ODOT contract 260227 bid tabulation
AUG-US 33-15.65 (INTERCHANGE). Let by Ohio DOT on May 7, 2026, AUG. 3 bids received; low bid $7,877,770 by Helms and Sons Excavating, +0.6% against the engineer's estimate of $7,830,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 179
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Helms and Sons Excavating | $7,877,770 | Low | +1.0% |
| 2 | Eagle Bridge Co | $8,285,516 | +5.0% | +6.0% |
| 3 | R B Jergens Contractors Inc | $9,121,040 | +16% | +16% |
Engineer's estimate: $7,830,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Helms and Sons Excavating | 2. Eagle Bridge Co | 3. R B Jergens Contractors Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $13,000 | $15,000 | $54,177 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $350.00 | $500.00 | $822.65 |
| 3 | Pavement removed (202E23000) | SY | 35,666 | $7.50 | $10.00 | $10.15 |
| 4 | Concrete barrier removed (202E30700) | FT | 602 | $19.00 | $30.00 | $11.53 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 1,205 | $42.00 | $15.00 | $50.25 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 231 | $16.00 | $30.00 | $55.24 |
| 7 | Guardrail removed (202E38000) | FT | 1,704 | $2.25 | $3.00 | $3.16 |
| 8 | Impact attenuator removed (202E47800) | EACH | 1 | $325.00 | $250.00 | $263.59 |
| 9 | Catch basin removed (202E58100) | EACH | 11 | $320.00 | $300.00 | $700.62 |
| 10 | Inlet removed (202E58200) | EACH | 1 | $450.00 | $850.00 | $1,362.50 |
| 11 | Removal misc.:, delineator (202E98100) | EACH | 4 | $120.00 | $15.00 | $1,604.51 |
| 12 | Removal misc.:, hydro excavation (202E98100) | EACH | 1 | $1,800.00 | $4,000.00 | $2,899.48 |
| 13 | Excavation (203E10000) | CY | 11,674 | $15.00 | $15.00 | $18.56 |
| 14 | Embankment (203E20000) | CY | 12,477 | $3.00 | $14.00 | $12.10 |
| 15 | Subgrade compaction (204E10000) | SY | 26,215 | $1.00 | $2.00 | $2.12 |
| 16 | Excavation of subgrade (204E13000) | CY | 616 | $16.00 | $13.00 | $34.51 |
| 17 | Granular material, type B (204E30010) | CY | 616 | $41.00 | $65.00 | $73.35 |
| 18 | Proof rolling (204E45000) | HR | 15 | $160.00 | $250.00 | $348.02 |
| 19 | Geotextile fabric (204E50000) | SY | 1,867 | $1.50 | $2.25 | $4.20 |
| 20 | Guardrail, type MGS (606E15050) | FT | 1,825 | $24.00 | $22.00 | $23.20 |
| 21 | Rounded end section (606E20050) | EACH | 1 | $100.00 | $70.00 | $73.80 |
| 22 | Anchor assembly, MGS type E (606E26150) | EACH | 6 | $3,000.00 | $2,700.00 | $2,846.76 |
| 23 | Anchor assembly, MGS type T (606E26550) | EACH | 8 | $1,600.00 | $1,250.00 | $1,317.95 |
| 24 | Combination curb and gutter, type 2 (609E12000) | FT | 844 | $32.00 | $38.00 | $33.51 |
| 25 | Curb, type 4-A (609E24000) | FT | 245 | $26.00 | $12.00 | $20.74 |
| 26 | Curb, type 6 (609E26000) | FT | 1,780 | $26.00 | $18.00 | $20.13 |
| 27 | Combination curb and gutter, type 9 (609E31000) | FT | 1,005 | $32.00 | $35.00 | $29.56 |
| 28 | Curb, misc.: combination curb and gutter turnout (609E98100) | EACH | 6 | $800.00 | $500.00 | $2,642.66 |
| 29 | Inlet, misc.: barrier window opening, jersey shape (611E99500) | EACH | 1 | $10,000 | $12,500 | $3,342.81 |
| 30 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 50 | $75.00 | $150.00 | $58.89 |
| 31 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 233 | $78.00 | $70.00 | $91.15 |
| 32 | Rock channel protection, type C without filter (601E34200) | CY | 5 | $162.00 | $200.00 | $192.67 |
| 33 | Soil analysis test (659E00100) | EACH | 2 | $75.00 | $300.00 | $73.80 |
| 34 | Topsoil (659E00300) | CY | 5,916 | $24.00 | $5.00 | $44.74 |
| 35 | Seeding and mulching (659E10000) | SY | 42,532 | $1.20 | $1.50 | $1.08 |
| 36 | Repair seeding and mulching (659E14000) | SY | 2,127 | $1.20 | $4.00 | $1.08 |
| 37 | Inter-seeding (659E15000) | SY | 2,127 | $1.00 | $4.00 | $0.84 |
| 38 | Commercial fertilizer (659E20000) | TON | 5.93 | $900.00 | $2,000.00 | $896.20 |
| 39 | Lime (659E31000) | ACRE | 8.79 | $38.00 | $1.00 | $36.90 |
| 40 | Water (659E35000) | MGAL | 235 | $1.20 | $10.00 | $1.05 |
| 41 | Mowing (659E40000) | MSF | 96 | $11.00 | $10.00 | $10.54 |
| 42 | Vegetated swale erosion protection (670E00200) | SY | 10,752 | $1.90 | $3.00 | $1.90 |
| 43 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,800.00 | $4,500.00 | $3,057.63 |
| 44 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $45,000 | $30,000 | $31,631 |
| 45 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $25,000 | $25,000 | $23,196 |
| 46 | Erosion control (832E30000) | EACH | 167,032 | $1.00 | $1.00 | $1.00 |
| 47 | Concrete masonry (602E20000) | CY | 6.89 | $3,300.00 | $2,750.00 | $3,940.62 |
| 48 | 4" unclassified pipe underdrains (605E05200) | FT | 100 | $9.00 | $10.00 | $33.03 |
| 49 | 4" base pipe underdrains (605E06000) | FT | 21,529 | $9.00 | $9.00 | $22.18 |
| 50 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 1,624 | $40.00 | $16.00 | $31.93 |
| 51 | 12" conduit, type B (611E04400) | FT | 339 | $54.00 | $80.00 | $112.35 |
| 52 | 15" conduit, type B (611E05900) | FT | 624 | $88.00 | $90.00 | $136.10 |
| 53 | 18" conduit, type A (611E07200) | FT | 179 | $121.00 | $150.00 | $162.93 |
| 54 | 21" conduit, type A (611E08700) | FT | 42 | $150.00 | $200.00 | $272.15 |
| 55 | 30" conduit, type A, 706.02 (611E13200) | FT | 65 | $194.00 | $205.00 | $241.91 |
| 56 | 36" conduit, type B (611E16400) | FT | 231 | $175.00 | $225.00 | $296.07 |
| 57 | 14" X 23" conduit, type A, 706.04 (611E52200) | FT | 28 | $195.00 | $350.00 | $244.03 |
| 58 | Catch basin, no. 5 (611E98300) | EACH | 4 | $8,300.00 | $5,500.00 | $4,276.54 |
| 59 | Catch basin, no. 6 (611E98370) | EACH | 2 | $6,200.00 | $3,250.00 | $3,274.33 |
| 60 | Catch basin, no. 2-2B (611E98470) | EACH | 3 | $2,700.00 | $2,250.00 | $2,411.47 |
| 61 | Catch basin adjusted to grade (611E98630) | EACH | 1 | $600.00 | $750.00 | $929.06 |
| 62 | Precast reinforced concrete outlet (611E99710) | EACH | 25 | $550.00 | $225.00 | $791.77 |
| 63 | Pavement planing, asphalt concrete (depth varies) (254E01000) | SY | 15,078 | $6.00 | $5.00 | $5.34 |
| 64 | Pavement planing, asphalt concrete, 1.5" depth (254E01000) | SY | 998 | $4.50 | $3.40 | $3.63 |
| 66 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 7,551 | $192.00 | $220.00 | $235.03 |
| 67 | Aggregate base (304E20000) | CY | 4,722 | $47.00 | $75.00 | $68.00 |
| 68 | Non-tracking tack coat (407E20000) | GAL | 790 | $2.50 | $4.00 | $4.27 |
| 69 | Stabilized crushed aggregate (411E10000) | CY | 28 | $70.00 | $150.00 | $103.18 |
| 70 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 16 | $330.00 | $350.00 | $373.92 |
| 71 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 22 | $280.00 | $375.00 | $400.62 |
| 72 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 1,420 | $285.00 | $315.00 | $336.52 |
| 73 | Asphalt concrete surface course, 12.5 MM, type A (448), as per plan (442E20001) | CY | 136 | $330.00 | $370.00 | $395.28 |
| 74 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 1,764 | $268.00 | $290.00 | $309.82 |
| 75 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 892 | $82.00 | $65.00 | $99.69 |
| 76 | 8" non-reinforced concrete pavement, class QC 1P, as per plan (452E12011) | SY | 843 | $132.00 | $100.00 | $132.04 |
| 77 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 1.87 | $4,100.00 | $7,500.00 | $5,638.27 |
| 78 | Connection, fused pull apart (625E00450) | EACH | 22 | $157.00 | $98.66 | $104.02 |
| 79 | Connection, unfused permanent (625E00480) | EACH | 57 | $157.00 | $35.56 | $37.49 |
| 80 | Light tower, BBBB100 (625E13200) | EACH | 7 | $41,500 | $38,553 | $40,648 |
| 81 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 11 | $3,300.00 | $1,750.00 | $1,845.12 |
| 82 | Light tower foundation, 36" X 20' deep (625E15100) | EACH | 7 | $12,500 | $8,500.00 | $8,962.03 |
| 83 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 6,542 | $5.50 | $3.28 | $3.46 |
| 84 | No. 10 AWG pole and bracket cable (625E23400) | FT | 660 | $2.50 | $0.60 | $0.63 |
| 85 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 3,974 | $17.50 | $15.75 | $16.61 |
| 86 | Conduit, 3", 725.04 (625E25500) | FT | 1,876 | $39.50 | $27.44 | $28.93 |
| 87 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 383 | $74.00 | $50.00 | $52.72 |
| 88 | Luminaire, conventional, solid state (LED), type I (625E26252) | EACH | 11 | $640.00 | $383.64 | $404.49 |
| 89 | Luminaire, high mast, solid state (LED), type V, 5 (625E26262) | EACH | 28 | $1,950.00 | $2,028.86 | $2,139.14 |
| 90 | Trench (625E29000) | FT | 4,934 | $17.50 | $16.50 | $17.40 |
| 91 | Pull box, 725.08, 18" (625E30700) | EACH | 16 | $1,500.00 | $802.61 | $846.24 |
| 92 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,900.00 | $1,046.88 | $1,103.78 |
| 93 | Ground rod (625E32000) | EACH | 25 | $375.00 | $135.00 | $142.34 |
| 94 | Power service, as per plan (625E34001) | EACH | 1 | $13,500 | $7,500.00 | $7,907.67 |
| 95 | Underground warning marking tape (625E36010) | FT | 4,934 | $3.50 | $1.63 | $1.72 |
| 96 | Arc flash calculations and label lighting control (625E76000) | EACH | 1 | $4,200.00 | $1,250.00 | $1,317.95 |
| 97 | RPM (621E00100) | EACH | 189 | $63.00 | $43.00 | $45.34 |
| 98 | Ground mounted support, no. 3 post (630E03100) | FT | 1,086 | $17.00 | $15.00 | $15.82 |
| 99 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 25 | $42.00 | $22.50 | $23.72 |
| 100 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 46 | $74.00 | $48.00 | $50.61 |
| 101 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 37 | $49.00 | $28.50 | $30.05 |
| 102 | Breakaway structural beam connection (630E09000) | EACH | 6 | $785.00 | $600.00 | $632.61 |
| 103 | Overhead sign support, type TC-15.115 (630E66500) | EACH | 1 | $68,000 | $55,000 | $57,990 |
| 104 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 1 | $55,000 | $41,000 | $43,229 |
| 105 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $106,200 | $90,000 | $94,892 |
| 106 | Overhead sign support, type TC-16.22, design 12 (630E72540) | EACH | 1 | $24,000 | $16,500 | $17,397 |
| 107 | Sign, flat sheet (630E80100) | SF | 1,259 | $19.00 | $26.00 | $27.41 |
| 108 | Sign, overhead extrusheet (630E80224) | SF | 928 | $27.00 | $28.70 | $30.26 |
| 109 | Ground mounted structural beam support foundation (630E84500) | EACH | 6 | $950.00 | $1,225.00 | $1,291.59 |
| 110 | Rigid overhead sign support foundation (630E84510) | EACH | 6 | $11,500 | $11,500 | $12,125 |
| 111 | Removal of ground mounted sign and disposal (630E84900) | EACH | 91 | $16.00 | $21.50 | $22.67 |
| 112 | Removal of ground mounted post support and disposal (630E86002) | EACH | 106 | $21.00 | $21.50 | $22.67 |
| 113 | Edge line, 6" (644E00104) | MI | 4 | $3,500.00 | $3,300.00 | $3,479.38 |
| 114 | Edge line, 6" (644E00104) | MI | 7 | $3,500.00 | $3,300.00 | $3,479.38 |
| 115 | Center line (644E00300) | MI | 3 | $4,700.00 | $4,300.00 | $4,533.73 |
| 116 | Center line (644E00300) | MI | 1 | $4,700.00 | $4,300.00 | $4,533.73 |
| 117 | Channelizing line, 12" (644E00404) | FT | 4,127 | $2.00 | $1.90 | $2.00 |
| 118 | Stop line (644E00500) | FT | 38 | $7.50 | $7.00 | $7.38 |
| 119 | Transverse/diagonal line (644E00700) | FT | 295 | $7.50 | $7.00 | $7.38 |
| 120 | Transverse/diagonal line (644E00700) | FT | 631 | $7.50 | $7.00 | $7.38 |
| 121 | Chevron marking (644E00720) | FT | 261 | $7.50 | $7.00 | $7.38 |
| 122 | Lane arrow (644E01300) | EACH | 20 | $130.00 | $120.00 | $126.52 |
| 123 | Dotted line, 6" (644E01510) | FT | 1,006 | $2.00 | $1.60 | $1.69 |
| 124 | Yield line (644E20800) | FT | 369 | $7.50 | $7.00 | $7.38 |
| 125 | Rock channel protection, type D with geotextile fabric, as per plan (601E32305) | CY | 253 | $140.00 | $150.00 | $115.96 |
| 126 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $55.00 | $110.00 | $131.79 |
| 127 | Increased barrier delineation (614E11630) | FT | 9,260 | $2.00 | $1.00 | $1.93 |
| 128 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 5 | $2,200.00 | $2,100.00 | $2,116.01 |
| 129 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,400.00 | $2,250.00 | $2,368.73 |
| 130 | Detour signing (614E12420) | LS | 1 | $19,500 | $25,000 | $18,583 |
| 131 | Work zone increased penalties sign (614E12484) | EACH | 16 | $196.00 | $180.00 | $188.67 |
| 132 | Replacement sign (614E12500) | EACH | 5 | $208.00 | $190.00 | $199.99 |
| 133 | Replacement drum (614E12600) | EACH | 50 | $60.00 | $65.00 | $57.99 |
| 134 | Work zone crossover lighting system (614E12756) | EACH | 1 | $76,000 | $50,000 | $52,718 |
| 135 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 95 | $64.00 | $8.00 | $28.62 |
| 136 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $301.00 | $550.00 | $72.65 |
| 137 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 153 | $13.00 | $16.50 | $13.02 |
| 138 | Barrier reflector, type 1, one-way (614E13310) | EACH | 195 | $13.00 | $16.00 | $12.03 |
| 139 | Barrier reflector, type 3, bidirectional (614E13314) | EACH | 6 | $14.00 | $16.50 | $13.61 |
| 140 | Object marker, one way (614E13350) | EACH | 107 | $24.00 | $22.00 | $22.92 |
| 141 | Object marker, two way (614E13360) | EACH | 92 | $24.00 | $23.00 | $22.92 |
| 142 | Maintaining traffic, misc.: temporary lighting (614E18000) | EACH | 1 | $49,000 | $28,500 | $30,049 |
| 143 | Portable changeable message sign, as per plan (614E18601) | SNMT | 65 | $1,000.00 | $600.00 | $971.66 |
| 144 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 0.16 | $2,200.00 | $1,800.00 | $1,897.81 |
| 145 | Work zone lane line, class I, 4", 740.06, type I (614E20200) | MI | 0.16 | $7,700.00 | $7,136.00 | $7,523.88 |
| 146 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 0.16 | $1,100.00 | $900.00 | $948.94 |
| 147 | Work zone center line, class I (614E21000) | MI | 0.02 | $3,300.00 | $1,200.00 | $1,265.00 |
| 148 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.72 | $2,750.00 | $1,200.00 | $1,265.24 |
| 149 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.72 | $2,750.00 | $1,200.00 | $1,265.24 |
| 150 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 8.18 | $3,500.00 | $2,650.00 | $2,794.04 |
| 151 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 10.88 | $850.00 | $870.00 | $917.29 |
| 152 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 10.88 | $850.00 | $890.00 | $938.38 |
| 153 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 1,027 | $2.50 | $2.00 | $2.11 |
| 154 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 3,691 | $1.50 | $1.00 | $1.05 |
| 155 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 3,691 | $1.50 | $1.00 | $1.05 |
| 156 | Work zone dotted line, class I (614E24000) | FT | 1,634 | $1.50 | $1.00 | $1.05 |
| 157 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 836 | $1.50 | $1.00 | $1.05 |
| 158 | Work zone transverse/diagonal line, class I (614E25000) | FT | 100 | $3.00 | $7.00 | $7.38 |
| 159 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 641 | $3.00 | $7.00 | $7.38 |
| 160 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 641 | $3.00 | $7.00 | $7.38 |
| 161 | Work zone stop line, class I (614E26000) | FT | 101 | $4.50 | $9.00 | $9.49 |
| 162 | Work zone stop line, class III, 642 paint (614E26610) | FT | 38 | $4.50 | $9.00 | $9.49 |
| 163 | Work zone gore marking, class II (614E28000) | FT | 72 | $3.50 | $9.00 | $9.49 |
| 164 | Work zone arrow, class I (614E30000) | EACH | 22 | $52.00 | $55.00 | $57.99 |
| 165 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 20 | $52.00 | $55.00 | $57.99 |
| 166 | Roads for maintaining traffic (615E10000) | LS | 1 | $22,000 | $50,000 | $93,726 |
| 167 | Pavement for maintaining traffic, class A (615E20000) | SY | 1,589 | $67.00 | $110.00 | $72.65 |
| 168 | Water (616E10000) | MGAL | 47 | $25.00 | $25.00 | $151.46 |
| 169 | Rumble strips, shoulder (asphalt concrete), as per plan (618E40101) | FT | 6,450 | $5.00 | $8.20 | $8.65 |
| 170 | Portable barrier, 50", as per plan (622E41011) | FT | 4,610 | $34.00 | $30.00 | $32.96 |
| 171 | Portable barrier, unanchored (622E41100) | FT | 5,740 | $25.00 | $20.00 | $24.87 |
| 172 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 44 | $750.00 | $550.00 | $741.81 |
| 173 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 6 | $2,100.00 | $2,000.00 | $2,031.97 |
| 174 | Portable changeable message sign, as per plan (896E00021) | SNMT | 6 | $1,200.00 | $925.00 | $971.66 |
| 175 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $40,500 | $100,000 | $26,359 |
| 176 | CPM progress schedule (108E10000) | LS | 1 | $14,000 | $15,000 | $15,815 |
| 177 | Maintaining traffic (614E11000) | LS | 1 | $185,000 | $370,000 | $431,741 |
| 178 | Field office, type B (619E16010) | MNTH | 18 | $11,000 | $3,000.00 | $1,897.84 |
| 179 | Construction layout stakes and surveying (623E10000) | LS | 1 | $66,000 | $65,000 | $89,620 |
| 180 | Mobilization (624E10000) | LS | 1 | $372,000 | $412,500 | $204,574 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.