ODOT letting results, May 21, 2026
22 contracts let by Ohio DOT on May 21, 2026, $40,386,827 in low bids, a median of 2 bidders per contract. On the 21 with an engineer's estimate, the low bid came in under it 8 times; median low bid +5.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 22
- Low bids, total
- $40,386,827
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260263 | COS-SR 16-01.40 (CULVERT REPLACEMENT) | COS | 2 | Daniel R Schmoldt Enterprises Inc | $4,481,615 | $4,913,390 | +10% | +12% | ODOT |
| 260269 | JEF-SR 213-00.06 (TWO LANE RESURFACING) | JEF | 2 | NLS Paving, Inc | $3,722,438 | $3,743,925 | +1.0% | +8.0% | ODOT |
| 260273 | PUT-SR 694-00.00 (PART 1 AND PART 2) (TWO LANE RESURFACING) | PUT | 2 | Bluffton Paving Inc | $3,581,814 | $3,879,430 | +8.0% | -8.0% | ODOT |
| 260270 | LAW-SR 650-07.16 (BRIDGE REPLACEMENT (1 BRIDGE)) | LAW | 3 | Alan Stone Co Inc | $2,867,765 | $2,994,768 | +4.0% | +5.0% | ODOT |
| 260264 | CRA-/WAY MICRO VAR FY2027 (MICROSURFACING) | CRA | 2 | Pavement Maintenance Systems LLC | $2,498,356 | $2,692,588 | +8.0% | +29% | ODOT |
| 260268 | JAC-US 35-18.16 (Safety) (PART 1 AND PART 2) (INTERSECTION) | JAC | 4 | Shelly & Sands Inc | $2,276,498 | $2,481,157 | +9.0% | -3.0% | ODOT |
| 260280 | FRA-US 33-08.75 Culvert Repl. (CULVERT REPLACEMENT) | FRA | 2 | Complete General Construction Company | $2,223,194 | $2,472,520 | +11% | +31% | ODOT |
| 260278 | D05-Spot Paving FY2027 (SPOT PATCHING / PAVEMENT REPAIR) | District 5 | 1 | Shelly Company | $2,117,532 | +38% | ODOT | ||
| 260276 | ATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS) | ATB | 6 | Phillips Paving LLC | $2,107,662 | $2,197,466 | +4.0% | +10% | ODOT |
| 268010 | D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION) | District 8 | 5 | John R Jurgensen Company | $2,057,042 | $2,196,687 | +7.0% | -8.0% | ODOT |
| 260266 | HUR-/ERI-SR 113/SR 99-06.689/14.951 (TWO LANE RESURFACING) | HUR | 2 | Gerken Paving Inc | $1,731,157 | $1,786,397 | +3.0% | -19% | ODOT |
| 264013 | D05-CUL FY2026 (A) (CULVERT REPLACEMENT) | District 5 | 2 | Buds Inc | $1,681,992 | $1,877,320 | +12% | +10% | ODOT |
| 260265 | DEF-SR 66-04.24 (SLIDE REPAIR) | DEF | 6 | Kokosing Construction Company Inc | $1,558,998 | $1,501,500 | -4.0% | +7.0% | ODOT |
| 260262 | CLA-SR 56-00.00 | CLA | 2 | Shelly Company | $1,413,513 | $1,573,497 | +11% | ODOT | |
| 260274 | SCI-SR 335-02.04 (TWO LANE RESURFACING) | SCI | 2 | Shelly Company | $1,343,949 | $1,387,346 | +3.0% | -7.0% | ODOT |
| 260277 | D04-SP FY2026 (East) (SPOT PATCHING / PAVEMENT REPAIR) | District 4 | 3 | Karvo Companies Inc | $1,107,697 | $1,545,295 | +40% | -13% | ODOT |
| 260281 | RIC-US 30-16.42 (BRIDGE REPAIR) | RIC | 2 | Ruhlin Company | $1,067,722 | $1,464,181 | +37% | +14% | ODOT |
| 260272 | POR-US 224/SR 303-08.29/19.51 (CULVERT REPLACEMENT) | POR | 3 | BCC Ohio Inc | $707,216 | $796,012 | +13% | -5.0% | ODOT |
| 264015 | WAY-SR 3-04.62/08.55/08.96/11.61 (CULVERT REPLACEMENT) | WAY | 3 | Eius Company | $609,692 | $647,464 | +6.0% | +1.0% | ODOT |
| 264014 | WAS-SR 60-15.43 (CULVERT REPLACEMENT) | WAS | 4 | R C Construction Company and Son Inc | $577,219 | $585,358 | +1.0% | +7.0% | ODOT |
| 260275 | WAS-CR 111-05.41 (RELOCATION) | WAS | 3 | R C Construction Company and Son Inc | $440,375 | $449,299 | +2.0% | +4.0% | ODOT |
| 260279 | D07-RPM FY26 (RAISED PAVEMENT MARKERS) | District 7 | 2 | A & A Safety Inc | $213,378 | $223,295 | +5.0% | -17% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.