A & B Asphalt Corporation: ODOT bid record
A & B Asphalt Corporation submitted 32 bids on Ohio DOT contracts in the data, from 09 APR 2020 to 17 SEP 2026, and was the low bidder on 12 of them (38%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $8,682,855
- Latest bid
- 17 SEP 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 3 | 75% |
| 2021 | 8 | 2 | 25% |
| 2022 | 8 | 2 | 25% |
| 2023 | 3 | 1 | 33% |
| 2025 | 3 | 2 | 67% |
| 2026 | 6 | 2 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CHP | 13 | 6 | 46% |
| CLA | 9 | 2 | 22% |
| MOT | 5 | 3 | 60% |
| GRE | 2 | 0 | 0% |
| MAD | 2 | 1 | 50% |
| MIA | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Stop line | 644E00500 | FT | 23 | 16 (70%) | $7.95 | $8.29 |
| Non-tracking tack coat | 407E20000 | GAL | 23 | 14 (61%) | $2.01 | $3.25 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 20 | 13 (65%) | $3.00 | $3.50 |
| Valve box adjusted to grade | 638E10800 | EACH | 15 | 11 (73%) | $55.00 | $500.00 |
| Pavement repair, as per plan | 253E01001 | SY | 18 | 10 (56%) | $49.25 | $104.50 |
| Channelizing line, 8" | 644E00400 | FT | 14 | 10 (71%) | $1.62 | $1.95 |
| Work zone channelizing line, class III, 8", 642 paint | 614E23680 | FT | 13 | 10 (77%) | $0.74 | $0.75 |
| Lane arrow | 644E01300 | EACH | 12 | 8 (67%) | $88.50 | $110.00 |
| Crosswalk line, 12" | 644E00620 | FT | 10 | 8 (80%) | $4.00 | $4.50 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 16 | 7 (44%) | $75.00 | $80.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 11 | 7 (64%) | $2,060.00 | $1,186.00 |
| Center line | 644E00300 | MI | 11 | 7 (64%) | $5,674.00 | $7,070.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly Company | 20 | 10 of 20 |
| Barrett Paving Materials Inc | 19 | 5 of 19 |
| Fillmore Construction | 7 | 5 of 7 |
| Henry W Bergman Inc | 2 | 2 of 2 |
| Shelly & Sands Inc | 2 | 1 of 2 |
| Kokosing Construction Company Inc | 2 | 1 of 2 |
| Sunesis Construction Co | 1 | 0 of 1 |
| Roberts Paving Inc | 1 | 0 of 1 |
| L J Deweese Co Inc | 1 | 1 of 1 |
| Belgray, Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | 260401 | CHP | CHP-SR PAVE FY27 (TWO LANE RESURFACING) | 2 of 3 | $6,893,800 | +9.0% |
| 27 AUG 2026 | 260380 | CLA | CLA-US 40-14.14 (TWO LANE RESURFACING) | 1 of 2 | $1,116,903 | Low, 22% under the second |
| 21 MAY 2026 | 260262 | CLA | CLA-SR 56-00.00 | 2 of 2 | $1,573,497 | +11% |
| 07 MAY 2026 | 260229 | CHP | CHP-US 68-01.27 (TWO LANE RESURFACING) | 2 of 3 | $1,780,955 | +6.0% |
| 12 MAR 2026 | 260127 | MAD | MAD-US 42-07.14,MAD-SR 38-12.40/31.74 (TWO LANE RESURFACING) | 4 of 5 | $1,517,034 | +19% |
| 29 JAN 2026 | 260046 | CHP | CHP-SR 55-15.02 (TWO LANE RESURFACING) | 1 of 3 | $461,961 | Low, 3.0% under the second |
| 11 SEP 2025 | 250420 | CLA | CLA-Clark Lake WLF (PARKING AREAS) | 1 of 4 | $226,563 | Low, 4.0% under the second |
| 13 FEB 2025 | 250082 | CHP | CHP-PAVE-FY25 (TWO LANE RESURFACING) | 2 of 2 | $1,097,251 | +4.0% |
| 30 JAN 2025 | 250057 | MAD | MAD-SR-SR 56-00.00 (TWO LANE RESURFACING) | 1 of 5 | $1,235,347 | Low, 8.0% under the second |
| 11 MAY 2023 | 230296 | MOT | MOT-Trotwood SRTS-Infras-FY23 (SIDEWALK) | 3 of 3 | $101,955 | +19% |
| 13 APR 2023 | 230209 | CHP | CHP-US 36-14.04 (TWO LANE RESURFACING) | 1 of 3 | $550,128 | Low, 1.0% under the second |
| 13 APR 2023 | 230210 | CLA | CLA-SR 235-03.95 (TWO LANE RESURFACING) | 2 of 3 | $658,586 | +8.0% |
| 28 JUL 2022 | 220434 | CHP | CHP-US 68-05.36 (TWO LANE RESURFACING) | 1 of 2 | $925,871 | Low, 11% under the second |
| 14 JUL 2022 | 220423 | MOT | MOT-SR 202-04.37 (FOUR LANE RESURFACING) | 1 of 2 | $747,611 | Low, 28% under the second |
| 26 MAY 2022 | 220336 | CLA | CLA-SR 41-27.57 (TWO LANE RESURFACING) | 2 of 2 | $503,458 | +6.0% |
| 12 MAY 2022 | 220294 | GRE | GRE-Yellow Springs SRTS 2019 (SIDEWALK) | 2 of 2 | $384,825 | +30% |
| 31 MAR 2022 | 220220 | CHP | CHP-ODNR Kiser Lake State Park 2 (PARKING AREAS) | 3 of 3 | $99,771 | +118% |
| 17 MAR 2022 | 220199 | MIA | MIA-Lost Creek Parking Lot (PARKING AREAS) | 3 of 3 | $107,392 | +57% |
| 17 FEB 2022 | 220094 | GRE | GRE-Ohio to Erie Trail Resurface (BIKEWAYS) | 2 of 3 | $1,115,175 | +12% |
| 27 JAN 2022 | 220038 | CHP | CHP-PAVE-FY22 (TWO LANE RESURFACING) | 2 of 3 | $2,280,511 | +1.0% |
| 16 DEC 2021 | 210673 | CHP | CHP-SR 161-00.00 (TWO LANE RESURFACING) | 2 of 2 | $1,627,087 | +18% |
| 01 JUL 2021 | 210385 | CLA | CLA-US 40D/US 40-00.00/13.76 (FOUR LANE RESURFACING) | 2 of 2 | $767,011 | +7.0% |
| 13 MAY 2021 | 210275 | MOT | MOT-Mad River Rec Trail Resurfac (MISCELLANEOUS) | 1 of 3 | $540,942 | Low, 2.0% under the second |
| 11 MAR 2021 | 210157 | CLA | CLA-SR 54-06.01 (TWO LANE RESURFACING) | 2 of 2 | $1,172,449 | +7.0% |
| 25 FEB 2021 | 210114 | CHP | CHP-US 36/SR 29-15.05/21.07 (TWO LANE RESURFACING) | 1 of 3 | $562,870 | Low, 3.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.