Trucco Construction Co Inc: ODOT bid record

Trucco Construction Co Inc submitted 38 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 AUG 2026, and was the low bidder on 4 of them (11%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,777,187
Latest bid
13 AUG 2026
Data through
12 NOV 2026
38Bids
4Low bids
11Win rate, percent
+14%Median gap to the low bid when not low, 34 bids

By year

YearBidsLow bidsWin rate
2020600%
20216233%
202210220%
2023200%
2024500%
2025600%
2026300%
Trucco Construction Co Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
DEL6117%
LIC5120%
KNO400%
UNI300%
FAI300%
ASD300%
FRA300%
LOG2150%
HAR100%
ROS100%
HOC100%
CRA100%
Trucco Construction Co Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH3838 (100%)$1.00$1.00
Water659E35000MGAL3423 (68%)$1.00$1.00
Ground mounted support, no. 3 post630E03100FT3019 (63%)$15.00$15.20
Non-tracking tack coat407E20000GAL2919 (66%)$3.50$3.25
Ground mounted support, no. 2 post630E02100FT2317 (74%)$11.00$15.00
Removal of ground mounted post support and disposal630E86002EACH3316 (48%)$20.00$23.50
Center line644E00300MI2716 (59%)$7,000.00$7,070.00
Commercial fertilizer659E20000TON3514 (40%)$800.00$850.00
Lane arrow644E01300EACH1814 (78%)$105.00$110.00
Sign, flat sheet630E80100SF3613 (36%)$20.00$24.00
Repair seeding and mulching659E14000SY3113 (42%)$0.80$1.25
Connection, fused pull apart625E00450EACH2313 (57%)$110.00$122.84
Trucco Construction Co Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Trucco Construction Co Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
13 AUG 2026260364KNOKNO-SR 13-10.33 (MINOR RECONSTRUCTION)3 of 4$7,605,844+12%
26 MAR 2026260156LOGLOG-US 33-09.58 (INTERSECTION)4 of 5$5,135,394+28%
12 MAR 2026268001WYAWYA-US 30 Rest Areas TP (PARKING AREAS)3 of 10$3,445,470+2.0%
25 SEP 2025250435DELDEL-SR 315-05.00/06.40/08.10 (SLIDE REPAIR)6 of 6$5,270,152+58%
22 MAY 2025250263UNIUNI-US 42-03.91 (MINOR RECONSTRUCTION)3 of 6$8,383,722+5.0%
08 MAY 2025250184UNIUNI-/DEL-US 42-04.92/00.00 (MAJOR RECONSTRUCTION)2 of 2$16,509,398+2.0%
24 APR 2025258005DELDEL-SR 315-05.66 at Hyatts Rd (INTERSECTION)3 of 6$2,899,577+4.0%
27 FEB 2025250093LICLIC-CR 134-02.06 (MINOR RECONSTRUCTION)6 of 10$2,790,364+14%
27 FEB 2025250124LICLIC-CR 804-00.96 (Church St) (MINOR RECONSTRUCTION)3 of 10$2,387,947+12%
31 OCT 2024240458ATHATH-SR 682-06.07 Roundabout9 of 9$6,126,458+29%
18 APR 2024240237LICLIC-MR 297-00.03 (Loop Rd.) (RELOCATION)6 of 7$1,114,083+40%
22 FEB 2024240144LICLIC-SR 661-01.64 (INTERSECTION)6 of 6$2,546,682+19%
08 FEB 2024240087FRAFRA-SR 16-06.87 (at S-Hamilton) (INTERSECTION)2 of 3$6,866,121+3.0%
11 JAN 2024240015KNOKNO-SR 229/SR 308-13.06/00.00 (INTERSECTION)3 of 3$3,603,150+10%
27 APR 2023230253DELDEL-US 36-18.79 (at Galena) (INTERSECTION)3 of 5$3,255,106+16%
27 APR 2023230255FRAFRA-US 40-07.00 (MAJOR RECONSTRUCTION)2 of 4$10,245,107+22%
11 AUG 2022220466KNOKNO-SR 229-14.80 (MISCELLANEOUS)5 of 6$1,809,290+67%
30 JUN 2022220397FRAFRA-US 40-20.10 (at S-Hamilton Rd) (INTERSECTION)4 of 4$1,957,364+40%
12 MAY 2022220300MARMAR-SR 98-06.22 (at SR 529) (INTERSECTION)3 of 3$3,408,392+34%
28 APR 2022220270FAIFAI-US 22-09.42 (INTERSECTION)5 of 5$4,470,442+31%
31 MAR 2022220207FAIFAI-CR 9/TR 222-01.60/00.00 (SIDEWALK)3 of 6$379,690+11%
31 MAR 2022220208LICLIC-SR 13-09.54 (INTERSECTION)1 of 6$1,448,974Low, 4.0% under the second
31 MAR 2022220209LOGLOG-SR 47/SR 235-05.23/08.18 (INTERSECTION)1 of 3$2,624,762Low, 11% under the second
17 MAR 2022220162ASDASD-US 250-19.88 (INTERSECTION)2 of 5$1,379,924+7.0%
17 MAR 2022220163ASDASD-US 250-12.74 (INTERSECTION)3 of 3$2,229,964+13%
Trucco Construction Co Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.