ODOT contract 250057 bid tabulation
MAD-SR-SR 56-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on January 30, 2025, MAD. 5 bids received; low bid $1,235,347 by A & B Asphalt Corporation, -2.6% against the engineer's estimate of $1,268,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 57
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A & B Asphalt Corporation | $1,235,347 | Low | -3.0% |
| 2 | Shelly Company | $1,334,853 | +8.0% | +5.0% |
| 3 | Shelly & Sands Inc | $1,348,824 | +9.0% | +6.0% |
| 4 | Kokosing Construction Company Inc | $1,450,850 | +17% | +14% |
| 5 | Fillmore Construction | $1,497,801 | +21% | +18% |
Engineer's estimate: $1,268,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A & B Asphalt Corporation | 2. Shelly Company | 3. Shelly & Sands Inc | 4. Kokosing Construction Company Inc | 5. Fillmore Construction |
|---|---|---|---|---|---|---|---|---|
| 1 | Embankment, as per plan (203E20001) | CY | 26 | $201.60 | $100.00 | $70.00 | $50.00 | $100.00 |
| 2 | Monument assembly adjusted to grade (623E39500) | EACH | 2 | $500.00 | $650.00 | $2,500.00 | $1,000.00 | $1,000.00 |
| 3 | Topsoil (659E00300) | CY | 11 | $251.15 | $100.00 | $50.00 | $100.00 | $200.00 |
| 4 | Seeding and mulching (659E10000) | SY | 59 | $83.20 | $30.00 | $8.00 | $30.00 | $2.50 |
| 5 | Commercial fertilizer (659E20000) | TON | 0.01 | $640.00 | $1,500.00 | $5,000.00 | $1,250.00 | $1,400.00 |
| 6 | Lime (659E31000) | ACRE | 0.01 | $156.00 | $5.00 | $1,060.00 | $150.00 | $450.00 |
| 7 | Water (659E35000) | MGAL | 1 | $1.00 | $20.00 | $1.00 | $1.00 | $100.00 |
| 8 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 9 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 223 | $46.00 | $45.00 | $60.00 | $80.00 | $50.00 |
| 10 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 2,037 | $48.50 | $35.00 | $65.00 | $55.00 | $75.00 |
| 11 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 143 | $75.00 | $57.00 | $125.00 | $85.00 | $100.00 |
| 12 | Pavement planing, asphalt concrete, 1.25" (254E01000) | SY | 5,894 | $1.25 | $1.19 | $2.00 | $2.20 | $3.00 |
| 13 | Non-tracking tack coat (407E20000) | GAL | 7,931 | $2.50 | $3.00 | $3.50 | $2.80 | $3.50 |
| 14 | Asphalt concrete surface course, type 1, (446), as per plan (441E10101) | CY | 1,600 | $193.25 | $217.00 | $205.00 | $215.00 | $226.00 |
| 15 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 42 | $193.25 | $450.00 | $375.00 | $450.00 | $246.00 |
| 16 | Asphalt concrete, misc.: surface course, type 1, ( (441E90000) | CY | 1,578 | $217.50 | $242.00 | $215.00 | $260.00 | $228.00 |
| 17 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 28 | $350.00 | $425.00 | $350.00 | $500.00 | $248.00 |
| 18 | Compacted aggregate, as per plan (617E10101) | CY | 565 | $86.43 | $86.00 | $85.00 | $45.00 | $80.00 |
| 19 | Shoulder preparation (617E20000) | SY | 7,376 | $1.40 | $1.25 | $4.00 | $0.60 | $3.00 |
| 20 | Water (617E25000) | MGAL | 3 | $11.85 | $700.00 | $85.00 | $7.50 | $100.00 |
| 21 | Longitudinal joint preparation (874E21000) | MI | 6.12 | $1,500.00 | $2,500.00 | $950.00 | $5,000.00 | $2,500.00 |
| 22 | Pavement planing, asphalt concrete, class A, 0.75" (897E01010) | SY | 85,547 | $1.25 | $1.19 | $1.10 | $1.25 | $2.00 |
| 23 | Pavement planing, asphalt concrete, class A, 1.00" (897E01010) | SY | 695 | $1.25 | $1.19 | $4.80 | $3.50 | $20.00 |
| 24 | Pavement planing, asphalt concrete, class A, as per plan (897E01011) | SY | 1,226 | $1.25 | $1.19 | $3.00 | $10.00 | $10.00 |
| 25 | RPM (621E00100) | EACH | 489 | $34.00 | $34.00 | $34.00 | $34.00 | $40.46 |
| 26 | Raised pavement marker removed (621E54000) | EACH | 489 | $13.45 | $4.50 | $15.00 | $2.00 | $10.00 |
| 27 | Ground mounted support, no. 2 post (630E02100) | FT | 80 | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 28 | Ground mounted support, no. 3 post (630E03100) | FT | 56 | $24.00 | $15.50 | $15.50 | $15.50 | $15.50 |
| 29 | Sign, flat sheet (630E80100) | SF | 24 | $26.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 30 | Edge line, 6" (644E00104) | MI | 12.35 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 31 | Center line (644E00300) | MI | 6.15 | $3,286.00 | $3,286.00 | $3,286.00 | $3,286.00 | $3,286.00 |
| 32 | Channelizing line, 8" (644E00400) | FT | 187 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 33 | Stop line (644E00500) | FT | 48 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 34 | Lane arrow (644E01300) | EACH | 2 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 35 | Edge line, 6" (646E10010) | MI | 0.11 | $27,196 | $27,196 | $27,196 | $27,196 | $27,196 |
| 36 | Center line (646E10200) | MI | 0.06 | $49,858 | $49,858 | $49,858 | $49,858 | $49,858 |
| 37 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $75.00 | $92.00 | $95.00 | $125.00 | $125.00 |
| 38 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,400.00 | $2,400.00 | $2,550.00 | $3,200.00 | $2,400.00 |
| 39 | Work zone marking sign (614E12460) | EACH | 64 | $100.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 40 | Barrier reflector, type 1, one way (614E13310) | EACH | 15 | $14.00 | $14.00 | $12.00 | $14.00 | $14.00 |
| 41 | Object marker, two way (614E13360) | EACH | 15 | $18.00 | $18.00 | $16.00 | $20.00 | $18.00 |
| 42 | Work zone center line, class III, 642 paint (614E21550) | MI | 12.30 | $1,621.00 | $1,621.00 | $1,621.00 | $1,621.00 | $990.00 |
| 43 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 12.35 | $806.00 | $806.00 | $806.00 | $806.00 | $890.00 |
| 44 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 374 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 45 | Work zone stop line, class III, 642 paint (614E26610) | FT | 96 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 46 | Portable barrier, unanchored (622E41100) | FT | 670 | $26.00 | $26.00 | $35.00 | $18.00 | $26.00 |
| 47 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $8,500.00 | $9,250.00 | $8,500.00 | $4,162.50 | $8,500.00 |
| 48 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 32 | $20.00 | $15.00 | $20.00 | $29.71 | $20.00 |
| 49 | Railing, misc.: remove and reset bridge railing (517E76300) | FT | 25 | $245.00 | $120.00 | $50.00 | $127.50 | $80.00 |
| 50 | Special - steel drip strip (518E22300) | FT | 5 | $40.00 | $50.00 | $40.00 | $106.35 | $40.00 |
| 51 | Patching concrete structure, as per plan (519E11101) | SF | 12 | $200.00 | $500.00 | $200.00 | $539.00 | $200.00 |
| 52 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,183.40 | $5,000.00 | $5,003.20 | $5,800.00 | $6,800.00 |
| 53 | Maintaining traffic (614E11000) | LS | 1 | $30,363 | $50,000 | $56,000 | $63,563 | $57,500 |
| 54 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $3,000.00 | $10,500 | $2,500.00 | $3,500.00 | $2,500.00 |
| 55 | Mobilization (624E10000) | LS | 1 | $24,052 | $40,000 | $28,500 | $70,000 | $24,300 |
| 100 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 6 | $30.00 | $40.00 | $30.00 | $134.30 | $30.00 |
| 101 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 4 | $72.00 | $150.00 | $72.00 | $92.48 | $72.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.