ODOT contract 260379 bid tabulation
BUT-SR 129-09.09/09.20 (BRIDGE REPAIR). Let by Ohio DOT on August 27, 2026, BUT. 5 bids received; low bid $635,734 by BCC Ohio Inc, -6.5% against the engineer's estimate of $680,000.
- Owner
- Ohio DOT
- Letting
- 27 AUG 2026
- Pay items
- 83
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $635,734 | Low | -7.0% |
| 2 | Eagle Bridge Co | $717,735 | +13% | +6.0% |
| 3 | Complete General Construction Company | $756,479 | +19% | +11% |
| 4 | KT Holden Construction LLC | $798,401 | +26% | +17% |
| 5 | Prus Construction Company | $946,030 | +49% | +39% |
Engineer's estimate: $680,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Eagle Bridge Co | 3. Complete General Construction Company | 4. KT Holden Construction LLC | 5. Prus Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,290.00 | $3,500.00 | $4,000.00 | $22,090 | $14,500 |
| 2 | Pipe removed, 24" and under (202E35100) | FT | 5 | $12.90 | $50.00 | $80.00 | $70.00 | $76.00 |
| 3 | Guardrail removed (202E38000) | FT | 471 | $2.52 | $5.00 | $10.00 | $2.80 | $11.00 |
| 4 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 5 | $357.00 | $400.00 | $440.00 | $500.00 | $275.00 |
| 5 | Bridge terminal assembly removed (202E47000) | EACH | 8 | $105.00 | $250.00 | $319.00 | $150.00 | $137.50 |
| 6 | Guardrail, type MGS (606E15050) | FT | 75 | $30.24 | $40.00 | $40.00 | $27.00 | $44.00 |
| 7 | Rounded end section (606E20050) | EACH | 3 | $115.50 | $100.00 | $100.00 | $80.00 | $110.00 |
| 8 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 5 | $2,919.00 | $2,825.00 | $2,825.00 | $2,600.00 | $3,107.50 |
| 9 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,391.25 | $1,530.00 | $1,530.00 | $1,300.00 | $1,685.00 |
| 10 | MGS bridge terminal assembly, type 1, as per plan (606E35003) | EACH | 6 | $3,003.00 | $2,750.00 | $2,750.00 | $2,500.00 | $3,025.00 |
| 11 | MGS bridge terminal assembly, type 1, as per plan (606E35003) | EACH | 2 | $3,612.00 | $3,800.00 | $3,800.00 | $2,500.00 | $4,180.00 |
| 12 | Rock channel protection, type C with filter (601E32200) | CY | 27 | $216.48 | $160.00 | $150.00 | $280.00 | $320.00 |
| 13 | Soil analysis test (659E00100) | EACH | 2 | $52.50 | $150.00 | $225.00 | $50.00 | $440.00 |
| 14 | Topsoil (659E00300) | CY | 90 | $60.90 | $15.00 | $38.00 | $90.00 | $100.00 |
| 15 | Seeding and mulching (659E10000) | SY | 806 | $3.36 | $6.00 | $6.50 | $3.20 | $8.25 |
| 16 | Repair seeding and mulching (659E14000) | SY | 40 | $3.36 | $2.50 | $5.00 | $3.20 | $1.10 |
| 17 | Inter-seeding (659E15000) | SY | 40 | $0.42 | $0.25 | $0.25 | $0.40 | $0.01 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.11 | $735.00 | $1,500.00 | $850.00 | $700.00 | $1,650.00 |
| 19 | Lime (659E31000) | ACRE | 0.17 | $0.18 | $1.00 | $50.00 | $0.18 | $220.00 |
| 20 | Water (659E35000) | MGAL | 5 | $0.11 | $10.00 | $10.00 | $0.10 | $1.10 |
| 21 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Raised pavement marker removed (621E54000) | EACH | 10 | $20.64 | $20.00 | $25.00 | $25.00 | $57.00 |
| 23 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 16 | $12.67 | $15.00 | $15.00 | $12.50 | $16.50 |
| 24 | Ground mounted support, no. 3 post (630E03100) | FT | 87 | $28.07 | $15.50 | $18.50 | $20.00 | $20.35 |
