Prus Construction Company: ODOT bid record

Prus Construction Company submitted 89 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 16 of them (18%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$48,092,575
Latest bid
12 NOV 2026
Data through
12 NOV 2026
89Bids
16Low bids
18Win rate, percent
+15%Median gap to the low bid when not low, 73 bids

By year

YearBidsLow bidsWin rate
202013215%
202118211%
20225120%
202312217%
20241218%
202512433%
202617424%
Prus Construction Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HAM571018%
CLE10330%
BUT900%
District 87114%
WAR3267%
BRO300%
Prus Construction Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH7878 (100%)$1.00$1.00
Water659E35000MGAL7327 (37%)$1.15$1.00
Subgrade compaction204E10000SY5224 (46%)$2.75$3.00
Special - pressure relief joint, type A asphalt RE451E34000FT2222 (100%)$140.00$205.61
Curb ramp608E52000SF3216 (50%)$20.50$22.00
Commercial fertilizer659E20000TON7214 (19%)$1,004.00$850.00
Excavation203E10000CY5913 (22%)$42.00$27.00
Seeding and mulching659E10000SY5613 (23%)$3.00$2.60
Aggregate base304E20000CY5113 (25%)$108.00$90.00
Special - composite fiber wrap system519E00100SF1413 (93%)$25.50$28.10
Lime659E31000ACRE7012 (17%)$187.50$150.00
Embankment203E20000CY6112 (20%)$39.22$25.00
Prus Construction Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Prus Construction Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260524WARWAR-IR 71 Rest Areas TP (PARKING AREAS)1 of 7$13,595,884Low, 2.0% under the second
29 OCT 2026260461HAMHAM-IR 275-11.40 (SLIDE REPAIR)2 of 5$2,901,596+5.0%
01 OCT 2026260425HAMHAM-IR 71-02.26/02.94/03.44 (BRIDGE REPAIR)4 of 5$6,327,238+12%
27 AUG 2026260379BUTBUT-SR 129-09.09/09.20 (BRIDGE REPAIR)5 of 5$946,030+49%
27 AUG 2026260381CLECLE-SR 125-14.08 (SIDEWALK)4 of 5$1,162,328+20%
16 JUL 2026260329District 8D08-PM Bridge FY27 (BRIDGE REPAIR)4 of 7$2,687,291+38%
25 JUN 2026260305BROBRO-Riverfront East Paving (MINOR RECONSTRUCTION)4 of 5$412,257+9.0%
07 MAY 2026260238HAMHAM-Columbia Connector (BIKEWAYS)3 of 3$2,236,975+11%
07 MAY 2026268008HAMHAM-CR 128/CR 161 Roundabout (INTERSECTION)3 of 4$2,631,205+12%
23 APR 2026260200HAMHAM-Madeira SRTS 2023 (SIDEWALK)1 of 2$393,935Low, 8.0% under the second
26 MAR 2026260121HAMHAM-CR 158/CR 460-02.04/00.54 (INTERSECTION)3 of 4$2,536,744+5.0%
26 MAR 2026260144CLECLE-US 50-02.25 (BRIDGE REPAIR)1 of 5$655,092Low, 1.0% under the second
26 MAR 2026260149HAMHAM-CR 196-01.89 Delhi Ave (INTERSECTION)2 of 4$1,557,456+2.0%
26 MAR 2026260150HAMHAM-IR 71-05.05 (BRIDGE REPAIR)1 of 2$2,276,738Low, 1.0% under the second
12 MAR 2026260122HAMHAM-CR 299-05.78 Loveland Madeira (SIDEWALK)3 of 5$1,871,720+4.0%
19 FEB 2026260077BROBRO-CR 62-00.42 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 4$2,249,492+32%
29 JAN 2026260049CLECLE-SR 132-12.64 (BRIDGE REPAIR)3 of 5$608,287+7.0%
13 NOV 2025250517CLECLE-Culverts FY269 of 10$467,979+59%
25 SEP 2025250434District 8D08-Bridge Maintenance FY2026 (BRIDGE REPAIR)2 of 2$3,892,942+40%
11 SEP 2025250411HAMHAM-CR 270-02.96 Miami Ave (MINOR RECONSTRUCTION)2 of 5$5,644,975+3.0%
22 MAY 2025250278HAMHAM-/WAR-US 22-16.04/00.00 Ped (SPOT SAFETY)2 of 2$992,621+15%
15 MAY 2025250242CLECLE-US 50/SR 28-00.83/00.00 (MISCELLANEOUS)1 of 4$1,324,845Low, 5.0% under the second
15 MAY 2025250251HAMHAM-WW to Glenwood Gardens Trail (BIKEWAYS)5 of 5$8,336,768+23%
08 MAY 2025250249HAMHAM-CR 91-01.05 Poole Rd Sidewalk (SIDEWALK)3 of 3$537,833+9.0%
08 MAY 2025250250HAMHAM-CR 96-05.25 Springdale Road (SIDEWALK)1 of 2$1,051,156Low, 22% under the second
Prus Construction Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy