Eagle Bridge Co: ODOT bid record
Eagle Bridge Co submitted 201 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 56 of them (28%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $244,920,705
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 35 | 8 | 23% |
| 2021 | 36 | 7 | 19% |
| 2022 | 31 | 9 | 29% |
| 2023 | 21 | 6 | 29% |
| 2024 | 25 | 9 | 36% |
| 2025 | 25 | 7 | 28% |
| 2026 | 28 | 10 | 36% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HAM | 20 | 6 | 30% |
| MOT | 17 | 7 | 41% |
| BUT | 13 | 3 | 23% |
| GRE | 12 | 5 | 42% |
| PRE | 9 | 3 | 33% |
| HAN | 8 | 3 | 38% |
| District 7 | 8 | 1 | 13% |
| MIA | 8 | 5 | 63% |
| AUG | 8 | 1 | 13% |
| WAR | 7 | 3 | 43% |
| MAD | 6 | 2 | 33% |
| MER | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 193 | 193 (100%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 177 | 89 (50%) | $26.50 | $34.00 |
| Topsoil | 659E00300 | CY | 132 | 85 (64%) | $15.00 | $45.00 |
| Lime | 659E31000 | ACRE | 95 | 82 (86%) | $10.00 | $150.00 |
| Non-tracking tack coat | 407E20000 | GAL | 119 | 70 (59%) | $3.00 | $3.25 |
| Guardrail removed | 202E38000 | FT | 120 | 58 (48%) | $3.00 | $2.50 |
| Guardrail, type MGS | 606E15050 | FT | 97 | 54 (56%) | $21.50 | $22.73 |
| Tack coat | 407E10000 | GAL | 86 | 53 (62%) | $3.00 | $3.25 |
| Sign, flat sheet | 630E80100 | SF | 90 | 52 (58%) | $20.00 | $24.00 |
| Field painting structural steel, intermediate coat | 514E00060 | SF | 62 | 51 (82%) | $4.00 | $3.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 93 | 50 (54%) | $20.00 | $23.50 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 86 | 50 (58%) | $15.02 | $15.20 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Complete General Construction Company | 136 | 44 of 136 |
| Sunesis Construction Co | 84 | 20 of 84 |
| Brumbaugh Construction Inc | 49 | 28 of 49 |
| Miller Bros Const Inc | 45 | 19 of 45 |
| John R Jurgensen Company | 39 | 10 of 39 |
| Double Z Construction Company | 28 | 16 of 28 |
| Shelly & Sands Inc | 26 | 15 of 26 |
| BCC Ohio Inc | 25 | 21 of 25 |
| Prus Construction Company | 20 | 6 of 20 |
| Great Lakes Construction Co | 20 | 8 of 20 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260497 | District 1 | D01-OL FY27 (BRIDGE REPAIR) | 3 of 4 | $1,375,503 | +11% |
| 12 NOV 2026 | 260524 | WAR | WAR-IR 71 Rest Areas TP (PARKING AREAS) | 3 of 7 | $14,385,089 | +6.0% |
| 29 OCT 2026 | 260461 | HAM | HAM-IR 275-11.40 (SLIDE REPAIR) | 4 of 5 | $3,183,832 | +15% |
| 29 OCT 2026 | 260469 | MOT | MOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $1,523,584 | +17% |
| 29 OCT 2026 | 260471 | MOT | MOT-SR 835-02.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $5,570,980 | Low, 6.0% under the second |
| 29 OCT 2026 | 260475 | WOO | WOO-IR 75-13.83 Deck Replacement (BRIDGE REPAIR) | 1 of 3 | $2,769,748 | Low, 9.0% under the second |
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 7 | $1,044,336 | +10% |
| 01 OCT 2026 | 260425 | HAM | HAM-IR 71-02.26/02.94/03.44 (BRIDGE REPAIR) | 3 of 5 | $5,856,276 | +3.0% |
| 01 OCT 2026 | 260430 | MOT | MOT-GMR Trail IMP CR22B (BIKEWAYS) | 2 of 8 | $1,697,752 | +3.0% |
| 01 OCT 2026 | 260440 | AUG | AUG-US 33 Rest Areas TP (PARKING AREAS) | 2 of 5 | $6,610,153 | +2.0% |
| 01 OCT 2026 | 260450 | SHE | SHE-SR 119-03.60 (BRIDGE REPAIR) | 3 of 4 | $541,982 | +5.0% |
| 01 OCT 2026 | 268018 | DEL | DEL-US 42-12.63 (CULVERT REPLACEMENT) | 4 of 4 | $523,586 | +28% |
| 27 AUG 2026 | 260379 | BUT | BUT-SR 129-09.09/09.20 (BRIDGE REPAIR) | 2 of 5 | $717,735 | +13% |
| 30 JUL 2026 | 260342 | ALL | ALL-SR 65-13.25 (BRIDGE REPAIR) | 1 of 4 | $2,008,664 | Low, 1.0% under the second |
| 30 JUL 2026 | 268015 | PRE | PRE-IR 70 WB Truck Parking (PARKING AREAS) | 2 of 6 | $12,783,481 | +7.0% |
| 28 MAY 2026 | 260271 | MAD | MAD-US 42-12.35 (MAJOR WIDENING) | 1 of 4 | $12,288,110 | Low, 3.0% under the second |
| 07 MAY 2026 | 260212 | PRE | PRE-SR 726-02.74 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $1,258,050 | +4.0% |
| 07 MAY 2026 | 260227 | AUG | AUG-US 33-15.65 (INTERCHANGE) | 2 of 3 | $8,285,516 | +5.0% |
| 07 MAY 2026 | 260239 | HAR | HAR-US 68/SR 31 Roundabout (INTERSECTION) | 1 of 3 | $3,596,050 | Low, 2.0% under the second |
| 07 MAY 2026 | 260243 | MIA | MIA-CR 15-05.57 BH (BRIDGE REPAIR) | 1 of 4 | $2,560,670 | Low, 17% under the second |
| 26 MAR 2026 | 260156 | LOG | LOG-US 33-09.58 (INTERSECTION) | 1 of 5 | $3,999,678 | Low, 16% under the second |
| 12 MAR 2026 | 268001 | WYA | WYA-US 30 Rest Areas TP (PARKING AREAS) | 1 of 10 | $3,393,535 | Low, 1.0% under the second |
| 12 MAR 2026 | 268003 | AUG | AUG-US 33/Willipie St Infield TP (PARKING AREAS) | 2 of 5 | $2,445,787 | +1.0% |
| 19 FEB 2026 | 260078 | CLI | CLI-SR 133-02.11 (BRIDGE REPAIR) | 1 of 4 | $1,167,846 | Low, 12% under the second |
| 19 FEB 2026 | 260092 | PAU | PAU-TR 33-04.75 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $1,207,778 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.