Great Lakes Demolition Company: ODOT bid record
Great Lakes Demolition Company submitted 76 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 40 of them (53%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $67,949,228
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 14 | 5 | 36% |
| 2021 | 15 | 6 | 40% |
| 2022 | 10 | 8 | 80% |
| 2023 | 4 | 2 | 50% |
| 2024 | 11 | 6 | 55% |
| 2025 | 13 | 8 | 62% |
| 2026 | 9 | 5 | 56% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HUR | 11 | 5 | 45% |
| SAN | 11 | 7 | 64% |
| OTT | 11 | 5 | 45% |
| ASD | 8 | 4 | 50% |
| WOO | 8 | 3 | 38% |
| ERI | 6 | 4 | 67% |
| LOR | 3 | 2 | 67% |
| RIC | 3 | 1 | 33% |
| SEN | 3 | 2 | 67% |
| WYA | 3 | 1 | 33% |
| MED | 2 | 1 | 50% |
| CRA | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 75 | 75 (100%) | $1.00 | $1.00 |
| Aggregate base | 304E20000 | CY | 72 | 36 (50%) | $65.00 | $90.00 |
| Water | 659E35000 | MGAL | 71 | 33 (46%) | $1.00 | $1.00 |
| Excavation | 203E10000 | CY | 75 | 32 (43%) | $20.00 | $27.00 |
| Seeding and mulching | 659E10000 | SY | 69 | 32 (46%) | $2.00 | $2.60 |
| Guardrail removed | 202E38000 | FT | 45 | 28 (62%) | $2.00 | $2.50 |
| Repair seeding and mulching | 659E14000 | SY | 62 | 27 (44%) | $1.00 | $1.25 |
| Concrete masonry | 602E20000 | CY | 51 | 21 (41%) | $1,800.00 | $2,300.00 |
| Embankment | 203E20000 | CY | 67 | 20 (30%) | $20.00 | $25.00 |
| Subgrade compaction | 204E10000 | SY | 68 | 18 (26%) | $2.00 | $3.00 |
| Pavement removed | 202E23000 | SY | 66 | 17 (26%) | $15.00 | $17.00 |
| Commercial fertilizer | 659E20000 | TON | 70 | 15 (21%) | $800.00 | $850.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 41 | 7 of 41 |
| Vernon Nagel Inc | 29 | 7 of 29 |
| Crawford Construction Company Inc | 18 | 3 of 18 |
| Adena Corporation | 14 | 6 of 14 |
| Mosser Construction Inc | 13 | 5 of 13 |
| R & I Construction Inc | 12 | 2 of 12 |
| Rietschlin Construction Inc | 11 | 2 of 11 |
| BCC Ohio Inc | 11 | 3 of 11 |
| Miller Bros Const Inc | 10 | 2 of 10 |
| Kelstin Inc | 8 | 1 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260459 | FUL | FUL-US 20A-19.20 Slide Repair (SLIDE REPAIR) | 2 of 5 | $1,322,831 | +4.0% |
| 12 NOV 2026 | 260508 | RIC | RIC-SR 13-28.73 (CULVERT REPLACEMENT) | 1 of 8 | $356,812 | Low, 2.0% under the second |
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 7 | $952,236 | Low, 5.0% under the second |
| 01 OCT 2026 | 260451 | WYA | WYA-Killdeer Plains WLF (PARKING AREAS) | 2 of 8 | $347,930 | +6.0% |
| 16 JUL 2026 | 264017 | CRA | CRA-SR 100-18.38 (CULVERT REPLACEMENT) | 1 of 4 | $440,509 | Low, 7.0% under the second |
| 07 MAY 2026 | 260167 | ERI | ERI-US 6-Connectivity Corrid. (MAJOR RECONSTRUCTION) | 1 of 3 | $30,841,629 | Low, 7.0% under the second |
| 07 MAY 2026 | 260240 | HUR | HUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $3,743,850 | +18% |
| 07 MAY 2026 | 260248 | SAN | SAN-US 20-20.80 roundabout (INTERSECTION) | 1 of 3 | $7,215,189 | Low, 6.0% under the second |
| 12 MAR 2026 | 260131 | OTT | OTT-SR 357-02.30 Repair (MISCELLANEOUS) | 2 of 6 | $335,241 | +4.0% |
| 23 OCT 2025 | 250513 | HUR | HUR-SR 303-02.42 (CULVERT REPLACEMENT) | 1 of 8 | $213,607 | Low, 2.0% under the second |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 7 | $1,775,253 | +17% |
| 25 SEP 2025 | 254026 | SAN | SAN-SR 523-03.07 Brdg Rehab (BRIDGE REPAIR) | 1 of 4 | $691,224 | Low, 12% under the second |
| 08 MAY 2025 | 250257 | OTT | OTT-SR 269-01.78 Roundabout (INTERSECTION) | 1 of 3 | $3,109,878 | Low, 3.0% under the second |
| 24 APR 2025 | 250222 | OTT | OTT-SR 163-24.22 PC Shore Revtmt (SLIDE REPAIR) | 6 of 10 | $3,898,459 | +15% |
| 24 APR 2025 | 250223 | OTT | OTT-SR 2-17.69 Slope Stab. (SLIDE REPAIR) | 2 of 3 | $555,717 | +6.0% |
| 13 FEB 2025 | 250112 | WOO | WOO-IR 75-08.58 Weigh Station (PARKING AREAS) | 2 of 4 | $694,981 | 0.0% |
| 13 FEB 2025 | 254007 | ERI | ERI-/HUR-SR 113/SR 13-20.18/04.13 (CULVERT REPLACEMENT) | 1 of 2 | $528,983 | Low, 10% under the second |
| 30 JAN 2025 | 250056 | LOR | LOR-US 20-02.05 (INTERSECTION) | 1 of 5 | $1,885,439 | Low, 10% under the second |
| 30 JAN 2025 | 254005 | SEN | SEN-US 224-00.13/00.65/06.94/08.48 (CULVERT REPLACEMENT) | 1 of 3 | $643,252 | Low, 12% under the second |
| 16 JAN 2025 | 250016 | HUR | HUR-SR 18-17.10 (INTERSECTION) | 7 of 7 | $2,112,824 | +39% |
| 16 JAN 2025 | 250022 | SAN | SAN-US 6-17.66 Slide Repair (SLIDE REPAIR) | 1 of 3 | $1,304,978 | Low, 24% under the second |
| 16 JAN 2025 | 254000 | ASD | ASD-/WAY-US 42/SR 301-01.90/05.54 (CULVERT REPLACEMENT) | 1 of 2 | $353,092 | Low, 4.0% under the second |
| 19 DEC 2024 | 244026 | ASD | ASD-SR 511-22.26 (CULVERT REPLACEMENT) | 3 of 4 | $297,541 | +13% |
| 26 SEP 2024 | 240437 | ERI | ERI-SR 2-21.23 (CULVERT REPLACEMENT) | 1 of 3 | $412,364 | Low, 31% under the second |
| 22 AUG 2024 | 240404 | MAR | MAR-SR 746-03.641 (CULVERT REPLACEMENT) | 1 of 7 | $139,503 | Low, 3.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.