ODOT letting results, May 26, 2022

34 contracts let by Ohio DOT on May 26, 2022, $57,045,481 in low bids, a median of 3 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 14 times; median low bid +2.0% against the estimate.

Owner
Ohio DOT
Contracts
34
Low bids, total
$57,045,481
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
223000GUE-SR 209-08.56 (BRIDGE REPLACEMENT (1 BRIDGE))GUE3Ruhlin Company$13,410,265$13,433,5730.0%+2.0%ODOT
220325D05-Statewide Lighting Optimization SE OhioDistrict 59Complete General Construction Company$5,101,133$6,004,201+18%ODOT
220354WAS-SR 60-01.84 (TWO LANE RESURFACING)WAS1Shelly & Sands Inc$3,080,033-3.0%ODOT
220353WAR-SR 48/SR 122-00.30/05.15 (TWO LANE RESURFACING)WAR2John R Jurgensen Company$3,044,475$3,938,903+29%+15%ODOT
220343FRA-US 33-22.93 (FOUR LANE RESURFACING)FRA2Shelly & Sands Inc$2,951,147$3,372,116+14%+1.0%ODOT
220356CHP-SR 55-00.23 (TWO LANE RESURFACING)CHP2Barrett Paving Materials Inc$2,927,800$3,155,424+8.0%-6.0%ODOT
220349MIA-Great Miami River Trail Brdg (BRIDGE REPLACEMENT (1 BRIDGE))MIA4Eagle Bridge Co$2,124,178$2,284,178+8.0%-1.0%ODOT
220357D01-BM FY22 (BRIDGE REPAIR)District 12Miller Bros Const Inc$1,947,709$1,970,599+1.0%+32%ODOT
220334CAR-SR 43-23.12 (BRIDGE REPAIR)CAR5Ruhlin Company$1,810,310$2,002,331+11%+4.0%ODOT
220333BEL-SR 7-09.77 (MISCELLANEOUS)BEL1Ohio-West Virginia Excavating Co$1,788,000+55%ODOT
220337CLE-US 50/SR 131-02.21/08.51 (TWO LANE RESURFACING)CLE2John R Jurgensen Company$1,555,649$2,108,246+36%+16%ODOT
220340D04-Culverts FY2022 (PART 1 AND PART 2) (CULVERT REPLACEMENT)District 45 of 6Marucci & Gaffney Excavating Co$1,547,222$1,779,356+15%-28%ODOT
220335CAR-SR 542-05.61 (BRIDGE REPLACEMENT (1 BRIDGE))CAR6Bog Construction Inc$1,485,250$1,644,458+11%+12%ODOT
220363MRG-Jesse Owens SP FY22 (MISCELLANEOUS)MRG2NLS Paving, Inc$1,372,088$1,486,309+8.0%+40%ODOT
220341D08-TSG-FY2022 (SIGNALIZATION)District 83Complete General Construction Company$1,244,381$1,256,150+1.0%-16%ODOT
220347JEF-SR 7-30.05 (MISCELLANEOUS)JEF1Shelly & Sands Inc$1,119,240+29%ODOT
220346HIG-SR 138-00.00 (TWO LANE RESURFACING)HIG3Shelly Company$1,101,505$1,140,349+4.0%-12%ODOT
220339CUY-US 6/US 20-21.10 Safety (SPOT SAFETY)CUY4Miller Cable Company$938,150$967,700+3.0%+6.0%ODOT
220362MEG-SR 143-09.20 (SLIDE REPAIR)MEG4Alan Stone Co Inc$879,882$924,092+5.0%-21%ODOT
220331D07-US 33-16.69 (MISCELLANEOUS)District 72Eagle Bridge Co$845,493$867,088+3.0%+20%ODOT
220345HAS-US 250-03.91 (BRIDGE REPLACEMENT (1 BRIDGE))HAS3Bog Construction Inc$827,490$1,196,315+45%-15%ODOT
220332BEL-SR 148-11.35 (BRIDGE REPAIR)BEL3Shelly & Sands Inc$806,289$828,907+3.0%+8.0%ODOT
220348MEG-US 33-09.40 (LIGHTING)MEG5Complete General Construction Company$674,732$687,457+2.0%+10%ODOT
220365ROS-Scioto Trail SF (CULVERT REPLACEMENT)ROS6D G M Inc$665,462$709,782+7.0%-8.0%ODOT
220344GAL-SR 554-10.17/12.63 (CULVERT REPLACEMENT)GAL5R C Construction Company and Son Inc$658,292$672,230+2.0%+10%ODOT
220364RIC-US 42-06.51/06.74 (CULVERT REPLACEMENT)RIC1Rietschlin Construction Inc$649,125-9.0%ODOT
220355BRO-US 62-10.75 (SLIDE REPAIR)BRO5Alan Stone Co Inc$527,452$537,757+2.0%-8.0%ODOT
220336CLA-SR 41-27.57 (TWO LANE RESURFACING)CLA2Barrett Paving Materials Inc$474,995$503,458+6.0%+11%ODOT
220360FRA-Crackseal FY22 (CRACK SEALING)FRA2Scodeller Construction Inc$372,267$1,186,001+219%-25%ODOT
220358D07-RPM FY22 (RAISED PAVEMENT MARKERS)District 72W L Markers Inc$285,206$303,426+6.0%+16%ODOT
220359D12-TSG FY2022 (SIGNALIZATION)District 123Greenwich Electric Inc$246,066$266,066+8.0%-21%ODOT
220351RIC-SR 314-04.91 TSG (SIGNALIZATION)RIC5Greenwich Electric Inc$235,725$237,637+1.0%+4.0%ODOT
220361HAM-SR 264-16.36R (BRIDGE REPAIR)HAM2Ruhlin Company$214,042$246,700+15%+2.0%ODOT
220338CUY-IR 480-21.38 Slope (SLIDE REPAIR)CUY3Ruhlin Company$134,430$141,100+5.0%-13%ODOT
ODOT contracts let on May 26, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy