ODOT contract 260276 bid tabulation
ATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS). Let by Ohio DOT on May 21, 2026, ATB. 6 bids received; low bid $2,107,662 by Phillips Paving LLC, +9.8% against the engineer's estimate of $1,919,000.
- Owner
- Ohio DOT
- Letting
- 21 MAY 2026
- Pay items
- 27
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Phillips Paving LLC | $2,107,662 | Low | +10% |
| 2 | Ohio Paving & Construction Co Inc | $2,197,466 | +4.0% | +15% |
| 3 | Barbicas Construction Company Inc | $2,223,876 | +6.0% | +16% |
| 4 | Geauga Highway Co | $2,266,241 | +8.0% | +18% |
| 5 | Karvo Companies Inc | $2,327,624 | +10% | +21% |
| 6 | Ronyak Paving Inc | $2,362,273 | +12% | +23% |
Engineer's estimate: $1,919,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phillips Paving LLC | 2. Ohio Paving & Construction Co Inc | 3. Barbicas Construction Company Inc | 4. Geauga Highway Co | 5. Karvo Companies Inc | 6. Ronyak Paving Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Special - parking block removed and replaced (202E53000) | EACH | 180 | $300.00 | $368.46 | $130.00 | $250.00 | $10.00 | $150.00 |
| 2 | Special - parking block removed and reset (202E53010) | EACH | 300 | $75.00 | $53.56 | $30.00 | $50.00 | $5.00 | $90.00 |
| 3 | Excavation (203E10000) | CY | 1,682 | $40.00 | $56.87 | $30.00 | $55.00 | $75.00 | $40.00 |
| 4 | Roadway, misc.: block removed and reset (203E98600) | EACH | 200 | $75.00 | $53.56 | $30.00 | $75.00 | $5.00 | $90.00 |
| 5 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $6,500.00 | $1,500.00 | $4,500.00 | $2,500.00 | $1,500.00 |
| 6 | Catch basin reconstructed to grade (611E98634) | EACH | 5 | $3,000.00 | $500.00 | $1,200.00 | $1,800.00 | $2,500.00 | $2,500.00 |
| 7 | Special - miscellaneous metal (611E99820) | LB | 400 | $10.00 | $2.50 | $2.00 | $2.30 | $2.00 | $5.00 |
| 8 | Partial depth pavement repair (441) (251E01000) | SY | 6,300 | $25.00 | $25.04 | $25.00 | $36.00 | $40.00 | $45.00 |
| 9 | Pavement planing, asphalt concrete (T=1.5") (254E01000) | SY | 102,694 | $2.90 | $2.79 | $1.75 | $3.60 | $2.00 | $2.75 |
| 10 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 673 | $190.00 | $219.58 | $190.00 | $250.00 | $225.00 | $200.00 |
| 11 | Aggregate base (304E20000) | CY | 808 | $70.00 | $98.27 | $70.00 | $95.00 | $100.00 | $100.00 |
| 12 | Non-tracking tack coat (407E20000) | GAL | 6,453 | $2.00 | $5.00 | $2.90 | $3.50 | $3.00 | $4.00 |
| 13 | Crack sealing, type II (423E00204) | SY | 11,112 | $1.00 | $0.88 | $0.50 | $1.55 | $1.00 | $0.50 |
| 14 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 4,482 | $230.00 | $265.63 | $321.00 | $245.00 | $275.00 | $260.00 |
| 15 | Fog seal (886E11000) | GAL | 1,667 | $7.00 | $9.16 | $8.50 | $5.00 | $10.00 | $5.00 |
| 16 | Center line, type 1A (642E00310) | MI | 0.15 | $1,500.00 | $7,000.00 | $8,000.00 | $1,371.00 | $5,825.00 | $1,371.00 |
| 17 | Stop line, type 1 (642E00500) | FT | 95 | $10.00 | $2.42 | $10.00 | $8.00 | $8.00 | $8.00 |
| 18 | Transverse/diagonal line, type 1 (642E00700) | FT | 1,850 | $7.00 | $0.43 | $2.00 | $7.00 | $1.25 | $7.00 |
| 19 | Parking lot stall marking, type 1 (642E01200) | FT | 29,645 | $1.50 | $0.43 | $1.00 | $1.50 | $1.25 | $1.50 |
| 20 | Lane arrow, type 1 (642E01300) | EACH | 12 | $100.00 | $46.00 | $75.00 | $60.00 | $100.00 | $60.00 |
| 21 | Handicap symbol marking, type 1 (642E01702) | EACH | 33 | $100.00 | $46.00 | $55.00 | $55.00 | $100.00 | $55.00 |
| 22 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $46,000 | $19,000 | $15,000 | $14,400 | $25,000 | $15,623 |
| 23 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $7,500.00 | $8,500.00 | $8,500.00 | $25,000 | $90,000 |
| 24 | Field office, type B (619E16010) | MNTH | 3 | $2,500.00 | $3,000.00 | $1,000.00 | $750.00 | $3,000.00 | $1,500.00 |
| 25 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,000.00 | $6,000.00 | $200.00 | $2,500.00 | $15,000 | $2,055.00 |
| 26 | Mobilization (624E10000) | LS | 1 | $73,000 | $18,000 | $60,000 | $5,000.00 | $89,567 | $44,565 |
| 100 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.