Lockhart Concrete Co: ODOT bid record
Lockhart Concrete Co submitted 69 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 18 APR 2024, and was the low bidder on 2 of them (3%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,425,884
- Latest bid
- 18 APR 2024
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 40 | 2 | 5% |
| 2021 | 17 | 0 | 0% |
| 2022 | 7 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MED | 11 | 0 | 0% |
| STA | 11 | 0 | 0% |
| CUY | 8 | 0 | 0% |
| HUR | 3 | 1 | 33% |
| SUM | 3 | 0 | 0% |
| COL | 3 | 0 | 0% |
| TRU | 3 | 0 | 0% |
| JEF | 3 | 0 | 0% |
| HOL | 3 | 0 | 0% |
| POR | 3 | 0 | 0% |
| GEA | 2 | 1 | 50% |
| LOR | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 66 | 66 (100%) | $1.00 | $1.00 |
| Aggregate base | 304E20000 | CY | 44 | 31 (70%) | $52.50 | $90.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 33 | 22 (67%) | $55.00 | $80.00 |
| Field office, type B | 619E16010 | MNTH | 37 | 20 (54%) | $650.00 | $2,000.00 |
| Concrete masonry | 602E20000 | CY | 36 | 19 (53%) | $1,200.00 | $2,300.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 22 | 18 (82%) | $1.00 | $1.75 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 19 | 18 (95%) | $13.00 | $34.00 |
| Seeding and mulching | 659E10000 | SY | 49 | 17 (35%) | $2.00 | $2.60 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 21 | 17 (81%) | $50.00 | $125.00 |
| Excavation | 203E10000 | CY | 58 | 15 (26%) | $20.00 | $27.00 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | 43 | 13 (30%) | $225.00 | $235.00 |
| RPM | 621E00100 | EACH | 28 | 13 (46%) | $207.50 | $52.92 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 43 | 29 of 43 |
| Shelly & Sands Inc | 37 | 29 of 37 |
| Stanley Miller Construction Company | 20 | 17 of 20 |
| Karvo Companies Inc | 18 | 13 of 18 |
| S E T Inc | 15 | 8 of 15 |
| Marucci & Gaffney Excavating Co | 14 | 11 of 14 |
| Rudzik Excavating Inc | 13 | 8 of 13 |
| Ohio-West Virginia Excavating Co | 13 | 11 of 13 |
| Tri-Mor Corp | 12 | 7 of 12 |
| Digioia-Suburban Excavating LLC | 12 | 12 of 12 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 APR 2024 | 240257 | MED | MED-SR 57/SR 94-09.78/18.84 (CULVERT REPLACEMENT) | 7 of 7 | $1,100,007 | +98% |
| 11 JAN 2024 | 240018 | MAH | MAH-SR 11-13.30 Noise Wall (NOISE WALLS) | 3 of 5 | $2,074,426 | +5.0% |
| 09 NOV 2023 | 230545 | MAH | MAH-IR 76-03.03 Noise Wall (NOISE WALLS) | 7 of 7 | $1,611,737 | +40% |
| 25 MAY 2023 | 230344 | MED | MED-SR 301-05.48 (CULVERT REPLACEMENT) | 4 of 4 | $457,777 | +44% |
| 12 JAN 2023 | 230009 | CUY | CUY-IR 480-18.26 Slope (SLIDE REPAIR) | 4 of 5 | $407,000 | +50% |
| 15 DEC 2022 | 220654 | COL | COL-SR 14-01.42 (CULVERT REPLACEMENT) | 6 of 6 | $647,000 | +39% |
| 26 MAY 2022 | 220340 | District 4 | D04-Culverts FY2022 (PART 1 AND PART 2) (CULVERT REPLACEMENT) | 5 of 6 | $2,174,070 | +41% |
| 17 MAR 2022 | 220185 | STA | STA-TR 211-01.97 (Fulton Dr) (BIKEWAYS) | 2 of 4 | $2,103,000 | +2.0% |
| 10 MAR 2022 | 220147 | MED | MED-SR 57-01.36 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 4 of 4 | $3,911,789 | +8.0% |
| 17 FEB 2022 | 220126 | MED | MED-IR 271 BH FY2022 (BRIDGE REPAIR) | 4 of 4 | $245,549 | +81% |
| 27 JAN 2022 | 220042 | CUY | CUY-Ashton Lane Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $748,383 | +9.0% |
| 27 JAN 2022 | 220060 | STA | STA-SR 43-09.08 Drainage (CULVERT REPLACEMENT) | 5 of 7 | $424,220 | +26% |
| 16 DEC 2021 | 210590 | STA | STA-US 62-24.14 (MAJOR RECONSTRUCTION) | 8 of 9 | $16,176,218 | +18% |
| 16 DEC 2021 | 210666 | STA | STA-SR 172-10.86 (MINOR RECONSTRUCTION) | 5 of 6 | $2,384,087 | +17% |
| 30 SEP 2021 | 210511 | HOL | HOL-SR 520-11.80/12.91 (SLIDE REPAIR) | 12 of 14 | $1,595,000 | +29% |
| 16 SEP 2021 | 210496 | STA | STA-SR 687-03.03 (INTERSECTION) | 4 of 7 | $1,289,546 | +12% |
| 12 AUG 2021 | 210472 | MED | MED-SR 57-17.65 (CULVERT REPLACEMENT) | 2 of 11 | $1,239,237 | -7.0% |
| 29 JUL 2021 | 210443 | POR | POR-SR 82-05.84 (INTERSECTION) | 6 of 6 | $2,440,000 | +25% |
| 27 MAY 2021 | 210346 | MED | MED-SR 94-07.66 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 7 | $769,700 | +12% |
| 13 MAY 2021 | 210296 | CUY | CUY-SR 175-07.97 (SPOT PATCHING / PAVEMENT REPAIR) | 5 of 6 | $769,000 | +32% |
| 29 APR 2021 | 210240 | MED | MED-SR 3-09.04 (INTERSECTION) | 8 of 8 | $1,499,027 | +38% |
| 29 APR 2021 | 214012 | STA | STA-/POR Culverts FY2021 (CULVERT REPLACEMENT) | 2 of 4 | $707,601 | +11% |
| 15 APR 2021 | 210244 | STA | STA-SR 241-09.71 (MINOR RECONSTRUCTION) | 7 of 7 | $9,020,425 | +25% |
| 01 APR 2021 | 210212 | STA | STA-IR 77-01.27 (SLIDE REPAIR) | 7 of 8 | $608,286 | +57% |
| 01 APR 2021 | 210213 | SUM | SUM-IR 77-31.97 (MISCELLANEOUS) | 7 of 7 | $849,131 | +169% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.