Rack & Ballauer Excavating Co Inc: ODOT bid record
Rack & Ballauer Excavating Co Inc submitted 49 bids on Ohio DOT contracts in the data, from 12 MAR 2020 to 12 NOV 2026, and was the low bidder on 13 of them (27%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $17,372,995
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 17 | 5 | 29% |
| 2021 | 11 | 3 | 27% |
| 2022 | 7 | 0 | 0% |
| 2023 | 4 | 3 | 75% |
| 2024 | 4 | 1 | 25% |
| 2025 | 4 | 1 | 25% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BUT | 13 | 4 | 31% |
| CLE | 11 | 4 | 36% |
| HAM | 11 | 3 | 27% |
| BRO | 4 | 1 | 25% |
| CLI | 3 | 0 | 0% |
| PRE | 3 | 0 | 0% |
| WAR | 2 | 0 | 0% |
| HIG | 1 | 0 | 0% |
| ADA | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 43 | 43 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 41 | 21 (51%) | $1.00 | $1.00 |
| Non-tracking tack coat | 407E20000 | GAL | 23 | 21 (91%) | $1.00 | $3.25 |
| Tack coat | 407E10000 | GAL | 20 | 14 (70%) | $3.00 | $3.25 |
| Center line, type 1 | 642E00300 | MI | 22 | 13 (59%) | $31,050 | $5,500.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 20 | 13 (65%) | $12.00 | $15.20 |
| Seeding and mulching | 659E10000 | SY | 37 | 12 (32%) | $2.80 | $2.60 |
| Sign, flat sheet | 630E80100 | SF | 20 | 12 (60%) | $22.00 | $24.00 |
| Guardrail, type MGS | 606E15050 | FT | 20 | 12 (60%) | $22.00 | $22.73 |
| Edge line, 6", type 1 | 642E00104 | MI | 22 | 11 (50%) | $29,435 | $3,200.00 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | 22 | 11 (50%) | $265.00 | $235.00 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 16 | 11 (69%) | $17.80 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sunesis Construction Co | 35 | 7 of 35 |
| John R Jurgensen Company | 33 | 5 of 33 |
| Eclipse Co LLC | 20 | 2 of 20 |
| Barrett Paving Materials Inc | 20 | 10 of 20 |
| Axis Civil Construction LLC | 17 | 5 of 17 |
| Prus Construction Company | 12 | 5 of 12 |
| Eagle Bridge Co | 10 | 4 of 10 |
| Fillmore Construction | 8 | 4 of 8 |
| Complete General Construction Company | 7 | 0 of 7 |
| Belgray, Inc | 5 | 0 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260502 | HAM | HAM-IR 275-05.25 (SLIDE REPAIR) | 2 of 4 | $1,092,143 | +7.0% |
| 01 OCT 2026 | 264025 | CLI | CLI-SR 72-02.18 (CULVERT REPLACEMENT) | 2 of 5 | $333,725 | +13% |
| 13 NOV 2025 | 250517 | CLE | CLE-Culverts FY26 | 4 of 10 | $357,393 | +22% |
| 26 JUN 2025 | 250319 | HAM | HAM-IR 74-11.25 (MISCELLANEOUS) | 3 of 4 | $694,000 | +62% |
| 15 MAY 2025 | 250251 | HAM | HAM-WW to Glenwood Gardens Trail (BIKEWAYS) | 1 of 5 | $6,761,485 | Low, 14% under the second |
| 30 JAN 2025 | 254003 | BRO | BRO-SR 756-00.14 (CULVERT REPLACEMENT) | 2 of 4 | $335,100 | +14% |
| 05 DEC 2024 | 240544 | BUT | BUT-SR 122-02.70 (INTERSECTION) | 3 of 7 | $1,836,681 | +3.0% |
| 14 NOV 2024 | 240525 | HAM | HAM-Culverts FY25 (CULVERT REPLACEMENT) | 1 of 5 | $442,497 | Low, 11% under the second |
| 26 SEP 2024 | 240431 | CLE | CLE-Culverts FY25 (CULVERT REPLACEMENT) | 3 of 6 | $829,424 | +26% |
| 11 JAN 2024 | 240007 | CLE | CLE-SR 132-12.49 (INTERSECTION) | 2 of 4 | $2,719,490 | +3.0% |
| 26 OCT 2023 | 230511 | CLE | CLE-/HAM Culverts FY24 (CULVERT REPLACEMENT) | 1 of 4 | $1,144,467 | Low, 38% under the second |
| 12 OCT 2023 | 230490 | HAM | HAM-CR 90-03.89 (SIDEWALK) | 1 of 3 | $312,497 | Low, 16% under the second |
| 28 SEP 2023 | 234022 | CLE | CLE-CLI Culverts FY24 (CULVERT REPLACEMENT) | 1 of 3 | $548,425 | Low, 24% under the second |
| 26 JAN 2023 | 230049 | HAM | HAM-IR 275-07.50 (CULVERT REPLACEMENT) | 3 of 4 | $232,457 | +22% |
| 03 NOV 2022 | 220567 | BUT | BUT-CULVERTS FY23 (CULVERT REPLACEMENT) | 2 of 6 | $550,550 | +16% |
| 13 OCT 2022 | 220557 | WAR | WAR-IR 71/SR 123-08.05/20.89 (CULVERT REPLACEMENT) | 2 of 5 | $328,445 | +11% |
| 29 SEP 2022 | 220530 | PRE | PRE-US 127-04.50 (INTERSECTION) | 2 of 5 | $1,577,490 | +6.0% |
| 10 MAR 2022 | 220082 | BUT | BUT-US 27-01.85 (INTERSECTION) | 3 of 4 | $4,797,486 | +23% |
| 17 FEB 2022 | 220124 | HAM | HAM-IR 71 Ramp Stewart Rd Culvert (CULVERT REPLACEMENT) | 2 of 4 | $517,315 | +2.0% |
| 13 JAN 2022 | 220001 | BUT | BUT-SR 129-07.20 (CULVERT REPLACEMENT) | 3 of 5 | $255,751 | +2.0% |
| 13 JAN 2022 | 224001 | WAR | WAR-SR 122-06.33 (CULVERT REPLACEMENT) | 2 of 4 | $291,910 | +4.0% |
| 16 DEC 2021 | 210653 | ADA | ADA-/BRO-SR 136/US 62-18.96/26.50 (MINOR WIDENING) | 1 of 4 | $2,554,364 | Low, 4.0% under the second |
| 18 NOV 2021 | 214017 | BUT | BUT-Culverts FY22 (CULVERT REPLACEMENT) | 2 of 5 | $328,562 | +21% |
| 28 OCT 2021 | 210568 | CLI | CLI-SR 28/SR 124-04.52/05.47/00.54 (CULVERT REPLACEMENT) | 2 of 8 | $756,945 | +1.0% |
| 14 OCT 2021 | 210535 | CLE | CLE-HAM Culverts FY22 (CULVERT REPLACEMENT) | 1 of 2 | $1,077,771 | Low, 1.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.