ODOT letting results, May 7, 2026
37 contracts let by Ohio DOT on May 7, 2026, $176,376,437 in low bids, a median of 3 bidders per contract. On the 37 with an engineer's estimate, the low bid came in under it 15 times; median low bid +2.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 37
- Low bids, total
- $176,376,437
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260251 | MOT-/WAR-IR 75-11.56/00.00 (MAJOR RECONSTRUCTION) | MOT | 2 | John R Jurgensen Company | $55,097,195 | $66,470,000 | +21% | -7.0% | ODOT |
| 260167 | ERI-US 6-Connectivity Corrid. (MAJOR RECONSTRUCTION) | ERI | 3 | Great Lakes Demolition Company | $30,841,629 | $33,149,790 | +7.0% | +6.0% | ODOT |
| 260237 | FRA-US 33-21.71 at Petzinger Rd (INTERCHANGE) | FRA | 2 | Shelly & Sands Inc | $22,952,980 | $23,865,192 | +4.0% | +9.0% | ODOT |
| 260227 | AUG-US 33-15.65 (INTERCHANGE) | AUG | 3 | Helms and Sons Excavating | $7,877,770 | $8,285,516 | +5.0% | +1.0% | ODOT |
| 260248 | SAN-US 20-20.80 roundabout (INTERSECTION) | SAN | 3 | Great Lakes Demolition Company | $7,215,189 | $7,675,758 | +6.0% | -5.0% | ODOT |
| 260242 | JEF-SR 7-13.95 (MISCELLANEOUS) | JEF | 3 | Marucci & Gaffney Excavating Co | $5,873,591 | $7,827,875 | +33% | +50% | ODOT |
| 260239 | HAR-US 68/SR 31 Roundabout (INTERSECTION) | HAR | 3 | Eagle Bridge Co | $3,596,050 | $3,651,725 | +2.0% | -3.0% | ODOT |
| 260231 | CUY-IR 77-10.08 (FOUR LANE RESURFACING) | CUY | 2 | Karvo Companies Inc | $3,275,271 | $3,372,288 | +3.0% | +18% | ODOT |
| 260240 | HUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE)) | HUR | 3 | Rietschlin Construction Inc | $3,170,138 | $3,743,850 | +18% | -5.0% | ODOT |
| 260254 | WIL-SR 34-00.00 Resurfacing (TWO LANE RESURFACING) | WIL | 1 | Gerken Paving Inc | $2,887,358 | +11% | ODOT | ||
| 260252 | WAS-SR 26-00.16 Acme St (SIDEWALK) | WAS | 2 | Alan Stone Co Inc | $2,616,487 | $2,645,332 | +1.0% | +24% | ODOT |
| 260243 | MIA-CR 15-05.57 BH (BRIDGE REPAIR) | MIA | 4 | Eagle Bridge Co | $2,560,670 | $2,983,683 | +17% | 0.0% | ODOT |
| 260226 | ALL-SR 117-10.78 (INTERSECTION) | ALL | 3 | Fenson Contracting LLC | $2,424,191 | $2,534,904 | +5.0% | -4.0% | ODOT |
| 268008 | HAM-CR 128/CR 161 Roundabout (INTERSECTION) | HAM | 4 | Sunesis Construction Co | $2,342,902 | $2,400,809 | +2.0% | +15% | ODOT |
| 260253 | WAY-SR 94-18.21 (INTERSECTION) | WAY | 3 | Shelly & Sands Inc | $2,062,603 | $2,071,427 | 0.0% | -8.0% | ODOT |
| 260238 | HAM-Columbia Connector (BIKEWAYS) | HAM | 3 | Sunesis Construction Co | $2,009,547 | $2,172,181 | +8.0% | +1.0% | ODOT |
| 260232 | CUY-Memorial Bridges Loop Trail (BIKEWAYS) | CUY | 3 | Perk Company Inc | $1,924,944 | $2,008,550 | +4.0% | +3.0% | ODOT |
| 260229 | CHP-US 68-01.27 (TWO LANE RESURFACING) | CHP | 3 | Shelly Company | $1,679,378 | $1,780,955 | +6.0% | +7.0% | ODOT |
| 260228 | CAR-Grant St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE)) | CAR | 2 | Sunesis Construction Co | $1,628,262 | $1,823,447 | +12% | +2.0% | ODOT |
| 260256 | D04-SP FY2026 (West) (SPOT PATCHING / PAVEMENT REPAIR) | District 4 | 2 | Karvo Companies Inc | $1,427,574 | $1,716,427 | +20% | +22% | ODOT |
| 260261 | MIA-SR 571/SR 718-VAR/07.62 (MISCELLANEOUS) | MIA | 2 | Brumbaugh Construction Inc | $1,394,852 | $1,437,236 | +3.0% | +20% | ODOT |
| 260260 | LUC-US 24 24.98 Bridge Repair (BRIDGE REPAIR) | LUC | 1 | Miller Bros Const Inc | $1,269,616 | -9.0% | ODOT | ||
| 260212 | PRE-SR 726-02.74 (BRIDGE REPLACEMENT (1 BRIDGE)) | PRE | 5 | Brumbaugh Construction Inc | $1,215,000 | $1,258,050 | +4.0% | -24% | ODOT |
| 260241 | JEF-Reese St Bridge (CULVERT REPLACEMENT) | JEF | 1 | R C Construction Company and Son Inc | $1,199,361 | +12% | ODOT | ||
| 260245 | POR-SR 261-03.51 (TWO LANE RESURFACING) | POR | 6 | Shelly Company | $1,035,990 | $1,040,637 | 0.0% | -10% | ODOT |
| 260233 | CUY-Old Detroit Rd Bridge Rehab (MISCELLANEOUS) | CUY | 3 | Catts Construction Inc | $947,053 | $958,463 | +1.0% | -27% | ODOT |
| 260250 | TUS-Port Washington Sidewalks (SIDEWALK) | TUS | 3 | Ruhlin Company | $921,933 | $996,820 | +8.0% | +7.0% | ODOT |
| 260235 | CUY-SR 8-00.52 Pedestrian (SIDEWALK) | CUY | 6 | R M H Concrete & Foundations Inc | $899,183 | $914,474 | +2.0% | -12% | ODOT |
| 260234 | CUY-South Park Shared Use Path (BIKEWAYS) | CUY | 5 | Protect-A-Cote | $769,815 | $814,857 | +6.0% | +6.0% | ODOT |
| 260249 | SCI-/ROS-SR 73/US 50-10.63/19.26 (BRIDGE REPAIR) | SCI | 4 | BCC Ohio Inc | $670,731 | $732,900 | +9.0% | -19% | ODOT |
| 260255 | CLA-/MOT BH FY27 (BRIDGE REPAIR) | CLA | 3 | Ruhlin Company | $636,706 | $936,710 | +47% | -27% | ODOT |
| 260259 | FRA-IR 70-09.72 Damage Repair (BRIDGE REPAIR) | FRA | 2 | Vimas Painting Company Inc | $396,029 | $425,486 | +7.0% | +20% | ODOT |
| 260247 | ROS-SR 207-08.31 (CULVERT REPLACEMENT) | ROS | 4 | Axis Civil Construction LLC | $343,332 | $416,797 | +21% | -25% | ODOT |
| 260258 | D12-TSG FY2026 (SIGNALIZATION) | District 12 | 3 | Perram Electric Inc | $339,750 | $414,000 | +22% | +9.0% | ODOT |
| 260236 | FRA-SR 317/Williams Rd (INTERSECTION) | FRA | 3 | Shelly & Sands Inc | $338,338 | $353,191 | +4.0% | +8.0% | ODOT |
| 264012 | RIC-US 42-(06.01)(06.02) (CULVERT REPLACEMENT) | RIC | 2 | Eius Company | $312,796 | $361,843 | +16% | +6.0% | ODOT |
| 260244 | MUS-SR 555-02.09 (SLIDE REPAIR) | MUS | 7 | Buds Inc | $222,222 | $252,469 | +14% | -22% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.