ODOT contract 268001 bid tabulation
WYA-US 30 Rest Areas TP (PARKING AREAS). Let by Ohio DOT on March 12, 2026, WYA. 10 bids received; low bid $3,393,535 by Eagle Bridge Co, -13% against the engineer's estimate of $3,894,000.
- Owner
- Ohio DOT
- Letting
- 12 MAR 2026
- Pay items
- 81
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $3,393,535 | Low | -13% |
| 2 | Helms and Sons Excavating | $3,440,241 | +1.0% | -12% |
| 3 | Trucco Construction Co Inc | $3,445,470 | +2.0% | -12% |
| 4 | Great Lakes Construction Co | $3,546,282 | +5.0% | -9.0% |
| 5 | Advanced Excavating & Demolition LLC | $3,565,591 | +5.0% | -8.0% |
| 6 | Mosser Construction Inc | $3,598,720 | +6.0% | -8.0% |
| 7 | Kokosing Construction Company Inc | $3,785,236 | +12% | -3.0% |
| 8 | Shelly & Sands Inc | $4,029,495 | +19% | +3.0% |
| 9 | Complete General Construction Company | $4,189,200 | +23% | +8.0% |
| 10 | Rietschlin Construction Inc | $4,212,312 | +24% | +8.0% |
Engineer's estimate: $3,894,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. Helms and Sons Excavating | 3. Trucco Construction Co Inc | 4. Great Lakes Construction Co | 5. Advanced Excavating & Demolition LLC | 6. Mosser Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,000 | $35,750 | $6,700.00 | $8,500.00 | $65,000 | $3,600.00 |
| 2 | Pavement removed (202E23000) | SY | 12,653 | $13.00 | $13.50 | $13.00 | $12.00 | $15.00 | $15.15 |
| 3 | Walk removed (202E30000) | SF | 2,459 | $1.25 | $1.00 | $1.90 | $1.50 | $4.25 | $1.50 |
| 4 | Curb removed (202E32000) | FT | 4,628 | $3.00 | $2.00 | $3.20 | $2.00 | $7.00 | $2.50 |
| 5 | Pipe removed (202E34900) | FT | 938 | $12.00 | $26.00 | $31.00 | $37.00 | $12.00 | $15.00 |
| 6 | Manhole removed (202E58000) | EACH | 1 | $325.00 | $825.00 | $830.00 | $1,400.00 | $950.00 | $800.00 |
| 7 | Inlet removed (202E58200) | EACH | 10 | $250.00 | $412.00 | $1,570.00 | $900.00 | $725.00 | $450.00 |
| 8 | Excavation (203E10000) | CY | 19,196 | $13.00 | $11.00 | $11.00 | $10.50 | $9.75 | $9.50 |
| 9 | Embankment (203E20000) | CY | 3,118 | $13.00 | $8.00 | $2.60 | $3.50 | $10.75 | $4.20 |
| 10 | Proof rolling (204E45000) | HR | 8 | $150.00 | $115.00 | $334.00 | $200.00 | $360.00 | $240.00 |
| 11 | Cement (206E10500) | TON | 419 | $223.50 | $245.00 | $234.50 | $200.00 | $200.00 | $200.00 |
| 12 | Curing coat (206E11000) | SY | 16,203 | $1.30 | $1.10 | $1.00 | $1.20 | $1.25 | $1.20 |
| 13 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 16,203 | $5.50 | $5.00 | $3.05 | $4.40 | $4.50 | $4.64 |
| 14 | Fence, misc.:dumpster screen wall (607E98000) | FT | 104 | $225.00 | $215.00 | $225.00 | $192.50 | $195.00 | $195.00 |
| 15 | 4" concrete walk (608E10000) | SF | 6,186 | $7.00 | $6.25 | $12.70 | $8.00 | $6.75 | $7.50 |
| 16 | 4" concrete walk, as per plan (608E10001) | SF | 500 | $7.00 | $6.25 | $14.40 | $16.00 | $14.00 | $7.50 |
| 17 | Special - bollard (690E50600) | EACH | 12 | $575.00 | $1,400.00 | $580.00 | $920.00 | $1,325.00 | $920.00 |
| 18 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $200.00 | $250.00 | $500.00 | $130.00 | $275.00 | $161.00 |
| 19 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 18 | $100.00 | $200.00 | $134.00 | $170.00 | $170.00 | $168.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $450.00 | $1,350.00 | $620.00 | $70.00 | $70.00 | $397.00 |
| 21 | Topsoil (659E00300) | CY | 1,800 | $15.00 | $45.00 | $5.00 | $24.00 | $35.00 | $51.00 |
| 22 | Seeding and mulching (659E10000) | SY | 16,215 | $1.65 | $2.00 | $0.90 | $0.92 | $0.95 | $0.92 |
| 23 | Repair seeding and mulching (659E14000) | SY | 811 | $3.00 | $1.20 | $1.10 | $0.92 | $0.50 | $0.92 |
| 24 | Inter-seeding (659E15000) | SY | 811 | $3.00 | $1.20 | $1.10 | $0.70 | $0.50 | $0.70 |
| 25 | Commercial fertilizer (659E20000) | TON | 2.26 | $1,250.00 | $940.00 | $1,020.00 | $850.00 | $820.00 | $850.00 |
| 26 | Lime (659E31000) | ACRE | 3.35 | $5.00 | $55.00 | $730.00 | $35.00 | $1.00 | $35.00 |
| 27 | Water (659E35000) | MGAL | 90 | $12.00 | $1.10 | $15.00 | $1.00 | $0.50 | $1.00 |
| 28 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,250.00 | $3,000.00 | $2,800.00 | $4,000.00 | $1,500.00 | $2,800.00 |
| 29 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $12,500 | $9,500.00 | $6,400.00 | $10,500 | $6,500.00 | $6,420.00 |
| 30 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,000 | $12,000 | $13,400 | $11,000 | $10,500 | $9,934.00 |
| 31 | Erosion control (832E30000) | EACH | 44,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | 4" conduit, type E (611E00400) | FT | 220 | $25.00 | $62.00 | $25.00 | $15.00 | $30.00 | $18.00 |
| 33 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 32 | $23.00 | $45.00 | $32.00 | $23.00 | $52.00 | $50.00 |
| 34 | 12" conduit, type B, as per plan (611E04401) | FT | 472 | $90.00 | $128.00 | $82.00 | $130.00 | $90.00 | $66.00 |
| 35 | 15" conduit, type B, as per plan (611E05901) | FT | 10 | $200.00 | $250.00 | $274.00 | $365.00 | $75.00 | $185.00 |
| 36 | 18" conduit, type B, as per plan (611E07401) | FT | 10 | $220.00 | $240.00 | $262.00 | $525.00 | $200.00 | $200.00 |
| 37 | 18" conduit, type D (611E07900) | FT | 178 | $65.00 | $140.00 | $72.00 | $110.00 | $85.00 | $82.00 |
| 38 | Catch basin, no. 3 (611E98150) | EACH | 5 | $4,500.00 | $4,400.00 | $5,900.00 | $6,000.00 | $4,000.00 | $5,500.00 |
| 39 | Catch basin, no. 3A (611E98180) | EACH | 1 | $3,900.00 | $3,800.00 | $4,200.00 | $5,500.00 | $3,500.00 | $4,500.00 |
| 40 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,250.00 | $2,400.00 | $3,150.00 | $3,600.00 | $3,000.00 | $3,000.00 |
| 41 | Inlet, no. 2-A-10 (611E98860) | EACH | 2 | $7,000.00 | $8,500.00 | $9,100.00 | $6,900.00 | $6,000.00 | $10,500 |
| 42 | Manhole, no. 3 (611E99574) | EACH | 2 | $4,000.00 | $4,700.00 | $4,240.00 | $6,000.00 | $3,650.00 | $6,950.00 |
| 43 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 1 | $1,725.00 | $1,500.00 | $2,550.00 | $3,000.00 | $1,500.00 | $3,680.00 |
| 44 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $325.00 | $650.00 | $1,000.00 | $455.00 | $1,500.00 | $450.00 |
| 45 | Aggregate base (304E20000) | CY | 4,433 | $65.00 | $56.00 | $63.00 | $60.00 | $67.00 | $140.00 |
| 46 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 156 | $64.50 | $82.00 | $130.00 | $215.00 | $95.00 | $74.00 |
| 47 | 10" non-reinforced concrete pavement, class QC 1P (452E14010) | SY | 15,522 | $87.50 | $92.00 | $96.40 | $90.00 | $86.00 | $82.00 |
| 48 | Curb, type 6 (609E26000) | FT | 368 | $24.00 | $26.00 | $34.00 | $50.00 | $19.25 | $16.50 |
| 49 | Curb, type 7 (609E28000) | FT | 2,651 | $23.00 | $25.00 | $33.00 | $35.00 | $20.00 | $17.00 |
| 50 | Curb, misc.:curb, type 7 turnout (609E98000) | FT | 10 | $555.00 | $400.00 | $1,810.00 | $2,000.00 | $1,100.00 | $555.00 |
| 51 | Connection, fused pull apart (625E00450) | EACH | 20 | $100.00 | $200.00 | $102.00 | $175.50 | $176.00 | $175.50 |
| 52 | Connection, unfused permanent (625E00480) | EACH | 33 | $150.00 | $194.00 | $152.00 | $169.50 | $170.00 | $169.50 |
| 53 | Light pole (installation only), as per plan (625E10503) | EACH | 10 | $3,000.00 | $2,290.00 | $3,050.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 54 | Light tower foundation, 36" X 15' deep (625E15000) | EACH | 10 | $9,200.00 | $7,078.00 | $9,300.00 | $6,182.00 | $6,500.00 | $6,182.00 |
| 55 | No. 2 AWG 2400 volt distribution cable (625E23300) | FT | 5,850 | $5.00 | $8.50 | $5.10 | $7.74 | $8.00 | $7.74 |
| 56 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 4,935 | $2.75 | $5.50 | $2.80 | $5.04 | $5.25 | $5.04 |
| 57 | Conduit, 3", 725.051 (625E25504) | FT | 3,490 | $7.25 | $10.20 | $7.40 | $9.31 | $9.50 | $9.31 |
| 58 | Luminaire, high mast, solid state (LED), hmled_P3_ (625E26262) | EACH | 40 | $1,200.00 | $1,300.00 | $1,220.00 | $1,203.00 | $1,225.00 | $1,203.00 |
| 59 | Trench, 24" deep (625E29002) | FT | 3,490 | $5.50 | $14.00 | $5.60 | $12.64 | $12.75 | $12.64 |
| 60 | Pull box, 725.08, 24" (625E30706) | EACH | 11 | $1,500.00 | $1,600.00 | $1,520.00 | $1,420.00 | $1,425.00 | $1,420.00 |
| 61 | Pull box removed (625E31510) | EACH | 3 | $500.00 | $735.00 | $510.00 | $640.00 | $650.00 | $640.00 |
| 62 | Ground rod (625E32000) | EACH | 20 | $300.00 | $355.00 | $305.00 | $310.00 | $310.00 | $310.00 |
| 63 | Underground warning marking tape (625E36010) | FT | 3,490 | $1.75 | $2.50 | $1.80 | $2.13 | $2.25 | $2.13 |
| 64 | Special - maintain existing lighting (625E40000) | LS | 1 | $1,600.00 | $45,000 | $1,630.00 | $39,960 | $40,000 | $39,960 |
| 65 | Light tower removed (625E75350) | EACH | 2 | $2,000.00 | $1,350.00 | $2,030.00 | $1,160.00 | $1,175.00 | $1,160.00 |
| 66 | Luminaire removed (625E75506) | EACH | 2 | $250.00 | $180.00 | $254.00 | $160.00 | $160.00 | $160.00 |
| 67 | Light tower foundation removed (625E75540) | EACH | 2 | $600.00 | $2,150.00 | $610.00 | $1,860.00 | $1,900.00 | $1,860.00 |
| 68 | Lighting, misc.:test existing circuit (625E98000) | EACH | 2 | $2,000.00 | $2,900.00 | $2,030.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 69 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 50 | $50.00 | $90.00 | $50.00 | $79.00 | $80.00 | $79.00 |
| 70 | Breakaway structural beam connection (630E09000) | EACH | 2 | $650.00 | $960.00 | $650.00 | $840.00 | $840.00 | $850.00 |
| 71 | Sign, flat sheet (630E80100) | SF | 98 | $30.00 | $23.00 | $30.00 | $20.00 | $20.00 | $22.50 |
| 72 | Sign, ground mounted extrusheet (630E80200) | SF | 90 | $30.00 | $38.00 | $30.00 | $32.50 | $32.50 | $36.50 |
| 73 | Sign backing assembly (630E82000) | EACH | 12 | $175.00 | $190.00 | $175.00 | $165.00 | $165.00 | $165.00 |
| 74 | Ground mounted structural beam support foundation (630E84500) | EACH | 2 | $2,500.00 | $1,700.00 | $2,500.00 | $1,475.00 | $1,500.00 | $1,480.00 |
| 75 | Parking lot stall marking (646E20200) | FT | 15,894 | $1.75 | $2.00 | $1.90 | $1.75 | $3.50 | $2.75 |
| 76 | Wrong way arrow (646E20320) | EACH | 6 | $325.00 | $375.00 | $240.00 | $325.00 | $350.00 | $325.00 |
| 77 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $20,000 | $20,800 | $27,500 | $70,000 | $18,699 |
| 78 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $15,000 | $23,800 | $32,000 | $50,000 | $7,500.00 |
| 79 | Field office, type B (619E16010) | MNTH | 6 | $3,500.00 | $2,100.00 | $5,300.00 | $3,700.00 | $1,750.00 | $2,500.00 |
| 80 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $18,500 | $25,000 | $56,100 | $50,000 | $72,000 |
| 81 | Mobilization (624E10000) | LS | 1 | $157,500 | $20,000 | $100,000 | $175,000 | $150,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.