65.00
58Premium for contract performance bond and for payment bond (103E05000)LS1$12,000$14,430$14,000$18,574$28,000$13,310
59Maintaining traffic (614E11000)LS1$33,000$12,150$3,500.00$15,750$15,000$9,500.00
60Field office, type B (619E16010)MNTH8$500.00$1,600.00$1,500.00$2,875.00$3,000.00$4,800.00
61Construction layout stakes and surveying (623E10000)LS1$24,000$10,000$28,000$10,000$24,475$38,000
62Mobilization (624E10000)LS1$45,000$41,500$40,000$34,795$17,000$90,000
ODOT contract 260019: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy