Cuyahoga Fence LLC: ODOT bid record

Cuyahoga Fence LLC submitted 45 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 12 of them (27%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$11,789,293
Latest bid
01 OCT 2026
Data through
12 NOV 2026
45Bids
12Low bids
27Win rate, percent
+12%Median gap to the low bid when not low, 33 bids

By year

YearBidsLow bidsWin rate
20209111%
2021700%
20225120%
20239333%
20244375%
20258338%
20263133%
Cuyahoga Fence LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 49222%
District 36117%
District 124375%
District 2300%
District 5300%
District 82150%
District 72150%
TRU2150%
MRG2150%
District 9200%
MEG100%
LIC11100%
Cuyahoga Fence LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2929 (100%)$1.00$1.00
Anchor assembly, MGS type T606E26550EACH3825 (66%)$1,050.00$1,260.00
Guardrail, misc.:impact attenuator, BI-directional606E98100EACH3019 (63%)$275.00$275.00
Guardrail, misc.:anchor assembly, type E, (MASH 20606E98100EACH2817 (61%)$210.00$225.00
Guardrail removed202E38000FT2515 (60%)$2.00$2.50
Maintenance of traffic, one lane closure on A 4 lane or greater divided highway614E13800EACH1915 (79%)$200.00$580.00
Anchor assembly, MGS type B606E26050EACH2013 (65%)$2,060.00$2,225.00
Anchor assembly rebuilt, MGS type E, as per plan606E27861EACH4011 (28%)$300.00$320.00
MGS bridge terminal assembly, type 1606E35002EACH2410 (42%)$2,325.00$2,400.00
Guardrail, type MGS606E15050FT2010 (50%)$21.00$22.73
Anchor assembly, MGS type A606E25550EACH1910 (53%)$1,300.00$1,500.00
Maintenance of traffic, one lane closure on A four lane undivided highway614E13700EACH1410 (71%)$155.00$500.00
Cuyahoga Fence LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Lake Erie Construction Company4428 of 44
M P Dory Co188 of 18
PDK Construction Inc1312 of 13
Shook Company LLC22 of 2
Security Fence Group Inc11 of 1
RMD Holdings LTD10 of 1
Cuyahoga Fence LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260446District 9D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING)2 of 4$992,225+4.0%
17 SEP 2026260415District 3D03-GR FY2027 (GUARDRAIL REBUILDING)2 of 2$1,166,676+5.0%
27 AUG 2026260397TRUTRU-GR FY2027 (Systematic) (GUARDRAIL REBUILDING)1 of 2$730,329Low, 3.0% under the second
18 DEC 2025250602District 3D03-GR FY2026 (GUARDRAIL REBUILDING)2 of 2$1,098,959+7.0%
13 NOV 2025250540District 4D04-GR FY2026 (WO) (GUARDRAIL REBUILDING)1 of 2$1,862,391Low, 0.0% under the second
28 AUG 2025250400District 2D02-GR FY2026 (GUARDRAIL REBUILDING)2 of 2$1,254,753+13%
26 JUN 2025250329District 5D05-GR FY2026 (Ding N Dent) (GUARDRAIL REBUILDING)2 of 3$1,186,443+3.0%
24 APR 2025250215District 5D05-Guardrail FY2025 (GUARDRAIL REBUILDING)3 of 3$2,085,751+12%
10 APR 2025250205District 8D08-SAFETY GR FY25 (GUARDRAIL REBUILDING)1 of 2$885,264Low, 27% under the second
30 JAN 2025250068District 4D04-GR FY2025 (WO) (GUARDRAIL REBUILDING)1 of 2$1,766,499Low, 12% under the second
16 JAN 2025250033District 9D09-Guardrail Project FY2025 (GUARDRAIL REBUILDING)4 of 4$796,860+31%
26 SEP 2024240453District 3D03-GR FY2025 (GUARDRAIL REBUILDING)1 of 2$824,421Low, 5.0% under the second
09 MAY 2024248003District 12D12-GR FY2024 (GUARDRAIL REBUILDING)1 of 2$2,654,030Low, 2.0% under the second
25 JAN 2024240048FAIFAI-/FRA-US 33-00.00/30.06 (GUARDRAIL REBUILDING)1 of 3$1,020,207Low, 4.0% under the second
25 JAN 2024240060MRGMRG-CR Guardrail FY 2024 (B) (GUARDRAIL REBUILDING)2 of 4$194,768+11%
09 NOV 2023230556District 3D03-GR FY2024 (GUARDRAIL REBUILDING)2 of 2$845,365+3.0%
12 OCT 2023230487District 7D07-GR Type A Replacement (GUARDRAIL REBUILDING)4 of 4$285,598+18%
14 SEP 2023230452MRGMRG-CR Guardrail FY 2024 (GUARDRAIL REBUILDING)1 of 4$168,661Low, 0.0% under the second
22 JUN 2023230378TRUTRU-GR FY2024 (Systematic) (GUARDRAIL REBUILDING)2 of 4$339,478+2.0%
11 MAY 2023230315KNOKNO-SR 3-19.76 (GUARDRAIL REBUILDING)4 of 4$1,024,649+20%
27 APR 2023234014District 12D12-GR FY2023 (GUARDRAIL REBUILDING)1 of 1$920,108Low
09 MAR 2023230147District 11D11-GR-FY2023 (GUARDRAIL REBUILDING)3 of 3$2,213,167+20%
23 FEB 2023230135District 7D07-GR FY 2023 (GUARDRAIL REBUILDING)1 of 3$420,031Low, 12% under the second
09 FEB 2023230106District 4D04-GR FY2023 (WO) (GUARDRAIL REBUILDING)2 of 3$1,904,763+2.0%
13 OCT 2022220560District 3D03-GR FY2023 (GUARDRAIL REBUILDING)2 of 2$911,074+4.0%
Cuyahoga Fence LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy