ODOT letting results, June 26, 2025

20 contracts let by Ohio DOT on June 26, 2025, $19,425,821 in low bids, a median of 2 bidders per contract. On the 20 with an engineer's estimate, the low bid came in under it 12 times; median low bid -3.0% against the estimate.

Owner
Ohio DOT
Contracts
20
Low bids, total
$19,425,821
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250325SCI-US 52-15.81 (FOUR LANE RESURFACING)SCI1Shelly Company$2,847,533+1.0%ODOT
254019STA-SR 44-00.00 (TWO LANE RESURFACING)STA1Barbicas Construction Company Inc$2,507,740+23%ODOT
250320LAK-SR 84-01.00 (TWO LANE RESURFACING)LAK4Phillips Paving LLC$2,495,176$2,562,828+3.0%+12%ODOT
250318ADA-SR 125/SR 136/SR 247-00.00/20.40/18.17 (MICROSURFACING)ADA1Strawser Construction Inc$1,574,787+15%ODOT
258015D08-GR FY2026 (GUARDRAIL REBUILDING)District 81Lake Erie Construction Company$1,494,395-3.0%ODOT
254020TRU-SR 46-08.01 (TWO LANE RESURFACING)TRU2B & G Trucking & Construction Inc$1,426,135$1,651,108+16%+10%ODOT
250323PER-CR 22-00.00 (TWO LANE RESURFACING)PER1Shelly Company$1,392,603-7.0%ODOT
250329D05-GR FY2026 (Ding N Dent) (GUARDRAIL REBUILDING)District 53Lake Erie Construction Company$1,148,225$1,186,443+3.0%-3.0%ODOT
250322MIA-SR 41-11.70 (TWO LANE RESURFACING)MIA1Walls Bros Asphalt Co Inc$965,818+7.0%ODOT
250334NOB-CR 19-00.00 (TWO LANE RESURFACING)NOB2Shelly & Sands Inc$520,566$605,650+16%-19%ODOT
258017LAW-SR 217-02.53 (SLIDE REPAIR)LAW5Allard Excavation LLC$444,747$445,4040.0%-16%ODOT
250326TRU-Elmwood Dr (Hubbard) (TWO LANE RESURFACING)TRU5Shelly & Sands Inc$443,049$518,878+17%-11%ODOT
250319HAM-IR 74-11.25 (MISCELLANEOUS)HAM4Sunesis Construction Co$429,044$440,069+3.0%-1.0%ODOT
250328D03-CRSEAL FY2026 (CRACK SEALING)District 33Scodeller Construction Inc$367,392$521,587+42%-10%ODOT
250332HAM-US 22-11.41 (BRIDGE REPAIR)HAM1Evers Steel Construction LLC$364,463+35%ODOT
258016JAC-SR 279-02.59 (CULVERT REPLACEMENT)JAC5Fillmore Construction$268,606$277,120+3.0%-4.0%ODOT
250327CLA-Old Reid Park Access Road (TWO LANE RESURFACING)CLA2Fillmore Construction$257,800$266,246+3.0%-12%ODOT
250324PUT-Ottawa Ped. Improvements (SPOT SAFETY)PUT4Ward Construction Co$185,523$281,751+52%-35%ODOT
250331FRA-IR 70-12.14 FEN (FENCING)FRA2M P Dory Co$168,837$272,150+61%-11%ODOT
250321MAR-SR 37-08.03 (TWO LANE RESURFACING)MAR2Shelly & Sands Inc$123,384$159,255+29%+7.0%ODOT
ODOT contracts let on June 26, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy