ODOT letting results, May 26, 2022
34 contracts let by Ohio DOT on May 26, 2022, $57,045,481 in low bids, a median of 3 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 14 times; median low bid +2.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 34
- Low bids, total
- $57,045,481
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 223000 | GUE-SR 209-08.56 (BRIDGE REPLACEMENT (1 BRIDGE)) | GUE | 3 | Ruhlin Company | $13,410,265 | $13,433,573 | 0.0% | +2.0% | ODOT |
| 220325 | D05-Statewide Lighting Optimization SE Ohio | District 5 | 9 | Complete General Construction Company | $5,101,133 | $6,004,201 | +18% | ODOT | |
| 220354 | WAS-SR 60-01.84 (TWO LANE RESURFACING) | WAS | 1 | Shelly & Sands Inc | $3,080,033 | -3.0% | ODOT | ||
| 220353 | WAR-SR 48/SR 122-00.30/05.15 (TWO LANE RESURFACING) | WAR | 2 | John R Jurgensen Company | $3,044,475 | $3,938,903 | +29% | +15% | ODOT |
| 220343 | FRA-US 33-22.93 (FOUR LANE RESURFACING) | FRA | 2 | Shelly & Sands Inc | $2,951,147 | $3,372,116 | +14% | +1.0% | ODOT |
| 220356 | CHP-SR 55-00.23 (TWO LANE RESURFACING) | CHP | 2 | Barrett Paving Materials Inc | $2,927,800 | $3,155,424 | +8.0% | -6.0% | ODOT |
| 220349 | MIA-Great Miami River Trail Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | MIA | 4 | Eagle Bridge Co | $2,124,178 | $2,284,178 | +8.0% | -1.0% | ODOT |
| 220357 | D01-BM FY22 (BRIDGE REPAIR) | District 1 | 2 | Miller Bros Const Inc | $1,947,709 | $1,970,599 | +1.0% | +32% | ODOT |
| 220334 | CAR-SR 43-23.12 (BRIDGE REPAIR) | CAR | 5 | Ruhlin Company | $1,810,310 | $2,002,331 | +11% | +4.0% | ODOT |
| 220333 | BEL-SR 7-09.77 (MISCELLANEOUS) | BEL | 1 | Ohio-West Virginia Excavating Co | $1,788,000 | +55% | ODOT | ||
| 220337 | CLE-US 50/SR 131-02.21/08.51 (TWO LANE RESURFACING) | CLE | 2 | John R Jurgensen Company | $1,555,649 | $2,108,246 | +36% | +16% | ODOT |
| 220340 | D04-Culverts FY2022 (PART 1 AND PART 2) (CULVERT REPLACEMENT) | District 4 | 5 of 6 | Marucci & Gaffney Excavating Co | $1,547,222 | $1,779,356 | +15% | -28% | ODOT |
| 220335 | CAR-SR 542-05.61 (BRIDGE REPLACEMENT (1 BRIDGE)) | CAR | 6 | Bog Construction Inc | $1,485,250 | $1,644,458 | +11% | +12% | ODOT |
| 220363 | MRG-Jesse Owens SP FY22 (MISCELLANEOUS) | MRG | 2 | NLS Paving, Inc | $1,372,088 | $1,486,309 | +8.0% | +40% | ODOT |
| 220341 | D08-TSG-FY2022 (SIGNALIZATION) | District 8 | 3 | Complete General Construction Company | $1,244,381 | $1,256,150 | +1.0% | -16% | ODOT |
| 220347 | JEF-SR 7-30.05 (MISCELLANEOUS) | JEF | 1 | Shelly & Sands Inc | $1,119,240 | +29% | ODOT | ||
| 220346 | HIG-SR 138-00.00 (TWO LANE RESURFACING) | HIG | 3 | Shelly Company | $1,101,505 | $1,140,349 | +4.0% | -12% | ODOT |
| 220339 | CUY-US 6/US 20-21.10 Safety (SPOT SAFETY) | CUY | 4 | Miller Cable Company | $938,150 | $967,700 | +3.0% | +6.0% | ODOT |
| 220362 | MEG-SR 143-09.20 (SLIDE REPAIR) | MEG | 4 | Alan Stone Co Inc | $879,882 | $924,092 | +5.0% | -21% | ODOT |
| 220331 | D07-US 33-16.69 (MISCELLANEOUS) | District 7 | 2 | Eagle Bridge Co | $845,493 | $867,088 | +3.0% | +20% | ODOT |
| 220345 | HAS-US 250-03.91 (BRIDGE REPLACEMENT (1 BRIDGE)) | HAS | 3 | Bog Construction Inc | $827,490 | $1,196,315 | +45% | -15% | ODOT |
| 220332 | BEL-SR 148-11.35 (BRIDGE REPAIR) | BEL | 3 | Shelly & Sands Inc | $806,289 | $828,907 | +3.0% | +8.0% | ODOT |
| 220348 | MEG-US 33-09.40 (LIGHTING) | MEG | 5 | Complete General Construction Company | $674,732 | $687,457 | +2.0% | +10% | ODOT |
| 220365 | ROS-Scioto Trail SF (CULVERT REPLACEMENT) | ROS | 6 | D G M Inc | $665,462 | $709,782 | +7.0% | -8.0% | ODOT |
| 220344 | GAL-SR 554-10.17/12.63 (CULVERT REPLACEMENT) | GAL | 5 | R C Construction Company and Son Inc | $658,292 | $672,230 | +2.0% | +10% | ODOT |
| 220364 | RIC-US 42-06.51/06.74 (CULVERT REPLACEMENT) | RIC | 1 | Rietschlin Construction Inc | $649,125 | -9.0% | ODOT | ||
| 220355 | BRO-US 62-10.75 (SLIDE REPAIR) | BRO | 5 | Alan Stone Co Inc | $527,452 | $537,757 | +2.0% | -8.0% | ODOT |
| 220336 | CLA-SR 41-27.57 (TWO LANE RESURFACING) | CLA | 2 | Barrett Paving Materials Inc | $474,995 | $503,458 | +6.0% | +11% | ODOT |
| 220360 | FRA-Crackseal FY22 (CRACK SEALING) | FRA | 2 | Scodeller Construction Inc | $372,267 | $1,186,001 | +219% | -25% | ODOT |
| 220358 | D07-RPM FY22 (RAISED PAVEMENT MARKERS) | District 7 | 2 | W L Markers Inc | $285,206 | $303,426 | +6.0% | +16% | ODOT |
| 220359 | D12-TSG FY2022 (SIGNALIZATION) | District 12 | 3 | Greenwich Electric Inc | $246,066 | $266,066 | +8.0% | -21% | ODOT |
| 220351 | RIC-SR 314-04.91 TSG (SIGNALIZATION) | RIC | 5 | Greenwich Electric Inc | $235,725 | $237,637 | +1.0% | +4.0% | ODOT |
| 220361 | HAM-SR 264-16.36R (BRIDGE REPAIR) | HAM | 2 | Ruhlin Company | $214,042 | $246,700 | +15% | +2.0% | ODOT |
| 220338 | CUY-IR 480-21.38 Slope (SLIDE REPAIR) | CUY | 3 | Ruhlin Company | $134,430 | $141,100 | +5.0% | -13% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.