Parker Corporation: ODOT bid record

Parker Corporation submitted 65 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 01 OCT 2026, and was the low bidder on 32 of them (49%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$10,938,045
Latest bid
01 OCT 2026
Data through
12 NOV 2026
65Bids
32Low bids
49Win rate, percent
+14%Median gap to the low bid when not low, 33 bids

By year

YearBidsLow bidsWin rate
202016744%
202110330%
202213862%
20236467%
20249667%
20256350%
20265120%
Parker Corporation, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MEG10550%
VIN9444%
NOB8338%
GAL8450%
ATH6350%
WAS6233%
HOC5360%
District 104375%
MRG4250%
MOE200%
JAC22100%
ROS11100%
Parker Corporation, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH6565 (100%)$1.00$1.00
Subgrade compaction204E10000SY5151 (100%)$0.50$3.00
Seeding and mulching659E10000SY5748 (84%)$1.00$2.60
Aggregate base304E20000CY5437 (69%)$65.00$90.00
Object marker, two way614E13360EACH3330 (91%)$10.00$21.00
Portable barrier, unanchored622E41100FT3230 (94%)$10.00$24.34
Edge line, 6", type 1642E00104MI4629 (63%)$4,412.50$3,200.00
Aggregate drains605E31100FT3429 (85%)$10.00$20.00
Center line, type 1642E00300MI4628 (61%)$7,675.00$5,500.00
Rock channel protection, type B with filter601E32100CY3328 (85%)$65.00$133.61
Type 2 waterproofing512E33000SY2826 (93%)$14.00$30.00
Water659E35000MGAL2422 (92%)$0.50$1.00
Parker Corporation, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Axis Civil Construction LLC4916 of 49
Alan Stone Co Inc3910 of 39
R C Construction Company and Son Inc388 of 38
Shelly & Sands Inc256 of 25
Ohio-West Virginia Excavating Co252 of 25
Eclipse Co LLC251 of 25
D G M Inc227 of 22
Allard Excavation LLC127 of 12
Buds Inc125 of 12
Amaazz Construction Ohio LLC94 of 9
Parker Corporation, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)7 of 7$906,198+40%
13 AUG 2026260361GALGAL-SR 218-04.81/08.56 (CULVERT REPLACEMENT)2 of 4$912,685+2.0%
16 JUL 2026264018MRGMRG-SR 669-02.09 (CULVERT REPLACEMENT)3 of 4$427,810+16%
23 APR 2026260224VINVIN-Tar Hollow Culvert (CULVERT REPLACEMENT)4 of 6$456,083+14%
19 FEB 2026260085GALGAL-Mercerville Shared Use Path (SIDEWALK)1 of 2$910,932Low, 11% under the second
04 DEC 2025254031MEGMEG-SR 733-01.13 (CULVERT REPLACEMENT)1 of 4$419,341Low, 17% under the second
14 AUG 2025250383WASWAS-Beverly Sidewalk (SIDEWALK)6 of 8$447,369+37%
22 MAY 2025250298ROSROS-Tar Hollow SF Culverts FY25 (CULVERT REPLACEMENT)1 of 5$193,222Low, 1.0% under the second
24 APR 2025250231WASWAS-SR 550-16.24 (CULVERT REPLACEMENT)2 of 5$544,694+6.0%
16 JAN 2025250011GALGAL-SR 218/VAR-14.77/VAR (CULVERT REPLACEMENT)1 of 4$997,612Low, 5.0% under the second
16 JAN 2025250039VINVIN-SR 328-08.97 (SLIDE REPAIR)5 of 7$195,403+25%
17 OCT 2024240475WASWAS-SR 339-08.64 (CULVERT REPLACEMENT)3 of 6$911,834+8.0%
25 JUL 2024240388MRGMRG-SR 376-14.59 (CULVERT REPLACEMENT)1 of 6$335,562Low, 1.0% under the second
27 JUN 2024240351NOBNOB-CR 250-00.04 (CULVERT REPLACEMENT)3 of 4$307,146+14%
18 APR 2024240249ATHATH-Wallace O'Dowd WLA (MISCELLANEOUS)1 of 6$302,697Low, 2.0% under the second
21 MAR 2024240190VINVIN-US 50-28.74 (CULVERT REPLACEMENT)1 of 5$519,777Low, 11% under the second
08 FEB 2024240098MEGMEG-SR 689-01.87 (CULVERT REPLACEMENT)1 of 4$296,473Low, 10% under the second
25 JAN 2024240052HOCHOC-SR 278-05.47 (CULVERT REPLACEMENT)1 of 6$327,806Low, 27% under the second
11 JAN 2024240011HOCHOC-SR 328-06.22 (CULVERT REPLACEMENT)2 of 7$266,913+3.0%
11 JAN 2024240041VINVIN-SR 328-06.42 (CULVERT REPLACEMENT)1 of 7$216,718Low, 4.0% under the second
30 NOV 2023230587NOBNOB-SR 146-01.95 (CULVERT REPLACEMENT)4 of 9$370,619+10%
25 MAY 2023234017GALGAL-SR 218-09.28 (CULVERT REPLACEMENT)1 of 4$375,661Low, 9.0% under the second
09 MAR 2023230123JACJAC-SR 279-08.76 Culvert Replace (CULVERT REPLACEMENT)1 of 5$148,800Low, 4.0% under the second
09 MAR 2023230153HOCHOC-SR 664-16.51 (CULVERT REPLACEMENT)1 of 10$449,247Low, 4.0% under the second
23 FEB 2023230128NOBNOB-SR 821-18.71 (CULVERT REPLACEMENT)1 of 8$195,618Low, 8.0% under the second
Parker Corporation: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy