Fillmore Construction: ODOT bid record

Fillmore Construction submitted 131 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 42 of them (32%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$49,918,202
Latest bid
12 NOV 2026
Data through
12 NOV 2026
131Bids
42Low bids
32Win rate, percent
+15%Median gap to the low bid when not low, 89 bids

By year

YearBidsLow bidsWin rate
202016213%
202114214%
202212758%
20238338%
202419737%
2025341029%
2026281139%
Fillmore Construction, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CLI14536%
ROS14429%
HIG11545%
SCI9222%
JAC9444%
CLE7343%
GRE6350%
PIK6233%
BRO5120%
FAY5120%
WAR5360%
HAM4125%
Fillmore Construction, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH103102 (99%)$1.00$1.00
Water659E35000MGAL8644 (51%)$1.00$1.00
Non-tracking tack coat407E20000GAL7736 (47%)$4.00$3.25
Asphalt concrete base, PG64-22, (449)301E56000CY4833 (69%)$240.00$300.00
Aggregate base304E20000CY7332 (44%)$100.00$90.00
Pavement removed202E23000SY5931 (53%)$10.00$17.00
Seeding and mulching659E10000SY7828 (36%)$2.00$2.60
Asphalt concrete surface course, type 1, (449), PG64-22441E70000CY5027 (54%)$275.00$395.00
Stop line644E00500FT4627 (59%)$10.00$8.29
RPM621E00100EACH5824 (41%)$66.42$52.92
Sign, flat sheet630E80100SF4222 (52%)$24.36$24.00
Proof rolling204E45000HR2720 (74%)$150.00$219.05
Fillmore Construction, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Fillmore Construction, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260492CLACLA-LMT Culvert Replacement (CULVERT REPLACEMENT)1 of 3$197,783Low, 9.0% under the second
12 NOV 2026260509SCISCI-US 52-13.33 (CULVERT REPLACEMENT)4 of 5$886,623+23%
12 NOV 2026260524WARWAR-IR 71 Rest Areas TP (PARKING AREAS)2 of 7$13,897,132+2.0%
15 OCT 2026260472ROSROS-SR 159-03.47 (TWO LANE RESURFACING)1 of 3$2,378,318Low, 4.0% under the second
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)1 of 7$646,674Low, 1.0% under the second
01 OCT 2026260439WARWAR-SR 73-01.49 S Main St Resurf (TWO LANE RESURFACING)1 of 3$891,840Low, 4.0% under the second
17 SEP 2026260407HIGHIG-US 62-00.00 (TWO LANE RESURFACING)3 of 4$2,388,715+15%
17 SEP 2026260409JACJAC-SR 93-17.42 (TWO LANE RESURFACING)2 of 2$2,239,434+10%
17 SEP 2026260413VINVIN-SR 160/SR 349-03.92/00.00 (TWO LANE RESURFACING)2 of 2$5,653,894+5.0%
27 AUG 2026260381CLECLE-SR 125-14.08 (SIDEWALK)2 of 5$978,411+1.0%
27 AUG 2026260385HOCHOC-/VIN-SR 327-00.00/06.88 (TWO LANE RESURFACING)2 of 2$3,692,781+6.0%
30 JUL 2026260347FAYFAY-US 22-00.00, FAY-US 62-00.00 / VAR (FOUR LANE RESURFACING)2 of 2$8,765,720+16%
30 JUL 2026260351HIGHIG-SR 136-00.00 (TWO LANE RESURFACING)3 of 4$1,760,999+29%
25 JUN 2026260305BROBRO-Riverfront East Paving (MINOR RECONSTRUCTION)1 of 5$378,589Low, 3.0% under the second
21 MAY 2026260274SCISCI-SR 335-02.04 (TWO LANE RESURFACING)2 of 2$1,387,346+3.0%
21 MAY 2026268010District 8D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION)2 of 5$2,196,687+7.0%
07 MAY 2026260247ROSROS-SR 207-08.31 (CULVERT REPLACEMENT)2 of 4$416,797+21%
23 APR 2026260210MOTMOT-Old N. Dayton Trail, Seg 2 (BIKEWAYS)2 of 5$1,097,584+1.0%
23 APR 2026260213ROSROS-SR 180-02.11 (CULVERT REPLACEMENT)1 of 6$1,188,876Low, 5.0% under the second
23 APR 2026260222ROSROS-Tar Hollow SF PV (SPOT PATCHING / PAVEMENT REPAIR)1 of 5$278,815Low, 11% under the second
23 APR 2026260224VINVIN-Tar Hollow Culvert (CULVERT REPLACEMENT)6 of 6$488,980+22%
23 APR 2026260225WARWAR-Central Greenway SUP Seg D (BIKEWAYS)1 of 5$697,462Low, 2.0% under the second
12 MAR 2026260127MADMAD-US 42-07.14,MAD-SR 38-12.40/31.74 (TWO LANE RESURFACING)1 of 5$1,276,732Low, 12% under the second
12 MAR 2026268002LAWLAW-SR 7-13.63 (CULVERT REPLACEMENT)1 of 4$228,621Low, 40% under the second
19 FEB 2026260089MOTMOT-GMR Trail IMP CR22A (BIKEWAYS)2 of 4$367,505+14%
Fillmore Construction: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy