ODOT contract 250223 bid tabulation
OTT-SR 2-17.69 Slope Stab. (SLIDE REPAIR). Let by Ohio DOT on April 24, 2025, OTT. 3 bids received; low bid $525,237 by Vernon Nagel Inc, -20% against the engineer's estimate of $653,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 66
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vernon Nagel Inc | $525,237 | Low | -20% |
| 2 | Great Lakes Demolition Company | $555,717 | +6.0% | -15% |
| 3 | Eclipse Co LLC | $663,395 | +26% | +2.0% |
Engineer's estimate: $653,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vernon Nagel Inc | 2. Great Lakes Demolition Company | 3. Eclipse Co LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $20,000 | $6,500.00 | $1,000.00 |
| 2 | Pavement removed (202E23000) | SY | 60 | $30.00 | $90.00 | $19.50 |
| 3 | Concrete barrier removed, as per plan (202E30701) | FT | 137.50 | $16.00 | $20.00 | $22.75 |
| 4 | Curb removed (202E32000) | FT | 18 | $10.00 | $10.00 | $24.50 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 60 | $5.00 | $25.00 | $27.75 |
| 6 | Guardrail removed (202E38000) | FT | 325 | $4.00 | $4.00 | $2.50 |
| 7 | Guardrail removed for reuse (202E38200) | FT | 570 | $4.00 | $4.00 | $3.25 |
| 8 | Anchor assembly removed for reuse (202E42806) | EACH | 1 | $350.00 | $350.00 | $125.00 |
| 9 | Bridge terminal assembly removed for reuse (202E47200) | EACH | 2 | $350.00 | $350.00 | $100.00 |
| 10 | Impact attenuator removed, as per plan (202E47801) | EACH | 1 | $1,000.00 | $1,500.00 | $525.00 |
| 11 | Catch basin removed (202E58100) | EACH | 1 | $250.00 | $450.00 | $441.00 |
| 12 | Removal misc.:, traffic drums (202E98000) | LS | 1 | $250.00 | $4,500.00 | $210.25 |
| 13 | Removal misc.:, underdrain (202E98200) | FT | 380 | $18.00 | $15.00 | $8.50 |
| 14 | Excavation (203E10000) | CY | 3,290 | $18.00 | $6.00 | $17.25 |
| 15 | Embankment, as per plan (203E20001) | CY | 3,290 | $12.00 | $6.00 | $17.25 |
| 16 | Granular material, type B (203E35110) | CY | 165 | $55.00 | $50.00 | $68.50 |
| 17 | Granular material, type D (203E35130) | CY | 438 | $65.00 | $55.00 | $76.50 |
| 18 | Borrow, as per plan (203E40001) | CY | 402 | $15.00 | $25.00 | $15.75 |
| 19 | Subgrade compaction (204E10000) | SY | 606 | $1.00 | $3.00 | $0.75 |
| 20 | Excavation of subgrade (204E13000) | CY | 202 | $24.00 | $15.00 | $37.50 |
| 21 | Granular material, type C (204E30020) | CY | 202 | $85.00 | $50.00 | $75.25 |
| 22 | Geotextile fabric (204E50000) | SY | 606 | $1.75 | $4.00 | $4.50 |
| 23 | Guardrail, type MGS (606E15050) | FT | 325 | $31.00 | $31.00 | $23.25 |
| 24 | Guardrail rebuilt, type MGS (606E16050) | FT | 570 | $15.75 | $16.00 | $15.25 |
| 25 | Anchor assembly rebuilt, MGS type T (606E27910) | EACH | 1 | $875.00 | $875.00 | $1,260.00 |
| 26 | MGS bridge terminal assembly rebuilt, type 1 (606E35012) | EACH | 1 | $1,250.00 | $1,250.00 | $2,340.00 |
| 27 | MGS bridge terminal assembly rebuilt, type 2 (606E35112) | EACH | 1 | $675.00 | $675.00 | $520.00 |
| 28 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 617 | $60.00 | $61.00 | $99.00 |
| 29 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 7 | $185.00 | $200.00 | $217.00 |
