ODOT contract 250251 bid tabulation
HAM-WW to Glenwood Gardens Trail (BIKEWAYS). Let by Ohio DOT on May 15, 2025, HAM. 5 bids received; low bid $6,761,485 by Rack & Ballauer Excavating Co Inc, -0.8% against the engineer's estimate of $6,816,000.
- Owner
- Ohio DOT
- Letting
- 15 MAY 2025
- Pay items
- 138
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rack & Ballauer Excavating Co Inc | $6,761,485 | Low | -1.0% |
| 2 | Barrett Paving Materials Inc | $7,698,988 | +14% | +13% |
| 3 | John R Jurgensen Company | $7,813,281 | +16% | +15% |
| 4 | Sunesis Construction Co | $7,822,535 | +16% | +15% |
| 5 | Prus Construction Company | $8,336,768 | +23% | +22% |
Engineer's estimate: $6,816,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rack & Ballauer Excavating Co Inc | 2. Barrett Paving Materials Inc | 3. John R Jurgensen Company | 4. Sunesis Construction Co | 5. Prus Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $458,715 | $325,000 | $290,000 | $652,747 | $315,000 |
| 2 | Headwall removed (202E20010) | EACH | 7 | $400.00 | $150.00 | $873.00 | $674.77 | $1,475.00 |
| 3 | Pavement removed (202E23000) | SY | 2,612 | $19.00 | $20.00 | $16.00 | $24.91 | $23.00 |
| 4 | Walk removed (202E30000) | SF | 967 | $1.70 | $3.00 | $6.00 | $5.58 | $3.50 |
| 5 | Curb removed (202E32000) | FT | 85 | $10.00 | $12.00 | $24.00 | $7.48 | $22.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 61 | $21.00 | $15.00 | $17.00 | $34.17 | $81.50 |
| 7 | Guardrail removed (202E38000) | FT | 290 | $6.00 | $10.00 | $12.00 | $12.15 | $11.00 |
| 8 | Fence removed, as per plan (202E75001) | FT | 2,228 | $5.00 | $5.00 | $6.00 | $5.72 | $5.50 |
| 9 | Gate removed, as per plan (202E75251) | EACH | 3 | $200.00 | $300.00 | $360.00 | $237.12 | $330.00 |
| 10 | Removal misc.:at box (202E98100) | EACH | 5 | $125.00 | $75.00 | $290.00 | $51.84 | $300.00 |
| 11 | Removal misc.:boundary marker (202E98100) | EACH | 1 | $125.00 | $100.00 | $58.00 | $67.05 | $200.00 |
| 12 | Removal misc.:pet waste station (202E98100) | EACH | 1 | $125.00 | $100.00 | $580.00 | $67.05 | $200.00 |
| 13 | Removal misc.:reflector post (202E98100) | EACH | 1 | $125.00 | $10.00 | $193.00 | $67.05 | $200.00 |
| 14 | Removal misc.:modular block landscaping wall (202E98200) | FT | 37 | $54.00 | $25.00 | $29.00 | $19.63 | $50.00 |
| 15 | Excavation (203E10000) | CY | 14,170 | $28.00 | $35.00 | $30.50 | $48.65 | $32.00 |
| 16 | Embankment (203E20000) | CY | 8,504 | $22.00 | $20.00 | $18.00 | $15.78 | $32.00 |
| 17 | Subgrade compaction (204E10000) | SY | 174 | $15.50 | $10.00 | $9.00 | $17.71 | $3.50 |
| 18 | Granular material, type C (204E30020) | CY | 34 | $90.00 | $125.00 | $150.00 | $123.91 | $160.00 |
| 19 | Proof rolling (204E45000) | HR | 3 | $200.00 | $1,000.00 | $202.00 | $229.10 | $145.00 |
| 20 | Geotextile fabric (204E50000) | SY | 87 | $2.25 | $6.00 | $7.00 | $2.21 | $9.00 |
| 21 | Cement (206E10500) | TON | 747 | $199.00 | $195.00 | $267.00 | $238.54 | $228.00 |
| 22 | Curing coat (206E11000) | SY | 24,693 | $1.55 | $1.93 | $2.00 | $1.76 | $1.25 |
| 23 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 24,722 | $9.00 | $12.95 | $4.10 | $6.80 | $7.00 |
| 24 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $30,200 | $13,000 | $21,100 | $18,836 | $16,500 |
| 25 | Linear grading, as per plan (209E60501) | MI | 2 | $2,500.00 | $15,000 | $14,000 | $14,361 | $30,000 |
| 26 | Fence, misc.:wood fence (607E98000) | FT | 3,444 | $39.50 | $39.50 | $47.00 | $41.54 | $43.50 |
| 27 | 5" concrete walk (608E12000) | SF | 1,796 | $11.25 | $12.00 | $16.00 | $14.38 | $12.75 |
| 28 | Curb ramp (608E52000) | SF | 392 | $33.00 | $29.00 | $36.00 | $33.90 | $48.50 |
| 29 | Monument assembly, type C (623E38500) | EACH | 10 | $1,600.00 | $2,000.00 | $1,035.00 | $1,353.22 | $1,750.00 |
| 30 | Right-of-way monument, type B (623E40520) | EACH | 5 | $300.00 | $1,500.00 | $1,035.00 | $560.00 | $600.00 |
| 31 | Special - bollard (690E50600) | EACH | 28 | $625.00 | $625.00 | $750.00 | $625.00 | $1,275.00 |
| 32 | Special - service drive gate (690E98000) | EACH | 2 | $7,500.00 | $7,500.00 | $11,450 | $7,500.00 | $8,250.00 |
| 33 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $15,000 | $3,000.00 | $8,300.00 | $4,400.00 | $18,000 |
| 34 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $80,000 | $80,000 | $40,000 | $39,150 | $95,000 |
| 35 | Riprap (601E10000) | SY | 18 | $300.00 | $250.00 | $72.00 | $147.20 | $195.00 |
| 36 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 128 | $85.00 | $175.00 | $60.00 | $128.86 | $90.00 |
| 37 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 81 | $85.00 | $125.00 | $66.00 | $127.95 | $112.00 |
| 38 | Rock channel protection, type C with filter (601E32200) | CY | 5.23 | $200.00 | $400.00 | $201.00 | $372.06 | $445.00 |
| 39 | Paved gutter, type 2 (601E38400) | FT | 250 | $54.00 | $65.00 | $82.00 | $84.26 | $110.00 |
| 40 | Water (616E10000) | MGAL | 90 | $80.00 | $1.00 | $24.00 | $7.65 | $1.15 |
| 41 | Topsoil (659E00300) | CY | 5,246 | $72.00 | $50.00 | $72.00 | $41.89 | $75.00 |
| 42 | Seeding and mulching (659E10000) | SY | 32,284 | $2.00 | $1.40 | $1.50 | $3.74 | $2.25 |
| 43 | Repair seeding and mulching (659E14000) | SY | 1,614 | $1.40 | $2.90 | $1.50 | $1.40 | $1.50 |
| 44 | Commercial fertilizer (659E20000) | TON | 4.36 | $760.00 | $760.00 | $1,100.00 | $760.00 | $850.00 |
| 45 | Lime (659E31000) | ACRE | 6.67 | $30.00 | $30.00 | $107.00 | $30.00 | $33.00 |
| 46 | Water (659E35000) | MGAL | 174.30 | $30.00 | $30.00 | $1.20 | $30.00 | $33.00 |
| 47 | Slope erosion protection (670E00500) | SY | 14,950 | $4.00 | $4.00 | $3.50 | $4.00 | $4.50 |
| 48 | Ditch erosion protection mat, type B (670E00720) | SY | 1,702 | $4.00 | $4.00 | $2.60 | $4.00 | $4.50 |
| 49 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 | $4,135.00 | $6,200.00 | $4,135.00 | $5,000.00 |
| 50 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $30,000 | $21,400 | $40,000 | $25,776 | $30,000 |
| 51 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $25,000 | $21,712 | $18,000 | $21,711 | $25,000 |
| 52 | Erosion control (832E30000) | EACH | 154,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 1,610 | $5.00 | $5.00 | $7.35 | $5.00 | $5.50 |
| 54 | Concrete masonry (602E20000) | CY | 7.82 | $2,000.00 | $1,500.00 | $7,750.00 | $4,332.14 | $3,500.00 |
| 55 | 6" conduit, type B, as per plan (611E00901) | FT | 100 | $25.00 | $38.00 | $18.00 | $60.50 | $36.00 |
| 56 | 15" conduit, type A (611E05700) | FT | 62 | $145.00 | $120.00 | $175.00 | $87.94 | $165.00 |
| 57 | 18" conduit, type D (611E07900) | FT | 35 | $155.00 | $100.00 | $195.00 | $107.78 | $100.00 |
| 58 | 24" conduit, type C (611E10600) | FT | 42 | $160.00 | $135.00 | $197.00 | $154.07 | $180.00 |
| 59 | 30" conduit, type D (611E13900) | FT | 20 | $175.00 | $175.00 | $280.00 | $263.12 | $220.00 |
| 60 | 42" conduit, type D (611E19900) | FT | 8 | $275.00 | $400.00 | $480.00 | $586.47 | $600.00 |
| 61 | 48" conduit, type D (611E21400) | FT | 43.50 | $200.00 | $200.00 | $490.00 | $322.39 | $285.00 |
| 62 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $3,000.00 | $3,200.00 | $3,300.00 | $3,681.72 | $3,875.00 |
| 63 | Manhole adjusted to grade (611E99654) | EACH | 6 | $950.00 | $1,200.00 | $750.00 | $766.32 | $900.00 |
| 64 | Pavement repair, as per plan (253E02001) | CY | 23 | $490.00 | $1,000.00 | $505.00 | $649.05 | $500.00 |
| 65 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,070 | $225.00 | $275.00 | $222.00 | $194.82 | $295.00 |
| 66 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 26 | $375.00 | $380.00 | $450.00 | $455.00 | $435.00 |
| 67 | Aggregate base (304E20000) | CY | 4,168 | $78.00 | $125.00 | $90.00 | $103.61 | $108.00 |
| 68 | Tack coat (407E10000) | GAL | 1,495 | $4.00 | $4.00 | $5.00 | $2.50 | $5.50 |
| 69 | Stabilized crushed aggregate, as per plan (411E10001) | CY | 215 | $78.00 | $125.00 | $90.00 | $79.37 | $130.00 |
| 70 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 1,035 | $275.00 | $400.00 | $254.00 | $230.70 | $280.00 |
| 71 | Combination curb and gutter, type 2 (609E12000) | FT | 141 | $70.00 | $45.00 | $61.00 | $63.29 | $72.00 |
| 72 | Valve box adjusted to grade (638E10800) | EACH | 2 | $550.00 | $700.00 | $800.00 | $134.06 | $850.00 |
| 73 | Special - gas valve box adjusted to grade (611E99700) | EACH | 1 | $550.00 | $700.00 | $800.00 | $134.07 | $850.00 |
| 74 | Delineator, post ground mounted (620E00500) | EACH | 24 | $125.00 | $125.00 | $150.00 | $125.00 | $165.00 |
| 75 | Raised pavement marker removed (621E54000) | EACH | 1 | $15.00 | $30.13 | $160.00 | $2,500.00 | $66.00 |
| 76 | Ground rod (625E32000) | EACH | 2 | $255.00 | $255.00 | $305.00 | $255.00 | $1,500.00 |
| 77 | Ground mounted support, no. 3 post (630E03100) | FT | 615 | $13.00 | $13.00 | $15.50 | $13.00 | $16.50 |
| 78 | Street name sign support, no. 3 post (630E08520) | FT | 16 | $17.00 | $17.00 | $20.00 | $17.00 | $16.50 |
| 79 | Sign post reflector (630E08600) | EACH | 24 | $45.00 | $45.00 | $55.00 | $45.00 | $60.50 |
| 80 | Sign, flat sheet (630E80100) | SF | 267 | $18.50 | $18.50 | $22.00 | $18.50 | $16.50 |
| 81 | Removal of ground mounted sign and disposal (630E84900) | EACH | 7 | $15.00 | $15.00 | $18.00 | $15.00 | $16.50 |
| 82 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $55.00 | $55.00 | $65.00 | $55.00 | $49.50 |
| 83 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $30.00 | $30.00 | $36.00 | $30.00 | $22.00 |
| 84 | Signing, misc.:solar powered rectangular rapid fla (630E97700) | EACH | 2 | $7,660.00 | $7,660.00 | $9,150.00 | $7,660.00 | $8,244.50 |
| 85 | Pedestal foundation (632E64020) | EACH | 2 | $1,390.00 | $1,390.00 | $1,660.00 | $1,390.00 | $2,500.00 |
| 86 | Removal of pavement marking (642E30000) | FT | 239 | $12.00 | $12.00 | $14.50 | $12.00 | $11.50 |
| 87 | Edge line, 4" (644E00100) | MI | 0.04 | $5,730.00 | $5,730.00 | $6,840.00 | $5,730.00 | $16,500 |
| 88 | Edge line, 6" (644E00104) | MI | 0.02 | $5,730.00 | $5,730.00 | $6,850.00 | $5,730.00 | $16,500 |
| 89 | Center line (644E00300) | MI | 0.35 | $8,820.00 | $8,820.00 | $10,550 | $8,820.00 | $16,500 |
| 90 | Stop line (644E00500) | FT | 85 | $11.00 | $11.00 | $13.00 | $11.00 | $16.50 |
| 91 | Crosswalk line, 24" (644E00630) | FT | 296 | $8.80 | $8.80 | $10.50 | $8.80 | $16.50 |
| 92 | Transverse/diagonal line (644E00700) | FT | 47 | $11.00 | $11.00 | $13.00 | $11.00 | $11.00 |
| 93 | Parking lot stall marking (644E01200) | FT | 27 | $4.40 | $4.40 | $5.25 | $4.40 | $11.00 |
| 94 | Word on pavement, 96" (644E01410) | EACH | 4 | $550.00 | $550.00 | $655.00 | $550.00 | $561.00 |
| 95 | Handicap symbol marking (644E01600) | EACH | 1 | $130.00 | $130.00 | $155.00 | $130.00 | $385.00 |
| 96 | Deciduous tree, 2" caliper, as per planflowering / (661E40081) | EACH | 479 | $640.00 | $640.00 | $950.00 | $640.00 | $704.00 |
| 97 | Deciduous tree, 3" caliper, as per planshade trees (661E40121) | EACH | 370 | $720.00 | $720.00 | $1,100.00 | $720.00 | $792.00 |
| 98 | Evergreen tree, 8' height, as per planoniferous TR (661E50161) | EACH | 74 | $520.00 | $520.00 | $1,000.00 | $520.00 | $572.00 |
| 99 | Planting, misc.:landscaping items (661E99940) | LS | 1 | $6,500.00 | $10,000 | $6,000.00 | $50,000 | $25,000 |
| 100 | Unclassified excavation (503E21100) | CY | 5,283 | $45.00 | $50.00 | $71.00 | $55.92 | $38.00 |
| 101 | Class QC1 concrete, footing (511E46510) | CY | 12 | $2,200.00 | $850.00 | $1,200.00 | $1,492.04 | $1,600.00 |
| 102 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 378 | $26.00 | $45.00 | $36.00 | $30.00 | $68.50 |
| 103 | Block masonry, as per plan (602E15001) | CY | 25 | $2,000.00 | $1,000.00 | $1,905.00 | $2,285.72 | $825.00 |
| 104 | Masonry, misc.: cast stone facing (602E97000) | SF | 402 | $109.00 | $60.00 | $94.00 | $68.64 | $60.00 |
| 105 | Masonry, misc.: cast stone cap (602E98100) | FT | 101 | $135.00 | $70.00 | $217.00 | $101.51 | $154.00 |
| 106 | Gabions, as per plan (838E20701) | CY | 1,391 | $280.00 | $415.00 | $575.00 | $597.02 | $317.00 |
| 107 | Prefabricated modular retaining wall, as per plan (870E10001) | SF | 2,151 | $75.00 | $80.00 | $93.00 | $132.65 | $125.00 |
| 108 | 6" drainage pipe, perforated (870E12000) | FT | 1,119 | $16.00 | $10.00 | $5.00 | $4.54 | $20.00 |
| 109 | 6" drainage pipe, non-perforated (870E12100) | FT | 220 | $17.00 | $10.00 | $18.00 | $31.96 | $50.00 |
| 110 | On-site assistance (870E14000) | DAY | 10 | $100.00 | $800.00 | $600.00 | $857.97 | $2,450.00 |
| 111 | Unclassified excavation, as per plan (503E21101) | CY | 49 | $250.00 | $250.00 | $300.00 | $146.75 | $120.00 |
| 112 | Pile driving equipment mobilization (505E11100) | LS | 1 | $30,000 | $30,000 | $36,000 | $10,890 | $25,000 |
| 113 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 750 | $8.00 | $8.00 | $9.60 | $37.40 | $120.00 |
| 114 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 850 | $65.00 | $65.00 | $78.00 | $45.24 | $50.00 |
| 115 | Epoxy coated steel reinforcement (509E10000) | LB | 14,001 | $1.60 | $1.60 | $2.00 | $1.83 | $2.50 |
| 116 | Class QC2 concrete, bridge deck (511E34444) | CY | 34 | $1,500.00 | $1,500.00 | $1,800.00 | $698.08 | $1,400.00 |
| 117 | Class QC1 concrete, abutment (511E45710) | CY | 74 | $800.00 | $800.00 | $955.00 | $1,171.59 | $1,450.00 |
| 118 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 26 | $28.25 | $28.25 | $34.00 | $22.00 | $85.00 |
| 119 | Structural expansion joint including elastomeric compression seal (516E10500) | FT | 28.60 | $600.00 | $600.00 | $716.00 | $866.70 | $750.00 |
| 120 | Porous backfill with geotextile fabric (518E21200) | CY | 86 | $80.00 | $80.00 | $95.00 | $130.87 | $135.00 |
| 122 | 6" perforated corrugated plastic pipe (518E40000) | FT | 71 | $18.00 | $18.00 | $21.50 | $5.13 | $13.00 |
| 123 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 16 | $18.00 | $18.00 | $21.50 | $15.97 | $40.00 |
| 124 | Special - structures, single span 100'-11 1/2" X 1 (530E00200) | LS | 1 | $355,000 | $355,000 | $424,000 | $314,372 | $345,000 |
| 125 | Rock channel protection, type B with filter (601E32100) | CY | 252 | $110.00 | $110.00 | $132.00 | $218.92 | $180.00 |
| 126 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $350.00 | $350.00 | $418.00 | $432.02 | $700.00 |
| 127 | Structure grounding system (625E33000) | EACH | 1 | $6,490.00 | $6,490.00 | $7,750.01 | $6,490.00 | $7,150.00 |
| 128 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $36,499 | $46,555 | $35,319 | $150,000 |
| 129 | CPM progress schedule (108E10000) | LS | 1 | $16,000 | $24,000 | $6,000.00 | $14,860 | $15,000 |
| 130 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $100,000 | $245,000 | $32,170 | $700,000 |
| 131 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $70.00 | $90.00 | $130.00 | $95.00 | $135.00 |
| 132 | Field office, type B, as per plan (619E16011) | MNTH | 24 | $1,900.00 | $3,400.00 | $4,900.00 | $6,571.50 | $2,500.00 |
| 133 | Construction layout stakes and surveying (623E10000) | LS | 1 | $150,000 | $250,000 | $180,000 | $92,400 | $125,000 |
| 134 | Providing electronic instrumentation (623E11000) | LS | 1 | $20,000 | $5,000.00 | $3,600.00 | $32,819 | $25,000 |
| 135 | Mobilization (624E10000) | LS | 1 | $150,000 | $400,000 | $100,000 | $184,300 | $200,000 |
| 200 | Excavation of subgrade (204E13000) | CY | 480 | $38.00 | $50.00 | $48.00 | $73.25 | $65.00 |
| 201 | Granular material, type C (204E30020) | CY | 894 | $72.00 | $100.00 | $58.00 | $130.18 | $80.00 |
| 202 | Geotextile fabric (204E50000) | SY | 1,120 | $1.90 | $4.00 | $1.50 | $2.27 | $4.00 |
| 203 | Dynamic load testing (523E20000) | EACH | 2 | $4,500.00 | $4,500.00 | $5,000.00 | $8,579.67 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 15, 2025. Compiled by Mirage Metrics.