PDK Construction Inc: ODOT bid record
PDK Construction Inc submitted 37 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 01 OCT 2026, and was the low bidder on 20 of them (54%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $19,074,231
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 3 | 60% |
| 2021 | 8 | 4 | 50% |
| 2022 | 6 | 1 | 17% |
| 2023 | 7 | 2 | 29% |
| 2024 | 4 | 4 | 100% |
| 2025 | 4 | 3 | 75% |
| 2026 | 3 | 3 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 10 | 10 | 5 | 50% |
| District 9 | 7 | 5 | 71% |
| District 11 | 4 | 1 | 25% |
| MRG | 3 | 1 | 33% |
| ROS | 2 | 2 | 100% |
| VIN | 2 | 2 | 100% |
| District 5 | 2 | 0 | 0% |
| PER | 2 | 2 | 100% |
| MEG | 1 | 1 | 100% |
| MOE | 1 | 0 | 0% |
| KNO | 1 | 0 | 0% |
| TRU | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Anchor assembly, MGS type T | 606E26550 | EACH | 28 | 20 (71%) | $1,065.00 | $1,260.00 |
| Bridge terminal assembly, type 4 | 606E35140 | EACH | 18 | 17 (94%) | $625.00 | $930.00 |
| Guardrail removed for storage, as per plan | 202E38101 | FT | 17 | 16 (94%) | $1.80 | $2.00 |
| Erosion control | 832E30000 | EACH | 16 | 16 (100%) | $1.00 | $1.00 |
| Guardrail, type MGS | 606E15050 | FT | 24 | 15 (63%) | $16.72 | $22.73 |
| Anchor assembly, MGS type A | 606E25550 | EACH | 22 | 12 (55%) | $1,345.00 | $1,500.00 |
| MGS bridge terminal assembly, type 1 | 606E35002 | EACH | 14 | 11 (79%) | $1,905.00 | $2,400.00 |
| Anchor assembly, MGS type E, MASH 2016 | 606E26150 | EACH | 12 | 11 (92%) | $2,230.00 | $2,575.00 |
| Guardrail removed | 202E38000 | FT | 22 | 10 (45%) | $1.75 | $2.50 |
| Impact attenuator, type 1 (bidirectional) | 606E60012 | EACH | 12 | 10 (83%) | $4,350.00 | $5,450.00 |
| Guardrail, type 5 | 606E13000 | FT | 16 | 9 (56%) | $17.74 | $20.40 |
| Anchor assembly, type T | 606E26500 | EACH | 15 | 9 (60%) | $880.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lake Erie Construction Company | 37 | 15 of 37 |
| M P Dory Co | 28 | 7 of 28 |
| Cuyahoga Fence LLC | 13 | 1 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260446 | District 9 | D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING) | 1 of 4 | $956,186 | Low, 4.0% under the second |
| 11 JUN 2026 | 260289 | PER | PER-CR VAR GR FY2027 (GUARDRAIL REBUILDING) | 1 of 3 | $249,367 | Low, 0.0% under the second |
| 29 JAN 2026 | 260073 | District 9 | D09-GR-FY2026 (GUARDRAIL REBUILDING) | 1 of 3 | $915,499 | Low, 12% under the second |
| 23 OCT 2025 | 250494 | District 10 | D10-General System GR FY2026 (GUARDRAIL REBUILDING) | 1 of 3 | $2,243,023 | Low, 8.0% under the second |
| 13 FEB 2025 | 250111 | District 11 | D11-GR FY2025 (GUARDRAIL REBUILDING) | 2 of 2 | $1,466,738 | +4.0% |
| 30 JAN 2025 | 250045 | District 10 | D10-General System GR FY2025 (GUARDRAIL REBUILDING) | 1 of 3 | $2,238,495 | Low, 8.0% under the second |
| 16 JAN 2025 | 250033 | District 9 | D09-Guardrail Project FY2025 (GUARDRAIL REBUILDING) | 1 of 4 | $608,511 | Low, 15% under the second |
| 14 NOV 2024 | 240534 | ROS | ROS-GR-FY2025(C.R.) (GUARDRAIL REBUILDING) | 1 of 3 | $222,333 | Low, 12% under the second |
| 04 APR 2024 | 240224 | VIN | VIN-CR VAR GR FY24 (PART 1 AND PART 2) (GUARDRAIL REBUILDING) | 1 of 3 | $525,620 | Low, 12% under the second |
| 08 FEB 2024 | 240118 | District 9 | D09-GR-FY2024 (GUARDRAIL REBUILDING) | 1 of 2 | $1,262,931 | Low, 11% under the second |
| 25 JAN 2024 | 240060 | MRG | MRG-CR Guardrail FY 2024 (B) (GUARDRAIL REBUILDING) | 1 of 4 | $175,298 | Low, 11% under the second |
| 28 SEP 2023 | 230464 | District 10 | D10-General System GR FY2024 (GUARDRAIL REBUILDING) | 2 of 3 | $3,465,938 | +7.0% |
| 14 SEP 2023 | 230452 | MRG | MRG-CR Guardrail FY 2024 (GUARDRAIL REBUILDING) | 2 of 4 | $168,969 | 0.0% |
| 27 JUL 2023 | 230387 | District 1 | D01-GR FY2024 (GUARDRAIL REBUILDING) | 3 of 3 | $1,729,627 | +22% |
| 22 JUN 2023 | 230378 | TRU | TRU-GR FY2024 (Systematic) (GUARDRAIL REBUILDING) | 1 of 4 | $334,055 | Low, 2.0% under the second |
| 11 MAY 2023 | 230312 | District 9 | D09-GR-FY2023 (GUARDRAIL REBUILDING) | 1 of 3 | $1,178,441 | Low, 14% under the second |
| 11 MAY 2023 | 230315 | KNO | KNO-SR 3-19.76 (GUARDRAIL REBUILDING) | 2 of 4 | $861,741 | +1.0% |
| 09 MAR 2023 | 230147 | District 11 | D11-GR-FY2023 (GUARDRAIL REBUILDING) | 2 of 3 | $2,026,986 | +10% |
| 17 NOV 2022 | 220615 | MOE | MOE-CR VAR-GR FY2023 (GUARDRAIL REBUILDING) | 2 of 3 | $276,655 | +1.0% |
| 03 NOV 2022 | 220573 | District 10 | D10-General System GR FY2023 (GUARDRAIL REBUILDING) | 1 of 3 | $1,718,114 | Low, 2.0% under the second |
| 13 OCT 2022 | 220562 | District 5 | D05-Guardrail FY2023 (GUARDRAIL REBUILDING) | 2 of 4 | $1,384,821 | +7.0% |
| 25 AUG 2022 | 220495 | District 10 | D10-GR CAL2023 DD (GUARDRAIL REBUILDING) | 2 of 3 | $390,124 | +3.0% |
| 12 MAY 2022 | 220319 | District 9 | D09-GR-FY2022 (GUARDRAIL REBUILDING) | 2 of 2 | $1,269,715 | +7.0% |
| 31 MAR 2022 | 220224 | District 11 | D11-GR-FY2022 (GUARDRAIL REBUILDING) | 2 of 3 | $3,802,067 | +6.0% |
| 16 DEC 2021 | 210659 | District 10 | D10-GR-FY2022 (GUARDRAIL REBUILDING) | 1 of 2 | $2,664,328 | Low, 4.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.