ODOT letting results, May 8, 2025
28 contracts let by Ohio DOT on May 8, 2025, $54,448,588 in low bids, a median of 3 bidders per contract. On the 28 with an engineer's estimate, the low bid came in under it 18 times; median low bid -4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 28
- Low bids, total
- $54,448,588
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 250184 | UNI-/DEL-US 42-04.92/00.00 (MAJOR RECONSTRUCTION) | UNI | 2 | Shelly & Sands Inc | $16,258,581 | $16,509,398 | +2.0% | -1.0% | ODOT |
| 250248 | GRE-US 35-00.08 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | GRE | 2 | John R Jurgensen Company | $6,591,961 | $7,660,322 | +16% | -6.0% | ODOT |
| 250239 | ATB-US 322-08.11 (MINOR RECONSTRUCTION) | ATB | 2 | Ronyak Paving Inc | $5,536,330 | $5,865,000 | +6.0% | -13% | ODOT |
| 250257 | OTT-SR 269-01.78 Roundabout (INTERSECTION) | OTT | 3 | Great Lakes Demolition Company | $3,109,878 | $3,201,231 | +3.0% | -12% | ODOT |
| 250245 | D12-CU FY2024 (CULVERT REPLACEMENT) | District 12 | 1 | Madex Construction Co | $2,797,653 | +55% | ODOT | ||
| 250252 | JAC-US 35-23.94 (FOUR LANE RESURFACING) | JAC | 1 | Shelly & Sands Inc | $2,415,154 | 0.0% | ODOT | ||
| 250265 | WAY-SR 585-02.73 (INTERSECTION) | WAY | 2 | Shelly & Sands Inc | $1,814,950 | $2,508,948 | +38% | -15% | ODOT |
| 250266 | D12-GR FY2025 (GUARDRAIL REBUILDING) | District 12 | 1 | Lake Erie Construction Company | $1,658,325 | +5.0% | ODOT | ||
| 250246 | FRA-Wynne Ridge Court (BRIDGE REPLACEMENT (1 BRIDGE)) | FRA | 3 | Shelly & Sands Inc | $1,595,558 | $1,696,028 | +6.0% | -15% | ODOT |
| 250240 | BEL-CR 4-27.05 (BRIDGE REPLACEMENT (1 BRIDGE)) | BEL | 3 | Shelly & Sands Inc | $1,415,154 | $1,428,208 | +1.0% | -20% | ODOT |
| 250244 | D03-TSG FY2025(B) (SIGNALIZATION) | District 3 | 3 | Cornerstone Electric Inc | $1,247,324 | $1,251,222 | 0.0% | -11% | ODOT |
| 250254 | JEF-SR 43-08.40 (INTERSECTION) | JEF | 4 | Shelly & Sands Inc | $1,223,940 | $1,329,850 | +9.0% | +1.0% | ODOT |
| 250250 | HAM-CR 96-05.25 Springdale Road (SIDEWALK) | HAM | 2 | Prus Construction Company | $1,051,156 | $1,279,020 | +22% | +14% | ODOT |
| 250261 | SUM-Barberton Sidewalks (SIDEWALK) | SUM | 3 | Fabrizi Trucking & Paving Co Inc | $750,534 | $773,518 | +3.0% | +2.0% | ODOT |
| 250247 | FRA-US 23/VAR-23.26/VAR-SIGN (SIGNING) | FRA | 2 | Lake Erie Construction Company | $743,525 | $929,998 | +25% | -4.0% | ODOT |
| 250258 | PAU-SR 637-12.27 (SLIDE REPAIR) | PAU | 6 | Miller Contracting Group Inc | $741,944 | $770,273 | +4.0% | -28% | ODOT |
| 250259 | PER-TR 1180-00.605 (BRIDGE REPLACEMENT (1 BRIDGE)) | PER | 5 | Axis Civil Construction LLC | $655,173 | $760,535 | +16% | -18% | ODOT |
| 250267 | D12-Noise Barrier Repair (NOISE WALLS) | District 12 | 3 | Great Lakes Construction Co | $648,372 | $789,997 | +22% | +62% | ODOT |
| 250256 | MAH-SR 7-10.25 (INTERSECTION) | MAH | 2 | Cornerstone Electric Inc | $527,294 | $688,854 | +31% | -1.0% | ODOT |
| 250243 | COL-Salem Signals Upgrades (SIGNALIZATION) | COL | 2 | Cornerstone Electric Inc | $506,424 | $525,700 | +4.0% | +11% | ODOT |
| 250269 | JEF-SR 150-03.544 (INTERSECTION) | JEF | 5 | LMS Construction Inc | $498,957 | $619,022 | +24% | -4.0% | ODOT |
| 250249 | HAM-CR 91-01.05 Poole Rd Sidewalk (SIDEWALK) | HAM | 3 | Barrett Paving Materials Inc | $494,695 | $533,981 | +8.0% | +17% | ODOT |
| 250264 | WAY-SR 241-01.32 (SLIDE REPAIR) | WAY | 4 | Ohio-West Virginia Excavating Co | $413,296 | $418,075 | +1.0% | -12% | ODOT |
| 250255 | LIC-SR 16-05.38 (MISCELLANEOUS) | LIC | 3 | M P Dory Co | $391,803 | $408,328 | +4.0% | +1.0% | ODOT |
| 250260 | RIC-US 42/SR 545-00.41/02.36 (CULVERT REPLACEMENT) | RIC | 3 | BCC Ohio Inc | $370,071 | $410,454 | +11% | -26% | ODOT |
| 250270 | MRW-CS-FY2025 (CRACK SEALING) | MRW | 3 | Strawser Construction Inc | $340,600 | $403,036 | +18% | -36% | ODOT |
| 250268 | D12-SIGN FY2025 (SIGNING) | District 12 | 2 | Lake Erie Construction Company | $332,150 | $343,821 | +4.0% | -4.0% | ODOT |
| 254016 | PAU-SR 111-01.65 (CULVERT REPLACEMENT) | PAU | 3 | Sand Ridge Excavating | $317,786 | $331,156 | +4.0% | -17% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.