Skeens Excavating Inc: ODOT bid record
Skeens Excavating Inc submitted 24 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 24 APR 2025, and was the low bidder on 7 of them (29%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,986,361
- Latest bid
- 24 APR 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 3 | 38% |
| 2021 | 7 | 1 | 14% |
| 2023 | 3 | 1 | 33% |
| 2024 | 4 | 1 | 25% |
| 2025 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SCI | 5 | 1 | 20% |
| GAL | 4 | 1 | 25% |
| VIN | 3 | 0 | 0% |
| PIK | 3 | 2 | 67% |
| LAW | 3 | 1 | 33% |
| BEL | 2 | 0 | 0% |
| JAC | 2 | 1 | 50% |
| MEG | 1 | 0 | 0% |
| ROS | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 24 | 24 (100%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 23 | 16 (70%) | $400.00 | $850.00 |
| Seeding and mulching | 659E10000 | SY | 21 | 13 (62%) | $2.00 | $2.60 |
| Water | 659E35000 | MGAL | 22 | 11 (50%) | $5.50 | $1.00 |
| Excavation | 203E10000 | CY | 16 | 10 (63%) | $20.00 | $27.00 |
| Aggregate base | 304E20000 | CY | 19 | 7 (37%) | $100.00 | $90.00 |
| Field office, type A | 619E16000 | MNTH | 6 | 6 (100%) | $100.00 | $1,400.00 |
| Embankment | 203E20000 | CY | 18 | 5 (28%) | $22.50 | $25.00 |
| Lime | 659E31000 | ACRE | 22 | 4 (18%) | $400.00 | $150.00 |
| Repair seeding and mulching | 659E14000 | SY | 13 | 4 (31%) | $2.00 | $1.25 |
| Subgrade compaction | 204E10000 | SY | 17 | 3 (18%) | $5.00 | $3.00 |
| Center line, type 1 | 642E00300 | MI | 12 | 3 (25%) | $18,500 | $5,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| R C Construction Company and Son Inc | 15 | 1 of 15 |
| D G M Inc | 14 | 5 of 14 |
| Alan Stone Co Inc | 13 | 6 of 13 |
| Axis Civil Construction LLC | 13 | 4 of 13 |
| Shelly & Sands Inc | 8 | 3 of 8 |
| Allard Excavation LLC | 8 | 5 of 8 |
| Eclipse Co LLC | 7 | 1 of 7 |
| Ohio-West Virginia Excavating Co | 5 | 3 of 5 |
| Parker Corporation | 4 | 3 of 4 |
| Distel Construction Inc | 4 | 3 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2025 | 250219 | LAW | LAW-SR 141-05.70 (CULVERT REPLACEMENT) | 1 of 4 | $662,270 | Low, 57% under the second |
| 16 JAN 2025 | 250039 | VIN | VIN-SR 328-08.97 (SLIDE REPAIR) | 7 of 7 | $259,029 | +66% |
| 13 JUN 2024 | 240330 | PIK | PIK-CR 57-00.62 (CULVERT REPLACEMENT) | 2 of 6 | $342,922 | +12% |
| 04 APR 2024 | 240213 | JAC | JAC-SR 279-04.06 (CULVERT REPLACEMENT) | 3 of 7 | $349,904 | +5.0% |
| 25 JAN 2024 | 240054 | JAC | JAC-SR 139-03.17 (CULVERT REPLACEMENT) | 1 of 6 | $345,129 | Low, 2.0% under the second |
| 11 JAN 2024 | 240041 | VIN | VIN-SR 328-06.42 (CULVERT REPLACEMENT) | 2 of 7 | $225,891 | +4.0% |
| 08 NOV 2023 | 232001 | LAW | LAW-Chesapeake Building Demo 4 (DEMOLITION) | 3 of 7 | $310,151 | +16% |
| 27 APR 2023 | 230282 | SCI | SCI-Shawnee SF (CULVERT REPLACEMENT) | 2 of 4 | $435,607 | 0.0% |
| 13 APR 2023 | 230239 | ROS | ROS-Tar Hollow ODNR FY23 (CULVERT REPLACEMENT) | 1 of 4 | $226,791 | Low, 35% under the second |
| 02 DEC 2021 | 210639 | PIK | PIK-US 23-15.35 Liner (CULVERT REPLACEMENT) | 1 of 8 | $113,466 | Low, 50% under the second |
| 14 OCT 2021 | 210559 | GAL | GAL-SR 218-10.26 (SLIDE REPAIR) | 3 of 10 | $584,001 | +1.0% |
| 11 MAR 2021 | 210153 | BEL | BEL-US 250-07.65 (SLIDE REPAIR) | 6 of 6 | $482,315 | +94% |
| 11 MAR 2021 | 210166 | GAL | GAL-US 35-13.07 (SLIDE REPAIR) | 6 of 7 | $520,644 | +28% |
| 11 MAR 2021 | 217002 | BEL | BEL-CR 214-06.58 (SLIDE REPAIR) | 6 of 8 | $262,417 | +76% |
| 11 FEB 2021 | 210111 | SCI | SCI-Shawnee State Forest Culvert (CULVERT REPLACEMENT) | 4 of 10 | $197,700 | +49% |
| 28 JAN 2021 | 210072 | SCI | SCI-SR 348-09.42 (CULVERT REPLACEMENT) | 9 of 9 | $678,646 | +49% |
| 17 DEC 2020 | 200605 | SCI | SCI-Riverfront Multi-Use Path (BIKEWAYS) | 4 of 6 | $795,640 | +4.0% |
| 27 AUG 2020 | 200443 | LAW | LAW-CR 169-00.41 (CULVERT REPLACEMENT) | 5 of 10 | $360,038 | +17% |
| 23 APR 2020 | 207021 | MEG | MEG-SR 7-18.70 (SLIDE REPAIR) | 3 of 5 | $196,940 | +58% |
| 12 MAR 2020 | 200148 | SCI | SCI-SR 140-02.16 Safety (SPOT SAFETY) | 1 of 5 | $100,604 | Low, 89% under the second |
| 27 FEB 2020 | 207012 | GAL | GAL-SR 553-00.70 (SLIDE REPAIR) | 2 of 4 | $939,915 | +1.0% |
| 13 FEB 2020 | 200072 | PIK | PIK-CR 66-02.12 OH18-01 (SLIDE REPAIR) | 1 of 4 | $69,004 | Low, 24% under the second |
| 13 FEB 2020 | 207008 | GAL | GAL-US 35 14.800 (SLIDE REPAIR) | 1 of 8 | $469,097 | Low, 5.0% under the second |
| 23 JAN 2020 | 207004 | VIN | VIN-SR 160-16.64 (SLIDE REPAIR) | 2 of 8 | $386,244 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.