A & B Asphalt Corporation: ODOT bid record

A & B Asphalt Corporation submitted 32 bids on Ohio DOT contracts in the data, from 09 APR 2020 to 17 SEP 2026, and was the low bidder on 12 of them (38%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$8,682,855
Latest bid
17 SEP 2026
Data through
12 NOV 2026
32Bids
12Low bids
38Win rate, percent
+8.0%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
20204375%
20218225%
20228225%
20233133%
20253267%
20266233%
A & B Asphalt Corporation, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CHP13646%
CLA9222%
MOT5360%
GRE200%
MAD2150%
MIA100%
A & B Asphalt Corporation, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Stop line644E00500FT2316 (70%)$7.95$8.29
Non-tracking tack coat407E20000GAL2314 (61%)$2.01$3.25
Work zone stop line, class III, 642 paint614E26610FT2013 (65%)$3.00$3.50
Valve box adjusted to grade638E10800EACH1511 (73%)$55.00$500.00
Pavement repair, as per plan253E01001SY1810 (56%)$49.25$104.50
Channelizing line, 8"644E00400FT1410 (71%)$1.62$1.95
Work zone channelizing line, class III, 8", 642 paint614E23680FT1310 (77%)$0.74$0.75
Lane arrow644E01300EACH128 (67%)$88.50$110.00
Crosswalk line, 12"644E00620FT108 (80%)$4.00$4.50
Law enforcement officer with patrol car for assistance614E11110HR167 (44%)$75.00$80.00
Work zone center line, class III, 642 paint614E21550MI117 (64%)$2,060.00$1,186.00
Center line644E00300MI117 (64%)$5,674.00$7,070.00
A & B Asphalt Corporation, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Shelly Company2010 of 20
Barrett Paving Materials Inc195 of 19
Fillmore Construction75 of 7
Henry W Bergman Inc22 of 2
Shelly & Sands Inc21 of 2
Kokosing Construction Company Inc21 of 2
Sunesis Construction Co10 of 1
Roberts Paving Inc10 of 1
L J Deweese Co Inc11 of 1
Belgray, Inc11 of 1
A & B Asphalt Corporation, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
17 SEP 2026260401CHPCHP-SR PAVE FY27 (TWO LANE RESURFACING)2 of 3$6,893,800+9.0%
27 AUG 2026260380CLACLA-US 40-14.14 (TWO LANE RESURFACING)1 of 2$1,116,903Low, 22% under the second
21 MAY 2026260262CLACLA-SR 56-00.002 of 2$1,573,497+11%
07 MAY 2026260229CHPCHP-US 68-01.27 (TWO LANE RESURFACING)2 of 3$1,780,955+6.0%
12 MAR 2026260127MADMAD-US 42-07.14,MAD-SR 38-12.40/31.74 (TWO LANE RESURFACING)4 of 5$1,517,034+19%
29 JAN 2026260046CHPCHP-SR 55-15.02 (TWO LANE RESURFACING)1 of 3$461,961Low, 3.0% under the second
11 SEP 2025250420CLACLA-Clark Lake WLF (PARKING AREAS)1 of 4$226,563Low, 4.0% under the second
13 FEB 2025250082CHPCHP-PAVE-FY25 (TWO LANE RESURFACING)2 of 2$1,097,251+4.0%
30 JAN 2025250057MADMAD-SR-SR 56-00.00 (TWO LANE RESURFACING)1 of 5$1,235,347Low, 8.0% under the second
11 MAY 2023230296MOTMOT-Trotwood SRTS-Infras-FY23 (SIDEWALK)3 of 3$101,955+19%
13 APR 2023230209CHPCHP-US 36-14.04 (TWO LANE RESURFACING)1 of 3$550,128Low, 1.0% under the second
13 APR 2023230210CLACLA-SR 235-03.95 (TWO LANE RESURFACING)2 of 3$658,586+8.0%
28 JUL 2022220434CHPCHP-US 68-05.36 (TWO LANE RESURFACING)1 of 2$925,871Low, 11% under the second
14 JUL 2022220423MOTMOT-SR 202-04.37 (FOUR LANE RESURFACING)1 of 2$747,611Low, 28% under the second
26 MAY 2022220336CLACLA-SR 41-27.57 (TWO LANE RESURFACING)2 of 2$503,458+6.0%
12 MAY 2022220294GREGRE-Yellow Springs SRTS 2019 (SIDEWALK)2 of 2$384,825+30%
31 MAR 2022220220CHPCHP-ODNR Kiser Lake State Park 2 (PARKING AREAS)3 of 3$99,771+118%
17 MAR 2022220199MIAMIA-Lost Creek Parking Lot (PARKING AREAS)3 of 3$107,392+57%
17 FEB 2022220094GREGRE-Ohio to Erie Trail Resurface (BIKEWAYS)2 of 3$1,115,175+12%
27 JAN 2022220038CHPCHP-PAVE-FY22 (TWO LANE RESURFACING)2 of 3$2,280,511+1.0%
16 DEC 2021210673CHPCHP-SR 161-00.00 (TWO LANE RESURFACING)2 of 2$1,627,087+18%
01 JUL 2021210385CLACLA-US 40D/US 40-00.00/13.76 (FOUR LANE RESURFACING)2 of 2$767,011+7.0%
13 MAY 2021210275MOTMOT-Mad River Rec Trail Resurfac (MISCELLANEOUS)1 of 3$540,942Low, 2.0% under the second
11 MAR 2021210157CLACLA-SR 54-06.01 (TWO LANE RESURFACING)2 of 2$1,172,449+7.0%
25 FEB 2021210114CHPCHP-US 36/SR 29-15.05/21.07 (TWO LANE RESURFACING)1 of 3$562,870Low, 3.0% under the second
A & B Asphalt Corporation: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy