Complete General Construction Company: ODOT bid record

Complete General Construction Company submitted 662 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 113 of them (17%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$362,644,990
Latest bid
12 NOV 2026
Data through
12 NOV 2026
662Bids
113Low bids
17Win rate, percent
+15%Median gap to the low bid when not low, 546 bids

By year

YearBidsLow bidsWin rate
20201112119%
20211322317%
2022992121%
2023881315%
2024721014%
2025891416%
2026711115%
Complete General Construction Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
FRA461430%
HAM36719%
MOT35720%
LIC34515%
ROS24625%
DEL19316%
District 817741%
PIK1716%
BUT16213%
SCI1616%
District 615213%
NOB1417%
Complete General Construction Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH613613 (100%)$1.00$1.00
Water659E35000MGAL531430 (81%)$1.00$1.00
Lime659E31000ACRE469245 (52%)$100.00$150.00
Guardrail removed202E38000FT344204 (59%)$2.00$2.50
Removal of ground mounted post support and disposal630E86002EACH296203 (69%)$20.00$23.50
Removal of ground mounted sign and disposal630E84900EACH261202 (77%)$15.00$20.00
Commercial fertilizer659E20000TON527189 (36%)$800.00$850.00
Sign, flat sheet630E80100SF347188 (54%)$22.25$24.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY387180 (47%)$26.50$34.00
Guardrail, type MGS606E15050FT302153 (51%)$22.00$22.73
Repair seeding and mulching659E14000SY369135 (37%)$1.50$1.25
Seeding and mulching659E10000SY424133 (31%)$2.77$2.60
Complete General Construction Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Shelly & Sands Inc291207 of 291
Sunesis Construction Co16980 of 169
Eagle Bridge Co13692 of 136
Double Z Construction Company10766 of 107
Alan Stone Co Inc9764 of 97
Axis Civil Construction LLC9371 of 93
George J Igel & Co Inc9153 of 91
D G M Inc8464 of 84
Perram Electric Inc7841 of 78
Miller Cable Company6529 of 65
Complete General Construction Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260497District 1D01-OL FY27 (BRIDGE REPAIR)4 of 4$1,456,712+17%
12 NOV 2026260502HAMHAM-IR 275-05.25 (SLIDE REPAIR)3 of 4$1,105,350+8.0%
12 NOV 2026260509SCISCI-US 52-13.33 (CULVERT REPLACEMENT)5 of 5$908,244+26%
12 NOV 2026260516District 7D07-Lighting RPL FY 2027 (LIGHTING)2 of 4$2,218,654+6.0%
12 NOV 2026260521GUEGUE-IR 70 EB Rest Area TP (PARKING AREAS)4 of 8$7,713,006+5.0%
12 NOV 2026260524WARWAR-IR 71 Rest Areas TP (PARKING AREAS)6 of 7$15,503,237+14%
29 OCT 2026260454ADAADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES))5 of 5$6,334,424+30%
29 OCT 2026260461HAMHAM-IR 275-11.40 (SLIDE REPAIR)5 of 5$3,621,883+31%
29 OCT 2026260469MOTMOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))5 of 6$2,049,360+57%
29 OCT 2026260471MOTMOT-SR 835-02.57 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 5$6,353,979+14%
01 OCT 2026260405DELDEL-US 36-00.00 (MAJOR RECONSTRUCTION)2 of 3$18,904,071+7.0%
01 OCT 2026260418ADAADA-SR 41-31.36 (SLIDE REPAIR)5 of 5$833,484+49%
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)6 of 7$859,016+33%
01 OCT 2026260445District 6D06-ELEC-FY2027 (LIGHTING)3 of 4$719,105+31%
01 OCT 2026260450SHESHE-SR 119-03.60 (BRIDGE REPAIR)4 of 4$625,400+21%
01 OCT 2026268018DELDEL-US 42-12.63 (CULVERT REPLACEMENT)3 of 4$454,806+11%
01 OCT 2026268019NOBNOB-SR 821-02.98 (SLIDE REPAIR)4 of 4$2,090,840+15%
17 SEP 2026260404District 8D08-LED LG FY2027 (LIGHTING)1 of 5$2,298,595Low, 22% under the second
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)7 of 7$1,279,142+89%
27 AUG 2026260379BUTBUT-SR 129-09.09/09.20 (BRIDGE REPAIR)3 of 5$756,479+19%
27 AUG 2026260390SCISCI-SR 348-17.51 (BRIDGE REPAIR)3 of 3$1,611,798+89%
13 AUG 2026260364KNOKNO-SR 13-10.33 (MINOR RECONSTRUCTION)1 of 4$6,766,844Low, 1.0% under the second
13 AUG 2026260367PIKPIK-SR 32-06.60 (BRIDGE REPAIR)6 of 6$1,198,723+132%
13 AUG 2026260368PIKPIK-SR 32-18.40 (INTERSECTION)6 of 9$3,316,308+17%
30 JUL 2026260342ALLALL-SR 65-13.25 (BRIDGE REPAIR)4 of 4$2,155,803+7.0%
Complete General Construction Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way