| 30 | Topsoil (659E00300) | CY | 462 | $30.00 | $50.00 | $73.50 |
| 31 | Seeding and mulching, class 3B (659E00530) | SY | 4,129 | $2.25 | $3.00 | $2.00 |
| 32 | Repair seeding and mulching (659E14000) | SY | 214 | $1.20 | $1.00 | $1.00 |
| 33 | Commercial fertilizer (659E20000) | TON | 0.61 | $850.00 | $800.00 | $1,113.75 |
| 34 | Water (659E35000) | MGAL | 22 | $1.00 | $20.00 | $1.00 |
| 35 | Erosion control mat, type F (671E15050) | SY | 3,650 | $1.90 | $6.00 | $2.00 |
| 36 | Erosion control (832E30000) | EACH | 40,000 | $1.00 | $1.00 | $1.00 |
| 37 | Concrete masonry (602E20000) | CY | 0.21 | $5,000.00 | $3,500.00 | $4,153.52 |
| 38 | 12" conduit, type F (611E05200) | FT | 65 | $105.00 | $150.00 | $102.75 |
| 39 | Catch basin, no. 6 (611E98370) | EACH | 1 | $4,600.00 | $3,250.00 | $4,961.25 |
| 40 | Full depth pavement sawing (252E01500) | FT | 394 | $2.00 | $4.00 | $2.25 |
| 41 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 70 | $310.00 | $320.00 | $310.00 |
| 42 | Aggregate base (304E20000) | CY | 91 | $75.00 | $55.00 | $78.25 |
| 43 | Tack coat (407E10000) | GAL | 82 | $5.00 | $4.00 | $5.00 |
| 44 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 35 | $350.00 | $420.00 | $350.00 |
| 45 | Combination curb and gutter, type 4 (609E23000) | FT | 846 | $35.00 | $25.00 | $41.00 |
| 46 | Combination curb and gutter, type 4, as per plan (609E23001) | FT | 45 | $35.00 | $25.00 | $50.00 |
| 47 | Longitudinal joint adhesive (875E10000) | LB | 193 | $1.00 | $4.00 | $6.00 |
| 48 | Edge line, 6", type 1 (642E00104) | MI | 0.10 | $1,000.00 | $1,000.00 | $1,500.00 |
| 49 | Lane line, 6", type 1 (642E00204) | MI | 1.07 | $500.00 | $500.00 | $1,500.00 |
| 50 | Dotted line, 6", type 1 (642E01510) | FT | 550 | $0.50 | $0.50 | $1.00 |
| 51 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $80.00 | $150.00 | $75.00 |
| 52 | Increased barrier delineation (614E11630) | FT | 1,938 | $1.00 | $5.00 | $2.75 |
| 53 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,750.00 | $2,750.00 | $1,767.25 |
| 54 | Replacement sign (614E12500) | EACH | 3 | $192.00 | $192.00 | $149.75 |
| 55 | Replacement drum (614E12600) | EACH | 6 | $56.00 | $56.00 | $55.25 |
| 56 | Barrier reflector, type 1, one-way (614E13310) | EACH | 39 | $8.00 | $8.00 | $12.50 |
| 57 | Object marker, one way (614E13350) | EACH | 39 | $18.00 | $18.00 | $19.75 |
| 58 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $900.00 | $900.00 | $1,075.50 |
| 59 | Work zone edge line, class I, 6" (614E22010) | MI | 1 | $1,000.00 | $1,000.00 | $2,500.00 |
| 60 | Work zone dotted line, class I (614E24000) | FT | 2,594 | $0.50 | $0.50 | $0.50 |
| 61 | Water (616E10000) | MGAL | 130 | $1.00 | $20.00 | $29.25 |
| 62 | Portable barrier, unanchored (622E41100) | FT | 1,938 | $15.00 | $30.00 | $42.50 |
| 63 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $7,000.00 | $8,620.50 |
| 64 | Maintaining traffic (614E11000) | LS | 1 | $18,000 | $18,650 | $29,083 |
| 65 | Construction layout stakes and surveying (623E10000) | LS | 1 | $6,000.00 | $8,500.00 | $13,589 |
| 66 | Mobilization (624E10000) | LS | 1 | $25,000 | $60,000 | $29,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.