Barbicas Construction Company Inc submitted 125 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 11 of them (9%). When it was not low, its total sat a median +19% above the low bid.

Owner
Ohio DOT
Low bid volume
$11,197,624
Latest bid
12 NOV 2026
Data through
12 NOV 2026
125Bids
11Low bids
9Win rate, percent
+19%Median gap to the low bid when not low, 114 bids

By year

YearBidsLow bidsWin rate
20203027%
202110220%
20222428%
202313215%
20242314%
202517212%
2026800%
Barbicas Construction Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
SUM19421%
CUY1517%
LAK1200%
District 410110%
TRU1000%
STA9111%
TUS800%
GEA800%
POR700%
COL500%
LOR300%
CAR300%
Barbicas Construction Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH107107 (100%)$1.00$1.00
Law enforcement officer with patrol car for assistance614E11110HR9143 (47%)$80.00$80.00
Work zone center line, class III, 642 paint614E21550MI8343 (52%)$1,100.00$1,186.00
Field office, type B619E16010MNTH5042 (84%)$800.00$2,000.00
Portable changeable message sign, as per plan614E18601SNMT6841 (60%)$900.00$950.00
Work zone stop line, class III, 642 paint614E26610FT6839 (57%)$3.50$3.50
Work zone marking sign614E12460EACH6938 (55%)$75.00$92.00
Partial depth pavement repair (441)251E01000SY5032 (64%)$27.50$45.00
Special - miscellaneous metal611E99820LB5430 (56%)$2.00$2.29
Stop line646E10400FT5328 (53%)$12.50$13.00
Valve box adjusted to grade, as per plan638E10801EACH4528 (62%)$600.00$750.00
Work zone center line, class I, 642 paint614E21100MI5027 (54%)$1,192.50$1,485.00
Barbicas Construction Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Barbicas Construction Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260510SUMSUM-SR 261-11.89 (FOUR LANE RESURFACING)6 of 7$1,948,284+41%
21 MAY 2026260276ATBATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS)3 of 6$2,223,876+6.0%
07 MAY 2026260245PORPOR-SR 261-03.51 (TWO LANE RESURFACING)6 of 6$1,200,270+16%
07 MAY 2026260256District 4D04-SP FY2026 (West) (SPOT PATCHING / PAVEMENT REPAIR)2 of 2$1,716,427+20%
12 MAR 2026260120GEAGEA-SR 528-14.52 (TWO LANE RESURFACING)4 of 4$508,643+27%
19 FEB 2026260081CUYCUY-SR 87-14.72 (TWO LANE RESURFACING)5 of 7$802,510+20%
29 JAN 2026260056LAKLAK-SR 174-00.00 (TWO LANE RESURFACING)7 of 8$1,999,953+16%
29 JAN 2026260057LAKLAK-SR 84/VAR-18.21/VAR (TWO LANE RESURFACING)7 of 7$1,771,547+57%
18 DEC 2025250561LAKLAK-SR 174-04.39 (TWO LANE RESURFACING)4 of 7$980,298+31%
18 DEC 2025250588LAKLAK-US 20-17.13 (FOUR LANE RESURFACING)6 of 6$1,196,476+33%
25 SEP 2025250433COLCOL-SR 39/SR 45-13.06/00.37 (TWO LANE RESURFACING)4 of 4$1,553,148+15%
25 SEP 2025250436GEAGEA-SR 87-02.73 (TWO LANE RESURFACING)6 of 6$1,906,787+40%
11 SEP 2025250418STASTA-US 62-36.42/38.60 (TWO LANE RESURFACING)3 of 3$1,820,533+12%
28 AUG 2025250397TRUTRU-SR 193-00.00 (FOUR LANE RESURFACING)4 of 4$1,328,377+26%
17 JUL 2025250349SUMSUM-SR 21-19.57/VAR (TWO LANE RESURFACING)8 of 8$1,333,305+64%
26 JUN 2025250320LAKLAK-SR 84-01.00 (TWO LANE RESURFACING)2 of 4$2,562,828+3.0%
26 JUN 2025250326TRUTRU-Elmwood Dr (Hubbard) (TWO LANE RESURFACING)2 of 5$518,878+17%
26 JUN 2025254019STASTA-SR 44-00.00 (TWO LANE RESURFACING)1 of 1$2,507,740Low
26 JUN 2025254020TRUTRU-SR 46-08.01 (TWO LANE RESURFACING)2 of 2$1,651,108+16%
22 MAY 2025250293District 4D04-SP FY2025 (West) (SPOT PATCHING / PAVEMENT REPAIR)1 of 2$1,273,386Low, 16% under the second
10 APR 2025250208TRUTRU-N River Rd Parking Lot (PARKING AREAS)2 of 3$219,299+7.0%
27 MAR 2025250168TUSTUS-New Phila Paving Phase 2 (TWO LANE RESURFACING)4 of 6$1,121,158+30%
27 FEB 2025250140COLCOL-ODNR GUILFORD LAKE STATE PAR (PARKING AREAS)2 of 4$1,103,834+12%
13 FEB 2025250105WAYWAY-SR 94/US 30A-06.70/00.00 (TWO LANE RESURFACING)3 of 3$1,454,5410.0%
13 FEB 2025254008GEAGEA-US 422-01.46/VAR Drainage (MISCELLANEOUS)2 of 2$906,541+42%
Barbicas Construction Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy