ODOT contract 250184 bid tabulation
UNI-/DEL-US 42-04.92/00.00 (MAJOR RECONSTRUCTION). Let by Ohio DOT on May 8, 2025, UNI. 2 bids received; low bid $16,258,581 by Shelly & Sands Inc, -1.3% against the engineer's estimate of $16,470,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 166
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $16,258,581 | Low | -1.0% |
| 2 | Trucco Construction Co Inc | $16,509,398 | +2.0% | 0.0% |
Engineer's estimate: $16,470,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Trucco Construction Co Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $150,000 | $50,000 |
| 2 | Structure removed (202E11004) | EACH | 2 | $4,800.00 | $23,800 |
| 3 | Headwall removed (202E20010) | EACH | 15 | $640.00 | $610.00 |
| 4 | Pavement removed (202E23000) | SY | 60,561 | $9.00 | $11.80 |
| 5 | Pavement removed, as per plan (202E23001) | SY | 168 | $14.00 | $11.40 |
| 6 | Walk removed (202E30000) | SF | 78 | $5.50 | $5.40 |
| 7 | Curb removed (202E32000) | FT | 134 | $9.00 | $7.10 |
| 8 | Pipe removed, 24" and under (202E35100) | FT | 21,372 | $15.00 | $10.90 |
| 9 | Pipe removed, over 24" diameter (202E35200) | FT | 69 | $50.00 | $50.00 |
| 10 | Guardrail removed (202E38000) | FT | 1,585 | $2.00 | $2.10 |
| 11 | Anchor assembly removed (202E42206) | EACH | 3 | $145.00 | $149.00 |
| 12 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $75.00 | $77.00 |
| 13 | Mailbox removed (202E53100) | EACH | 46 | $20.00 | $178.00 |
| 14 | Catch basin removed (202E58100) | EACH | 57 | $800.00 | $570.00 |
| 15 | Removal misc.: riprap removed (202E98000) | LS | 1 | $3,000.00 | $2,360.00 |
| 16 | Removal misc.: ground wired lighting removed (202E98100) | EACH | 16 | $90.00 | $75.00 |
| 17 | Removal misc.:boulder removed (202E98100) | EACH | 9 | $175.00 | $418.00 |
| 18 | Removal misc.: stone retaining walls removed (202E98400) | SF | 32 | $25.00 | $26.00 |
| 19 | Excavation (203E10000) | CY | 49,880 | $19.00 | $25.00 |
| 20 | Embankment (203E20000) | CY | 11,097 | $16.00 | $4.90 |
| 21 | Subgrade compaction (204E10000) | SY | 5,480 | $6.25 | $5.00 |
| 22 | Excavation of subgrade (204E13000) | CY | 13,875 | $19.00 | $27.00 |
| 23 | Granular material, type B (204E30010) | CY | 13,875 | $50.00 | $51.00 |
| 24 | Proof rolling (204E45000) | HR | 45 | $425.00 | $338.00 |
| 25 | Geotextile fabric (204E50000) | SY | 41,620 | $1.33 | $2.10 |
| 26 | Geogrid (204E51000) | SY | 3,600 | $0.75 | $3.00 |
| 29 | Test rolling (206E20000) | HR | 39 | $125.00 | $338.00 |
| 30 | Guardrail, type MGS (606E15050) | FT | 1,075 | $19.80 | $20.30 |
| 31 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 8 | $2,480.00 | $2,540.00 |
| 32 | Bridge terminal assembly, type 4 (606E35140) | EACH | 4 | $1,035.00 | $1,060.00 |
| 33 | Right-of-way monument, type B (623E40520) | EACH | 67 | $115.00 | $197.00 |
| 34 | Special - mailbox support system, single (690E50100) | EACH | 38 | $195.00 | $200.00 |
| 35 | Special - mailbox support system, double (690E50200) | EACH | 7 | $295.00 | $303.00 |
| 36 | Riprap (601E10000) | SY | 8 | $500.00 | $217.00 |
| 37 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 53 | $104.00 | $173.00 |
| 38 | Rock channel protection, type B with filter (601E32100) | CY | 41 | $180.00 | $154.00 |
| 39 | Rock channel protection, type C with filter (601E32200) | CY | 29 | $300.00 | $154.00 |
| 40 | Topsoil (659E00300) | CY | 8,907 | $20.00 | $37.00 |
| 41 | Seeding and mulching (659E10000) | SY | 80,165 | $0.73 | $0.70 |
| 42 | Repair seeding and mulching (659E14000) | SY | 4,008 | $0.72 | $0.90 |
| 43 | Inter-seeding (659E15000) | SY | 4,008 | $0.18 | $0.50 |
| 44 | Commercial fertilizer (659E20000) | TON | 11.63 | $835.00 | $700.00 |
| 45 | Lime (659E31000) | ACRE | 16.56 | $155.50 | $10.00 |
| 46 | Water (659E35000) | MGAL | 455 | $1.00 | $0.50 |
| 47 | Slope erosion protection (670E00500) | SY | 17,849 | $1.20 | $2.00 |
| 48 | Ditch erosion protection (670E00700) | SY | 5,354 | $1.36 | $2.30 |
| 49 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,500.00 | $3,950.00 |
| 50 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $20,000 | $18,400 |
| 51 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $15,050 | $15,000 |
| 52 | Erosion control (832E30000) | EACH | 575,460 | $1.00 | $1.00 |
| 53 | Concrete masonry (602E20000) | CY | 23 | $3,200.00 | $4,650.00 |
| 54 | 4" base pipe underdrains (605E06000) | FT | 645 | $16.00 | $8.90 |
| 55 | Aggregate drains (605E31100) | FT | 11,970 | $16.00 | $15.70 |
| 56 | 4" conduit, type E (611E00400) | FT | 39 | $46.50 | $100.00 |
| 57 | 4" conduit, type F (611E00406) | FT | 89 | $34.00 | $38.00 |
| 58 | 6" conduit, type E (611E01400) | FT | 263 | $31.00 | $71.00 |
| 59 | 6" conduit, type E (611E01400) | FT | 223 | $40.00 | $62.00 |
| 60 | 8" conduit, type C (611E02000) | FT | 30 | $44.00 | $48.00 |
| 61 | 8" conduit, type E (611E02500) | FT | 222 | $40.00 | $79.00 |
| 62 | 12" conduit, type B (611E04400) | FT | 809 | $83.50 | $95.00 |
| 63 | 12" conduit, type C (611E04600) | FT | 6,570 | $59.00 | $53.00 |
| 64 | 12" conduit, type D (611E04900) | FT | 1,024 | $73.00 | $55.00 |
| 65 | 12" conduit, type E (611E05100) | FT | 7,453 | $56.00 | $50.00 |
| 66 | 15" conduit, type A (611E05700) | FT | 114 | $156.00 | $195.00 |
| 67 | 15" conduit, type B (611E05900) | FT | 71 | $125.00 | $144.00 |
| 68 | 15" conduit, type C (611E06100) | FT | 2,261 | $72.00 | $62.00 |
| 69 | 15" conduit, type D (611E06400) | FT | 421 | $79.00 | $56.00 |
| 70 | 15" conduit, type D (611E06400) | FT | 64 | $98.00 | $78.00 |
| 71 | 18" conduit, type A (611E07200) | FT | 108 | $161.00 | $210.00 |
| 72 | 18" conduit, type C (611E07600) | FT | 2,052 | $74.00 | $217.00 |
| 73 | 18" conduit, type D (611E07900) | FT | 135 | $59.00 | $65.00 |
| 74 | 21" conduit, type C (611E09100) | FT | 14 | $157.00 | $107.00 |
| 75 | 24" conduit, type B (611E10400) | FT | 188 | $149.00 | $127.00 |
| 76 | 24" conduit, type C (611E10600) | FT | 628 | $99.00 | $101.00 |
| 77 | 24" conduit, type D (611E10900) | FT | 192 | $104.00 | $84.00 |
| 78 | 30" conduit, type D (611E13900) | FT | 96 | $117.00 | $125.00 |
| 79 | 36" conduit, type C (611E16600) | FT | 1,388 | $133.00 | $147.00 |
| 80 | 36" conduit, type C (611E16600) | FT | 12 | $241.00 | $334.00 |
| 81 | 36" conduit, type D (611E16900) | FT | 648 | $137.00 | $151.00 |
| 82 | 42" conduit, type B (611E19400) | FT | 80 | $220.00 | $271.00 |
| 83 | 42" conduit, type C (611E19600) | FT | 34 | $179.00 | $194.00 |
| 84 | 48" conduit, type C (611E21100) | FT | 580 | $200.00 | $190.00 |
| 85 | 60" conduit, type C (611E24000) | FT | 814 | $250.00 | $249.00 |
| 86 | 14" X 23" conduit, type A, 706.04 (611E52200) | FT | 175 | $208.00 | $242.00 |
