Mike Pusateri Excavating Inc: ODOT bid record

Mike Pusateri Excavating Inc submitted 13 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 15 JAN 2026, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +40% above the low bid.

Owner
Ohio DOT
Low bid volume
$334,598
Latest bid
15 JAN 2026
Data through
12 NOV 2026
13Bids
1Low bids
8Win rate, percent
+40%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20207114%
2021100%
2022400%
2026100%
Mike Pusateri Excavating Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
COL4125%
BEL200%
JEF200%
HOL200%
HAS100%
MAH100%
CUY100%
Mike Pusateri Excavating Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1313 (100%)$1.00$1.00
Water616E10000MGAL97 (78%)$2.50$20.00
Embankment203E20000CY113 (27%)$24.00$25.00
Pavement removed202E23000SY103 (30%)$13.45$17.00
Topsoil659E00300CY112 (18%)$38.00$45.00
Lime659E31000ACRE102 (20%)$58.53$150.00
Concrete masonry602E20000CY52 (40%)$1,960.00$2,300.00
Subgrade compaction204E10000SY121 (8%)$2.50$3.00
Water659E35000MGAL111 (9%)$2.00$1.00
Commercial fertilizer659E20000TON111 (9%)$615.28$850.00
Tack coat407E10000GAL111 (9%)$3.45$3.25
Excavation203E10000CY101 (10%)$19.25$27.00
Mike Pusateri Excavating Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Eclipse Co LLC116 of 11
Rudzik Excavating Inc95 of 9
Shelly & Sands Inc94 of 9
Tucson Inc64 of 6
Marucci & Gaffney Excavating Co64 of 6
Ohio-West Virginia Excavating Co66 of 6
Lockhart Concrete Co53 of 5
Glenn O Hawbaker Inc43 of 4
S E T Inc40 of 4
Dennison Bridge Inc31 of 3
Mike Pusateri Excavating Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 JAN 2026260019JEFJEF-SR 213-04.51 (SLIDE REPAIR)4 of 8$1,566,430+10%
15 DEC 2022220653COLCOL-East Lincoln St Conn Trail (BIKEWAYS)2 of 5$1,067,301+1.0%
29 SEP 2022220533CUYCUY-US 422-18.74/VAR Slide (SLIDE REPAIR)9 of 11$1,315,764+56%
12 MAY 2022220291COLCOL-SR 45-03.36 (CULVERT REPLACEMENT)6 of 6$850,769+53%
12 MAY 2022220299MAHMAH-McGaffney St Extension Ph 2 (NEW CONSTRUCTION)3 of 7$393,653+14%
15 APR 2021210228COLCOL-SR 45-01.51 (CULVERT REPLACEMENT)3 of 3$290,972+17%
03 DEC 2020207047HASHAS-SR 342-01.79 (SLIDE REPAIR)7 of 14$104,645+26%
01 OCT 2020200470HOLHOL-SR 557-06.90 (SLIDE REPAIR)10 of 10$459,606+85%
01 OCT 2020200471HOLHOL-SR 83-09.98 (CULVERT REPLACEMENT)11 of 11$331,257+41%
17 SEP 2020207041BELBEL-SR 148-09.36 (SLIDE REPAIR)5 of 7$138,538+43%
30 JUL 2020200405BELBEL-SR 149-12.71 (SLIDE REPAIR)4 of 8$956,552+39%
30 JUL 2020200411JEFJEF-SR 164-09.40 (SLIDE REPAIR)8 of 9$312,203+49%
23 JAN 2020207002COLCOL-US 30-33.26 (SLIDE REPAIR)1 of 11$334,598Low, 24% under the second
Mike Pusateri Excavating Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way