PDK Construction Inc: ODOT bid record

PDK Construction Inc submitted 37 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 01 OCT 2026, and was the low bidder on 20 of them (54%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$19,074,231
Latest bid
01 OCT 2026
Data through
12 NOV 2026
37Bids
20Low bids
54Win rate, percent
+7.0%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
20205360%
20218450%
20226117%
20237229%
202444100%
20254375%
202633100%
PDK Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 1010550%
District 97571%
District 114125%
MRG3133%
ROS22100%
VIN22100%
District 5200%
PER22100%
MEG11100%
MOE100%
KNO100%
TRU11100%
PDK Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Anchor assembly, MGS type T606E26550EACH2820 (71%)$1,065.00$1,260.00
Bridge terminal assembly, type 4606E35140EACH1817 (94%)$625.00$930.00
Guardrail removed for storage, as per plan202E38101FT1716 (94%)$1.80$2.00
Erosion control832E30000EACH1616 (100%)$1.00$1.00
Guardrail, type MGS606E15050FT2415 (63%)$16.72$22.73
Anchor assembly, MGS type A606E25550EACH2212 (55%)$1,345.00$1,500.00
MGS bridge terminal assembly, type 1606E35002EACH1411 (79%)$1,905.00$2,400.00
Anchor assembly, MGS type E, MASH 2016606E26150EACH1211 (92%)$2,230.00$2,575.00
Guardrail removed202E38000FT2210 (45%)$1.75$2.50
Impact attenuator, type 1 (bidirectional)606E60012EACH1210 (83%)$4,350.00$5,450.00
Guardrail, type 5606E13000FT169 (56%)$17.74$20.40
Anchor assembly, type T606E26500EACH159 (60%)$880.00$1,000.00
PDK Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Lake Erie Construction Company3715 of 37
M P Dory Co287 of 28
Cuyahoga Fence LLC131 of 13
PDK Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260446District 9D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING)1 of 4$956,186Low, 4.0% under the second
11 JUN 2026260289PERPER-CR VAR GR FY2027 (GUARDRAIL REBUILDING)1 of 3$249,367Low, 0.0% under the second
29 JAN 2026260073District 9D09-GR-FY2026 (GUARDRAIL REBUILDING)1 of 3$915,499Low, 12% under the second
23 OCT 2025250494District 10D10-General System GR FY2026 (GUARDRAIL REBUILDING)1 of 3$2,243,023Low, 8.0% under the second
13 FEB 2025250111District 11D11-GR FY2025 (GUARDRAIL REBUILDING)2 of 2$1,466,738+4.0%
30 JAN 2025250045District 10D10-General System GR FY2025 (GUARDRAIL REBUILDING)1 of 3$2,238,495Low, 8.0% under the second
16 JAN 2025250033District 9D09-Guardrail Project FY2025 (GUARDRAIL REBUILDING)1 of 4$608,511Low, 15% under the second
14 NOV 2024240534ROSROS-GR-FY2025(C.R.) (GUARDRAIL REBUILDING)1 of 3$222,333Low, 12% under the second
04 APR 2024240224VINVIN-CR VAR GR FY24 (PART 1 AND PART 2) (GUARDRAIL REBUILDING)1 of 3$525,620Low, 12% under the second
08 FEB 2024240118District 9D09-GR-FY2024 (GUARDRAIL REBUILDING)1 of 2$1,262,931Low, 11% under the second
25 JAN 2024240060MRGMRG-CR Guardrail FY 2024 (B) (GUARDRAIL REBUILDING)1 of 4$175,298Low, 11% under the second
28 SEP 2023230464District 10D10-General System GR FY2024 (GUARDRAIL REBUILDING)2 of 3$3,465,938+7.0%
14 SEP 2023230452MRGMRG-CR Guardrail FY 2024 (GUARDRAIL REBUILDING)2 of 4$168,9690.0%
27 JUL 2023230387District 1D01-GR FY2024 (GUARDRAIL REBUILDING)3 of 3$1,729,627+22%
22 JUN 2023230378TRUTRU-GR FY2024 (Systematic) (GUARDRAIL REBUILDING)1 of 4$334,055Low, 2.0% under the second
11 MAY 2023230312District 9D09-GR-FY2023 (GUARDRAIL REBUILDING)1 of 3$1,178,441Low, 14% under the second
11 MAY 2023230315KNOKNO-SR 3-19.76 (GUARDRAIL REBUILDING)2 of 4$861,741+1.0%
09 MAR 2023230147District 11D11-GR-FY2023 (GUARDRAIL REBUILDING)2 of 3$2,026,986+10%
17 NOV 2022220615MOEMOE-CR VAR-GR FY2023 (GUARDRAIL REBUILDING)2 of 3$276,655+1.0%
03 NOV 2022220573District 10D10-General System GR FY2023 (GUARDRAIL REBUILDING)1 of 3$1,718,114Low, 2.0% under the second
13 OCT 2022220562District 5D05-Guardrail FY2023 (GUARDRAIL REBUILDING)2 of 4$1,384,821+7.0%
25 AUG 2022220495District 10D10-GR CAL2023 DD (GUARDRAIL REBUILDING)2 of 3$390,124+3.0%
12 MAY 2022220319District 9D09-GR-FY2022 (GUARDRAIL REBUILDING)2 of 2$1,269,715+7.0%
31 MAR 2022220224District 11D11-GR-FY2022 (GUARDRAIL REBUILDING)2 of 3$3,802,067+6.0%
16 DEC 2021210659District 10D10-GR-FY2022 (GUARDRAIL REBUILDING)1 of 2$2,664,328Low, 4.0% under the second
PDK Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy