ODOT letting results, February 8, 2024
38 contracts let by Ohio DOT on February 8, 2024, $82,023,775 in low bids, a median of 2 bidders per contract. On the 38 with an engineer's estimate, the low bid came in under it 23 times; median low bid -6.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 38
- Low bids, total
- $82,023,775
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240090 | HAM-US 50-29.00 (BRIDGE REPAIR) | HAM | 3 | Eagle Bridge Co | $14,824,589 | $15,188,009 | +2.0% | -6.0% | ODOT |
| 240087 | FRA-SR 16-06.87 (at S-Hamilton) (INTERSECTION) | FRA | 3 | Shelly & Sands Inc | $6,680,186 | $6,866,121 | +3.0% | +15% | ODOT |
| 240085 | D07-BP/BH FY24 (BRIDGE PAINTING) | District 7 | 7 | Euro Paint LLC | $5,541,039 | $5,677,637 | +2.0% | -26% | ODOT |
| 240084 | D04-MCRO FY2024 (MICROSURFACING) | District 4 | 1 | Strawser Construction Inc | $5,484,351 | +22% | ODOT | ||
| 240091 | HAN-/WYA-US 68/SR 15/US 23-Var. (MICROSURFACING) | HAN | 1 | Strawser Construction Inc | $4,516,631 | +10% | ODOT | ||
| 240120 | D12-BH FY2024 Misc (BRIDGE REPAIR) | District 12 | 1 | Catts Construction Inc | $4,430,597 | +17% | ODOT | ||
| 240111 | WAS-SR 821-04.444 (TWO LANE RESURFACING) | WAS | 2 | Shelly & Sands Inc | $4,343,300 | $5,309,226 | +22% | +6.0% | ODOT |
| 240094 | JAC-SR 32-06.40 (PART 1 AND PART 2) (INTERSECTION) | JAC | 1 | Shelly & Sands Inc | $4,206,992 | +20% | ODOT | ||
| 240088 | FUL-/HEN-SR 2/SR 66-04.86/01.88 (TWO LANE RESURFACING) | FUL | 1 | Gerken Paving Inc | $3,312,886 | -11% | ODOT | ||
| 240116 | D07-FDPM FY24 (PAVEMENT MARKING) | District 7 | 2 | The Aero-Mark Company LLC | $3,180,000 | $3,251,509 | +2.0% | -9.0% | ODOT |
| 240086 | DEF-US 127/SR 18/SR 66/SR 281 VAR. (TWO LANE RESURFACING) | DEF | 1 | Gerken Paving Inc | $2,760,093 | +9.0% | ODOT | ||
| 240096 | LIC-IR 70-10.77 AND VARIOUS (BRIDGE REPAIR) | LIC | 3 | Miller Bros Const Inc | $2,330,393 | $2,395,292 | +3.0% | -13% | ODOT |
| 240102 | PER-SR 93-04.96 AND VAR (BRIDGE REPAIR) | PER | 3 | George J Igel & Co Inc | $2,147,527 | $2,243,083 | +4.0% | -9.0% | ODOT |
| 240104 | ROS-US 23-18.35 (FOUR LANE RESURFACING) | ROS | 2 | Shelly Company | $2,144,364 | $2,684,487 | +25% | +11% | ODOT |
| 240097 | MAR-SR 739/SR 47-00.00/08.56 (TWO LANE RESURFACING) | MAR | 2 | Kokosing Construction Company Inc | $1,647,498 | $1,680,614 | +2.0% | -4.0% | ODOT |
| 240121 | LAK-IR 90/SR 528 Signals (INTERSECTION) | LAK | 2 | Eclipse Co LLC | $1,628,389 | $1,733,419 | +6.0% | +23% | ODOT |
| 240118 | D09-GR-FY2024 (GUARDRAIL REBUILDING) | District 9 | 2 | PDK Construction Inc | $1,262,931 | $1,403,775 | +11% | -10% | ODOT |
| 240112 | WAY-US 30-11.64 (SPOT PATCHING / PAVEMENT REPAIR) | WAY | 7 | Smith Paving & Excavating Inc | $1,140,977 | $1,227,722 | +8.0% | -6.0% | ODOT |
| 240082 | CLE-US 50/SR 132-07.68/15.85 (TWO LANE RESURFACING) | CLE | 2 | Barrett Paving Materials Inc | $1,089,230 | $1,139,576 | +5.0% | -5.0% | ODOT |
| 240109 | UNI-SR 37-06.34 (TWO LANE RESURFACING) | UNI | 2 | Kokosing Construction Company Inc | $1,058,872 | $1,187,526 | +12% | -15% | ODOT |
| 240095 | LAW-SR 141-16.94 (CULVERT REPLACEMENT) | LAW | 3 | Axis Civil Construction LLC | $794,193 | $882,910 | +11% | -8.0% | ODOT |
| 240114 | D05-CS FY2024 (CRACK SEALING) | District 5 | 4 of 5 | The Aero-Mark Company LLC | $793,074 | $803,905 | +1.0% | +22% | ODOT |
| 240108 | TUS-Towpath Trail Improvements (BIKEWAYS) | TUS | 13 of 14 | Double B Excavating LLC | $717,082 | $732,938 | +2.0% | -17% | ODOT |
| 248002 | HAM-IR 275-30.01 (SPOT SAFETY) | HAM | 2 | John R Jurgensen Company | $693,260 | $776,000 | +12% | +11% | ODOT |
| 240092 | HIG-SR 247-00.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | HIG | 6 | Coopers Excavating LLC | $622,280 | $847,045 | +36% | -25% | ODOT |
| 240083 | D03-BH FY2024 (A) (BRIDGE REPAIR) | District 3 | 3 | Catts Construction Inc | $584,895 | $594,602 | +2.0% | -22% | ODOT |
| 240081 | ATH-US 50-04.75 (SIGNALIZATION) | ATH | 3 | Axis Civil Construction LLC | $555,710 | $634,741 | +14% | +6.0% | ODOT |
| 240115 | D05-PM FY2024 (C) Epoxy (PAVEMENT MARKING) | District 5 | 3 | Oglesby Construction Inc | $536,387 | $748,950 | +40% | -29% | ODOT |
| 240101 | NOB-SR 78-07.15 Safety (SPOT SAFETY) | NOB | 3 | Shelly & Sands Inc | $438,088 | $464,964 | +6.0% | +1.0% | ODOT |
| 240122 | MOE-CR 29-07.02 (TWO LANE RESURFACING) | MOE | 2 | Shelly & Sands Inc | $415,330 | $506,725 | +22% | -11% | ODOT |
| 240099 | MOT-Wolf Creek St. Resurfacing (TWO LANE RESURFACING) | MOT | 2 | Barrett Paving Materials Inc | $402,500 | $413,753 | +3.0% | -1.0% | ODOT |
| 240117 | D07-GR FY 2024 (GUARDRAIL REBUILDING) | District 7 | 2 | Lake Erie Construction Company | $393,630 | $397,855 | +1.0% | -12% | ODOT |
| 240105 | STA-SR 225-02.65 Slide (SLIDE REPAIR) | STA | 6 | Craig Edward Susany Inc | $338,805 | $387,055 | +14% | -45% | ODOT |
| 240098 | MEG-SR 689-01.87 (CULVERT REPLACEMENT) | MEG | 4 | Parker Corporation | $296,473 | $326,179 | +10% | -14% | ODOT |
| 240123 | RIC-SR 309-08.73 (BRIDGE REPAIR) | RIC | 2 | Evers Steel Construction LLC | $232,126 | $314,588 | +36% | +20% | ODOT |
| 240119 | D11-DS-FY2024 (BRIDGE REPAIR) | District 11 | 6 | Catts Construction Inc | $203,150 | $233,779 | +15% | -22% | ODOT |
| 244005 | HUR-SR 61-05.62 (CULVERT REPLACEMENT) | HUR | 4 | BCC Ohio Inc | $158,212 | $260,853 | +65% | -46% | ODOT |
| 240113 | D03-LG FY2024(A) (LIGHTING) | District 3 | 2 | Perram Electric Inc | $117,735 | $138,500 | +18% | +1.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.