Phillips Paving LLC: ODOT bid record
Phillips Paving LLC submitted 25 bids on Ohio DOT contracts in the data, from 12 OCT 2023 to 25 JUN 2026, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,944,399
- Latest bid
- 25 JUN 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 3 | 1 | 33% |
| 2024 | 7 | 1 | 14% |
| 2025 | 5 | 1 | 20% |
| 2026 | 10 | 1 | 10% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| LAK | 7 | 1 | 14% |
| GEA | 4 | 0 | 0% |
| POR | 3 | 1 | 33% |
| CUY | 3 | 0 | 0% |
| TRU | 2 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
| District 12 | 1 | 1 | 100% |
| LOR | 1 | 0 | 0% |
| ATB | 1 | 1 | 100% |
| COL | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Non-tracking tack coat | 407E20000 | GAL | 22 | 22 (100%) | $2.00 | $3.25 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 16 | 9 (56%) | $1,050.00 | $1,186.00 |
| Center line | 646E10200 | MI | 13 | 9 (69%) | $4,100.00 | $12,144 |
| Work zone marking sign | 614E12460 | EACH | 13 | 9 (69%) | $75.00 | $92.00 |
| Raised pavement marker removed | 621E54000 | EACH | 12 | 9 (75%) | $1.00 | $12.00 |
| Stop line | 646E10400 | FT | 12 | 9 (75%) | $12.50 | $13.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 20 | 8 (40%) | $900.00 | $950.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 16 | 8 (50%) | $3.48 | $3.50 |
| Detector loop, as per plan | 632E26501 | EACH | 10 | 8 (80%) | $1,450.00 | $1,400.00 |
| Work zone center line, class I, 642 paint | 614E21100 | MI | 13 | 7 (54%) | $1,195.00 | $1,485.00 |
| Work zone stop line, class I, 642 paint | 614E26200 | FT | 13 | 6 (46%) | $3.50 | $3.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Karvo Companies Inc | 25 | 13 of 25 |
| Ronyak Paving Inc | 18 | 15 of 18 |
| Barbicas Construction Company Inc | 17 | 5 of 17 |
| Shelly Company | 16 | 5 of 16 |
| Kokosing Construction Company Inc | 9 | 6 of 9 |
| Geauga Highway Co | 9 | 7 of 9 |
| Cole Burton Contractors, LLC | 6 | 5 of 6 |
| Shelly & Sands Inc | 4 | 4 of 4 |
| Specialized Construction Inc | 2 | 2 of 2 |
| Kirila Contractors Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 JUN 2026 | 260311 | CUY | CUY-Van Aken Blvd Resurfacing (FOUR LANE RESURFACING) | 4 of 4 | $1,282,675 | +27% |
| 11 JUN 2026 | 260284 | COL | COL-SR 9/SR 14-14.23/03.65 (TWO LANE RESURFACING) | 4 of 4 | $927,029 | +26% |
| 21 MAY 2026 | 260276 | ATB | ATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS) | 1 of 6 | $2,107,662 | Low, 4.0% under the second |
| 21 MAY 2026 | 260277 | District 4 | D04-SP FY2026 (East) (SPOT PATCHING / PAVEMENT REPAIR) | 3 of 3 | $1,892,875 | +71% |
| 07 MAY 2026 | 260245 | POR | POR-SR 261-03.51 (TWO LANE RESURFACING) | 5 of 6 | $1,132,497 | +9.0% |
| 12 MAR 2026 | 260120 | GEA | GEA-SR 528-14.52 (TWO LANE RESURFACING) | 2 of 4 | $463,533 | +16% |
| 19 FEB 2026 | 260081 | CUY | CUY-SR 87-14.72 (TWO LANE RESURFACING) | 2 of 7 | $734,385 | +10% |
| 19 FEB 2026 | 260094 | POR | POR-SR 82/SR 306-02.37/00.00 (TWO LANE RESURFACING) | 5 of 5 | $2,372,242 | +14% |
| 29 JAN 2026 | 260056 | LAK | LAK-SR 174-00.00 (TWO LANE RESURFACING) | 8 of 8 | $2,125,239 | +23% |
| 29 JAN 2026 | 260057 | LAK | LAK-SR 84/VAR-18.21/VAR (TWO LANE RESURFACING) | 5 of 7 | $1,736,660 | +54% |
| 18 DEC 2025 | 250561 | LAK | LAK-SR 174-04.39 (TWO LANE RESURFACING) | 5 of 7 | $1,045,714 | +40% |
| 18 DEC 2025 | 250588 | LAK | LAK-US 20-17.13 (FOUR LANE RESURFACING) | 3 of 6 | $1,041,792 | +16% |
| 25 SEP 2025 | 250436 | GEA | GEA-SR 87-02.73 (TWO LANE RESURFACING) | 5 of 6 | $1,829,493 | +34% |
| 26 JUN 2025 | 250320 | LAK | LAK-SR 84-01.00 (TWO LANE RESURFACING) | 1 of 4 | $2,495,176 | Low, 3.0% under the second |
| 26 JUN 2025 | 250326 | TRU | TRU-Elmwood Dr (Hubbard) (TWO LANE RESURFACING) | 3 of 5 | $525,569 | +19% |
| 23 MAY 2024 | 248005 | LOR | LOR-IR 90-10.76 RM (SPOT PATCHING / PAVEMENT REPAIR) | 3 of 3 | $1,968,304 | +10% |
| 18 APR 2024 | 240252 | District 4 | D04-SP FY2024 (East) (SPOT PATCHING / PAVEMENT REPAIR) | 3 of 4 | $1,595,000 | +36% |
| 21 MAR 2024 | 240175 | District 12 | D12-PPM FY2024 (SPOT PATCHING / PAVEMENT REPAIR) | 1 of 3 | $1,844,435 | Low, 14% under the second |
| 21 MAR 2024 | 240179 | LAK | LAK-US 6-00.44 (TWO LANE RESURFACING) | 4 of 6 | $1,169,767 | +3.0% |
| 22 FEB 2024 | 240137 | GEA | GEA-SR 608-00.00/05.22 (TWO LANE RESURFACING) | 4 of 6 | $774,584 | +15% |
| 25 JAN 2024 | 230593 | CUY | CUY-US 6-26.65 (TWO LANE RESURFACING) | 3 of 7 | $1,794,983 | +12% |
| 25 JAN 2024 | 240056 | LAK | LAK-Liberty Street (TWO LANE RESURFACING) | 4 of 6 | $1,177,232 | +21% |
| 14 DEC 2023 | 230602 | POR | POR-Frost Rd Ph 2 (Streetsboro) (TWO LANE RESURFACING) | 1 of 8 | $497,127 | Low, 0.0% under the second |
| 26 OCT 2023 | 230519 | GEA | GEA-SR 87-00.00 (TWO LANE RESURFACING) | 5 of 5 | $1,478,061 | +30% |
| 12 OCT 2023 | 230499 | TRU | TRU-SR 5-14.36 (TWO LANE RESURFACING) | 5 of 5 | $1,843,752 | +22% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.