| 25 | Sign, flat sheet (630E80100) | SF | 43 | $29.64 | $16.00 | $24.00 | $25.00 | $26.50 |
| 26 | Removal of ground mounted sign and disposal (630E84900) | EACH | 13 | $17.87 | $20.00 | $15.00 | $25.00 | $16.50 |
| 27 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $23.84 | $25.00 | $50.00 | $25.00 | $55.00 |
| 28 | Edge line, 6" (646E10010) | MI | 0.06 | $44,714 | $42,585 | $42,585 | $42,585 | $46,850 |
| 29 | Center line (646E10200) | MI | 0.03 | $35,333 | $33,650 | $33,650 | $33,650 | $37,015 |
| 30 | Traffic compacted surface, type A or B (410E12000) | CY | 10 | $157.50 | $75.00 | $90.00 | $110.00 | $111.00 |
| 31 | Detour signing (614E12420) | LS | 1 | $8,471.14 | $15,000 | $8,068.00 | $8,100.00 | $8,875.00 |
| 32 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $1,380.00 | $500.00 | $310.00 | $410.00 | $525.00 |
| 33 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.03 | $26,150 | $24,905 | $24,905 | $24,905 | $27,400 |
| 34 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.06 | $16,984 | $16,175 | $16,175 | $16,175 | $17,795 |
| 35 | Special - asbestos abatement: work involving asbes (690E71000) | LS | 1 | $1,041.00 | $1,000.00 | $500.00 | $750.00 | $1,350.00 |
| 36 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $6,386.40 | $25,000 | $55,000 | $58,510 | $20,600 |
| 37 | Embankment (203E20000) | CY | 34 | $121.80 | $350.00 | $50.00 | $490.00 | $125.00 |
| 38 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $17,001 | $2,501.00 | $400.00 | $6,100.00 | $35,250 |
| 39 | Galvanized steel reinforcement (509E26000) | LB | 1,056 | $3.86 | $3.50 | $5.00 | $6.25 | $3.95 |
| 40 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 120 | $29.88 | $50.00 | $17.00 | $25.00 | $23.00 |
| 41 | Class QC SCC concrete, abutment (511E45720) | CY | 5 | $4,935.00 | $7,000.00 | $4,000.00 | $6,600.00 | $2,625.00 |
| 42 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 62 | $47.04 | $35.00 | $35.00 | $75.00 | $38.50 |
| 43 | Concrete repair by epoxy injection (512E10600) | FT | 90 | $70.45 | $75.00 | $110.00 | $110.00 | $71.50 |
| 44 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 54 | $21.08 | $30.00 | $30.00 | $36.50 | $33.00 |
| 45 | 1/2" preformed expansion joint filler (516E13200) | SF | 95 | $8.93 | $12.00 | $16.00 | $10.00 | $6.50 |
| 46 | Special - steel drip strip (518E22300) | FT | 166.04 | $20.10 | $17.00 | $21.00 | $27.00 | $18.00 |
| 47 | Patching concrete structure, as per plan (519E11101) | SF | 103 | $64.50 | $130.00 | $110.00 | $200.00 | $210.00 |
| 48 | Concrete slope protection (601E21000) | SY | 122 | $447.03 | $300.00 | $420.00 | $180.00 | $300.00 |
| 49 | Galvanic anode protection, as per plan (844E20001) | EACH | 84 | $71.03 | $65.00 | $90.00 | $70.00 | $56.00 |
| 50 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 393 | $101.77 | $135.00 | $110.00 | $178.00 | $205.00 |
| 51 | Surface preparation using hydrodemolition (848E20000) | SY | 393 | $108.52 | $160.00 | $165.00 | $117.00 | $135.00 |
| 52 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 23 | $848.25 | $325.00 | $400.00 | $500.00 | $575.00 |
| 53 | Hand chipping (848E50000) | SY | 40 | $260.10 | $100.00 | $85.00 | $155.00 | $235.00 |
| 54 | Test slab (848E50100) | LS | 1 | $4,315.50 | $500.00 | $1,200.00 | $2,500.00 | $2,430.00 |
