ODOT contract 260262 bid tabulation
CLA-SR 56-00.00. Let by Ohio DOT on May 21, 2026, CLA. 2 bids received; low bid $1,413,513 by Shelly Company.
- Owner
- Ohio DOT
- Letting
- 21 MAY 2026
- Pay items
- 20
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Shelly Company | $1,413,513 | Low |
| 2 | A & B Asphalt Corporation | $1,573,497 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. A & B Asphalt Corporation |
|---|---|---|---|---|---|
| 1 | Preparing subgrade for shoulder paving (209E72050) | MI | 8.26 | $1,200.00 | $1,919.39 |
| 2 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $175.00 | $2,789.28 |
| 3 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 750 | $45.00 | $88.28 |
| 4 | Pavement planing, asphalt concrete 1 1/2" depth (254E01000) | SY | 4,868 | $2.06 | $2.40 |
| 5 | Pavement planing, asphalt concrete 2 1/2" depth (254E01000) | SY | 58,789 | $2.06 | $2.40 |
| 6 | Patching planed surface, as per plan (254E01601) | SY | 200 | $15.00 | $20.68 |
| 7 | Asphalt concrete base, (449), as per plan, PG64-22 (301E56001) | CY | 8 | $500.00 | $1,045.70 |
| 8 | Non-tracking tack coat (407E20000) | GAL | 8,645 | $3.00 | $4.00 |
| 9 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 2,704 | $250.00 | $271.75 |
| 10 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 1,634 | $235.00 | $244.23 |
| 11 | Compacted aggregate (617E10100) | CY | 135 | $125.00 | $161.84 |
| 12 | RPM (621E00100) | EACH | 312 | $43.00 | $52.08 |
| 13 | Raised pavement marker removed (621E54000) | EACH | 312 | $4.00 | $15.78 |
| 14 | Edge line, 6", type 1 (642E00104) | MI | 8.26 | $800.00 | $1,312.00 |
| 15 | Center line, type 1 (642E00300) | MI | 4.13 | $900.00 | $1,312.00 |
| 16 | Work zone marking sign (614E12460) | EACH | 42 | $87.87 | $120.00 |
| 17 | Work zone center line, class I, 642 paint (614E21100) | MI | 8.26 | $1,521.00 | $2,750.00 |
| 18 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $4,720.49 |
| 19 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $51,260 |
| 20 | Mobilization (624E10000) | LS | 1 | $40,000 | $11,889 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.