| 87 | 14" X 23" conduit, type B, 706.04 (611E52202) | FT | 62 | $211.00 | $203.00 |
| 88 | 14" X 23" conduit, type D, 706.04 (611E52206) | FT | 192 | $158.00 | $99.00 |
| 89 | 19" X 30" conduit, type A, 706.04 (611E52300) | FT | 112 | $229.00 | $281.00 |
| 90 | 19" X 30" conduit, type D, 706.04 (611E52306) | FT | 68 | $204.00 | $200.00 |
| 91 | 22" X 34" conduit, type A, 706.04 (611E52400) | FT | 244 | $256.00 | $256.00 |
| 92 | 24" X 38" conduit, type A, 706.04 (611E52500) | FT | 56 | $292.00 | $351.00 |
| 93 | 24" X 38" conduit, type B, 706.04 (611E52502) | FT | 71 | $251.00 | $266.00 |
| 94 | 24" X 38" conduit, type C, 706.04 (611E52504) | FT | 62 | $266.00 | $190.00 |
| 95 | 29" X 45" conduit, type A, 706.04 (611E52700) | FT | 60 | $346.00 | $408.00 |
| 96 | 29" X 45" conduit, type D, 706.04 (611E52706) | FT | 64 | $287.00 | $255.00 |
| 97 | 43" X 68" conduit, type B, 706.04 (611E53102) | FT | 73 | $610.00 | $650.00 |
| 99 | Conduit, misc.:conduit removal for drainage contin (611E97400) | FT | 200 | $15.00 | $11.00 |
| 100 | Conduit, misc.:type E for drainage continuance (611E97400) | FT | 100 | $25.00 | $32.00 |
| 101 | Conduit, misc.:type F for drainage continuance (611E97400) | FT | 100 | $26.00 | $32.00 |
| 102 | Catch basin, no. 7 (611E98390) | EACH | 7 | $3,200.00 | $2,730.00 |
| 103 | Catch basin, no. 8 (611E98410) | EACH | 48 | $6,500.00 | $6,500.00 |
| 104 | Catch basin, no. 8A (611E98434) | EACH | 1 | $10,000 | $11,400 |
| 105 | Catch basin, no. 2-2B (611E98470) | EACH | 70 | $3,250.00 | $2,730.00 |
| 106 | Catch basin, no. 2-3 (611E98510) | EACH | 2 | $3,700.00 | $3,350.00 |
| 107 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $4,400.00 | $5,300.00 |
| 108 | Manhole, no. 3 (611E99574) | EACH | 19 | $7,250.00 | $14,400 |
| 109 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 300 | $75.00 | $61.00 |
| 110 | Pavement planing, asphalt concrete (variable depth (254E01000) | SY | 47,789 | $3.10 | $2.50 |
| 111 | Full depth pavement sawing (255E20000) | FT | 63,839 | $2.40 | $2.40 |
| 112 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 17,464 | $155.00 | $138.00 |
| 113 | Aggregate base, as per plan (304E20001) | CY | 19,163 | $62.00 | $66.00 |
| 114 | Tack coat (407E10000) | GAL | 75 | $3.50 | $3.90 |
| 115 | Non-tracking tack coat (407E20000) | GAL | 18,672 | $3.50 | $3.90 |
| 116 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 60 | $350.00 | $445.00 |
| 117 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 162 | $390.00 | $252.00 |
| 118 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 6 | $345.00 | $293.00 |
| 119 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 66 | $320.00 | $305.00 |
| 120 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 5,056 | $210.00 | $196.00 |
| 121 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 6,111 | $175.00 | $161.00 |
| 122 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 190 | $113.00 | $115.00 |
| 123 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 224 | $115.00 | $120.00 |
| 124 | Compacted aggregate (617E10100) | CY | 381 | $83.00 | $109.00 |
| 125 | Water (617E25000) | MGAL | 1 | $114.00 | $416.00 |
| 126 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 10.92 | $805.00 | $610.00 |
| 127 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 6.03 | $805.00 | $610.00 |
| 128 | Longitudinal joint preparation (874E21000) | MI | 11.91 | $950.00 | $5,500.00 |
| 129 | RPM (621E00100) | EACH | 452 | $37.75 | $36.00 |
| 130 | Raised pavement marker removed (621E54000) | EACH | 391 | $9.00 | $32.00 |
| 131 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 21 | $12.00 | $10.30 |
| 132 | Ground mounted support, no. 3 post (630E03100) | FT | 588.50 | $15.00 | $16.20 |
| 133 | Street name sign support, no. 3 post (630E08520) | FT | 84 | $18.00 | $19.40 |
| 134 | Sign post reflector (630E08600) | EACH | 10 | $45.00 | $49.00 |
| 135 | Sign, flat sheet (630E80100) | SF | 301 | $15.50 | $16.70 |
| 136 | Sign, double faced, street name, as per plan (630E80501) | EACH | 5 | $175.00 | $189.00 |
| 137 | Sign, double faced, street name, as per plan (630E80501) | EACH | 2 | $175.00 | $189.00 |
| 138 | Removal of ground mounted sign and disposal (630E84900) | EACH | 101 | $10.00 | $10.80 |
| 139 | Removal of ground mounted post support and disposal (630E86002) | EACH | 57 | $20.00 | $21.60 |
| 140 | Edge line, 4", type 1 (642E00100) | MI | 0.50 | $830.00 | $830.00 |
| 141 | Center line, type 1 (642E00300) | MI | 0.25 | $1,350.00 | $1,350.00 |
| 142 | Edge line, 6" (644E00104) | MI | 11.36 | $3,720.00 | $3,720.00 |
| 143 | Center line (644E00300) | MI | 5.99 | $3,060.00 | $3,060.00 |
| 144 | Channelizing line, 8" (644E00400) | FT | 410 | $2.80 | $2.80 |
| 145 | Stop line (644E00500) | FT | 136 | $8.80 | $8.80 |
| 146 | Lane arrow (644E01300) | EACH | 6 | $110.00 | $110.00 |
| 147 | Detector loop (632E26500) | EACH | 4 | $4,000.00 | $2,250.00 |
| 148 | Signalization, misc.: reset pull box to grade (632E90400) | EACH | 4 | $1,500.00 | $880.00 |
| 149 | Traffic compacted surface, type A or B (410E12000) | CY | 400 | $70.00 | $138.00 |
| 150 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $104.00 | $135.00 |
| 151 | Detour signing (614E12420) | LS | 1 | $14,500 | $13,600 |
| 152 | Replacement drum (614E12600) | EACH | 20 | $55.00 | $60.00 |
| 153 | Portable changeable message sign (614E18600) | SNMT | 50 | $650.00 | $940.00 |
| 154 | Work zone edge line, class I, 4" (614E22000) | MI | 13.25 | $620.00 | $790.00 |
| 155 | Work zone arrow, class I (614E30000) | EACH | 10 | $70.00 | $80.00 |
| 156 | Pavement for maintaining traffic, class B (615E25000) | SY | 1,000 | $65.00 | $119.00 |
| 157 | Water (616E10000) | MGAL | 150 | $45.00 | $80.00 |
| 158 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $78,043 | $75,000 |
| 159 | Maintaining traffic (614E11000) | LS | 1 | $350,000 | $404,000 |
| 160 | Field office, type B (619E16010) | MNTH | 21 | $4,500.00 | $3,500.00 |
| 161 | Construction layout stakes and surveying (623E10000) | LS | 1 | $100,000 | $126,000 |
| 162 | Mobilization (624E10000) | LS | 1 | $833,000 | $400,000 |
| 200 | 48" X 76" conduit, type A, 706.04, as per plan (611E53201) | FT | 60 | $795.00 | $750.00 |
| 201 | 53" X 83" conduit, type A, 706.04 (611E53300) | FT | 88 | $892.00 | $840.00 |
| 202 | Work zone center line, class III, 642 paint (614E21550) | MI | 6 | $700.00 | $1,100.00 |
| 203 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 12 | $650.00 | $830.00 |
| 204 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 410 | $1.00 | $2.00 |
| 205 | Work zone stop line, class III, 642 paint (614E26610) | FT | 138 | $3.00 | $5.00 |
| 206 | 18" conduit, type B (611E07400) | FT | 48 | $97.00 | $224.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way