| 55 | Existing concrete overlay removed(1 1/4" thick) (848E50320) | SY | 365 | $13.42 | $25.00 | $18.00 | $14.00 | $29.00 |
| 56 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 146 | $60.15 | $10.00 | $45.00 | $100.00 | $225.00 |
| 57 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $6,386.40 | $25,000 | $20,000 | $16,255 | $4,650.00 |
| 58 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,205.00 | $2,501.00 | $400.00 | $200.00 | $17,500 |
| 59 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $2,580.00 | $2,000.00 | $3,400.00 | $7,100.00 | $4,200.00 |
| 60 | Galvanized steel reinforcement (509E26000) | LB | 1,204 | $3.86 | $3.50 | $5.00 | $6.25 | $3.90 |
| 61 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 140 | $29.88 | $50.00 | $17.00 | $25.00 | $20.00 |
| 62 | Class QC SCC concrete, abutment (511E45720) | CY | 5 | $4,935.00 | $7,000.00 | $4,000.00 | $6,620.00 | $2,600.00 |
| 63 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 73 | $47.04 | $35.00 | $35.00 | $65.00 | $38.50 |
| 64 | Concrete repair by epoxy injection (512E10600) | FT | 74 | $79.75 | $80.00 | $110.00 | $110.00 | $71.50 |
| 65 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 49 | $21.08 | $30.00 | $35.00 | $36.50 | $33.00 |
| 66 | 1/2" preformed expansion joint filler (516E13200) | SF | 50 | $8.93 | $12.00 | $14.00 | $15.00 | $10.65 |
| 67 | Special - steel drip strip (518E22300) | FT | 182.40 | $20.10 | $17.00 | $21.00 | $27.00 | $22.00 |
| 68 | Patching concrete structure, as per plan (519E11101) | SF | 94 | $71.10 | $130.00 | $110.00 | $220.00 | $235.00 |
| 69 | Galvanic anode protection, as per plan (844E20001) | EACH | 92 | $71.03 | $65.00 | $90.00 | $70.00 | $52.00 |
| 70 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 359 | $108.22 | $135.00 | $165.00 | $174.00 | $288.00 |
| 71 | Surface preparation using hydrodemolition (848E20000) | SY | 359 | $111.39 | $160.00 | $245.00 | $119.00 | $155.00 |
| 72 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 20 | $848.25 | $325.00 | $400.00 | $500.00 | $595.00 |
| 73 | Hand chipping (848E50000) | SY | 36 | $260.10 | $100.00 | $85.00 | $155.00 | $242.00 |
| 74 | Test slab (848E50100) | LS | 1 | $4,315.50 | $500.00 | $1,200.00 | $2,500.00 | $2,430.00 |
| 75 | Existing concrete overlay removed(1 1/4" thick) (848E50320) | SY | 328 | $14.03 | $25.00 | $24.00 | $15.00 | $50.00 |
| 76 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 131 | $60.15 | $10.00 | $50.00 | $100.00 | $235.00 |
| 77 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,737.28 | $12,500 | $6,000.00 | $13,550 | $4,100.00 |
| 78 | Maintaining traffic (614E11000) | LS | 1 | $3,689.40 | $15,000 | $20,000 | $4,625.00 | $82,135 |
| 79 | Field office, type B (619E16010) | MNTH | 3 | $3,905.00 | $3,750.00 | $5,000.00 | $2,800.00 | $4,275.00 |
| 80 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,600.00 | $6,000.00 | $7,000.00 | $10,000 | $6,000.00 |
| 81 | Mobilization (624E10000) | LS | 1 | $29,619 | $40,000 | $35,000 | $39,850 | $20,000 |
| 100 | Preformed elastomeric compression joint seal (516E10000) | FT | 90 | $34.43 | $40.00 | $35.00 | $25.00 | $93.00 |
| 101 | Preformed elastomeric compression joint seal (516E10000) | FT | 102 | $34.25 | $40.00 | $35.00 | $25.00 | $88.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.