ODOT letting results, April 24, 2025
31 contracts let by Ohio DOT on April 24, 2025, $168,314,315 in low bids, a median of 3 bidders per contract. On the 31 with an engineer's estimate, the low bid came in under it 24 times; median low bid -8.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 31
- Low bids, total
- $168,314,315
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 250212 | ATH-/MEG-US 33-23.23/00.00 (MAJOR WIDENING) | ATH | 1 | Kokosing Construction Company Inc | $116,113,876 | +17% | ODOT | ||
| 258006 | BEL-US 40-23.26 (BRIDGE REPAIR) | BEL | 1 | Beaver Excavating Company | $17,016,026 | -9.0% | ODOT | ||
| 250222 | OTT-SR 163-24.22 PC Shore Revtmt (SLIDE REPAIR) | OTT | 10 | Mark Haynes Construction Inc | $3,386,581 | $3,386,790 | 0.0% | -35% | ODOT |
| 250210 | ATB-SR 7-31.10 (MINOR RECONSTRUCTION) | ATB | 1 | Catts Construction Inc | $2,803,417 | +17% | ODOT | ||
| 258005 | DEL-SR 315-05.66 at Hyatts Rd (INTERSECTION) | DEL | 6 | Strawser Paving Co Inc | $2,796,257 | $2,759,947 | -1.0% | +6.0% | ODOT |
| 250217 | DEF-US 24-01.61/02.89 (SLIDE REPAIR) | DEF | 5 | Miller Bros Const Inc | $2,611,765 | $2,906,213 | +11% | -20% | ODOT |
| 250218 | GAL-US 35-17.43 & VARIOUS (BRIDGE PAINTING) | GAL | 5 | Elite Contractors Inc | $2,290,838 | $2,401,159 | +5.0% | -18% | ODOT |
| 250230 | TUS-Maple & Church St Improve (MINOR RECONSTRUCTION) | TUS | 1 | Shelly & Sands Inc | $2,284,203 | -1.0% | ODOT | ||
| 250216 | D08-TSG-FY2025/FY2026 (SIGNALIZATION) | District 8 | 2 of 3 | Miller Cable Company | $1,965,200 | $1,996,386 | +2.0% | +2.0% | ODOT |
| 250215 | D05-Guardrail FY2025 (GUARDRAIL REBUILDING) | District 5 | 3 | M P Dory Co | $1,859,786 | $1,927,325 | +4.0% | -15% | ODOT |
| 250225 | SAN-SR-SR 53-10.45 Resurf & UrbPav (FOUR LANE RESURFACING) | SAN | 3 | Kokosing Construction Company Inc | $1,849,844 | $1,879,279 | +2.0% | -5.0% | ODOT |
| 250228 | STA-SR 687-02.30 (MINOR RECONSTRUCTION) | STA | 2 | Wenger Excavating Inc | $1,785,586 | $2,169,311 | +21% | +1.0% | ODOT |
| 250209 | ALL-Harrod Improvements (MINOR RECONSTRUCTION) | ALL | 6 | R D Jones Excavating Inc | $1,538,615 | $2,027,885 | +32% | -30% | ODOT |
| 250234 | D07-PPM FY25 (PAVEMENT MARKING) | District 7 | 2 | The Aero-Mark Company LLC | $1,076,000 | $1,175,000 | +9.0% | -25% | ODOT |
| 250224 | PIK-SR 772-19.00 (TWO LANE RESURFACING) | PIK | 3 | Fillmore Construction | $1,038,938 | $1,244,380 | +20% | -6.0% | ODOT |
| 254014 | D05-CUL FY2025 (A) (CULVERT REPLACEMENT) | District 5 | 2 | Axis Civil Construction LLC | $934,416 | $1,073,363 | +15% | -8.0% | ODOT |
| 250232 | BEL-SR 7-10.96 (SLIDE REPAIR) | BEL | 4 | Ohio-West Virginia Excavating Co | $887,121 | $1,340,581 | +51% | -21% | ODOT |
| 250220 | MAD-Maple Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | MAD | 2 | Double Z Construction Company | $798,171 | $978,851 | +23% | -6.0% | ODOT |
| 250227 | STA-Minerva Bridge (BIKEWAYS) | STA | 3 | Black Horse Bridge Construction Inc | $738,873 | $755,787 | +2.0% | -4.0% | ODOT |
| 250219 | LAW-SR 141-05.70 (CULVERT REPLACEMENT) | LAW | 4 | Skeens Excavating Inc | $662,270 | $1,038,771 | +57% | -21% | ODOT |
| 254015 | MRG-SR 78-10.96 (SLIDE REPAIR) | MRG | 2 | Alan Stone Co Inc | $646,094 | $742,457 | +15% | -2.0% | ODOT |
| 250223 | OTT-SR 2-17.69 Slope Stab. (SLIDE REPAIR) | OTT | 3 | Vernon Nagel Inc | $525,237 | $555,717 | +6.0% | -20% | ODOT |
| 250214 | CAR-Magnolia Sidewalks (SIDEWALK) | CAR | 4 | Stanley Miller Construction Company | $519,849 | $586,999 | +13% | -6.0% | ODOT |
| 250231 | WAS-SR 550-16.24 (CULVERT REPLACEMENT) | WAS | 5 | Alan Stone Co Inc | $513,554 | $544,694 | +6.0% | 0.0% | ODOT |
| 250235 | D10-RPM FY2025 (RAISED PAVEMENT MARKERS) | District 10 | 2 | A & A Safety Inc | $389,358 | $398,557 | +2.0% | -8.0% | ODOT |
| 250221 | MUS-US 40-08.35 (SIGNALIZATION) | MUS | 3 | Miller Cable Company | $269,000 | $269,544 | 0.0% | -9.0% | ODOT |
| 250226 | SCI-SR 348-17.51 (BRIDGE REPAIR) | SCI | 1 | Scioto Valley Paving LLC | $264,277 | -12% | ODOT | ||
| 250236 | D11-SP FY2025 (SPOT PATCHING / PAVEMENT REPAIR) | District 11 | 3 | Shelly & Sands Inc | $249,250 | $252,355 | +1.0% | -5.0% | ODOT |
| 250237 | DEL-SR 315 Drainage Improvements (CULVERT REPLACEMENT) | DEL | 5 | Layton Services | $235,828 | $242,542 | +3.0% | +11% | ODOT |
| 250211 | ATH-CR VAR PM FY2025 (PAVEMENT MARKING) | ATH | 3 | Griffin Pavement Striping LLC | $144,951 | $159,639 | +10% | -16% | ODOT |
| 250213 | BEL-SR 149-12.20 (SLIDE REPAIR) | BEL | 5 | Ohio-West Virginia Excavating Co | $119,136 | $154,995 | +30% | -23% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.