ODOT letting results, April 10, 2025

22 contracts let by Ohio DOT on April 10, 2025, $95,401,302 in low bids, a median of 3 bidders per contract. On the 22 with an engineer's estimate, the low bid came in under it 12 times; median low bid -3.0% against the estimate.

Owner
Ohio DOT
Contracts
22
Low bids, total
$95,401,302
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250186ATH-US 33-18.78 (MAJOR WIDENING)ATH1Kokosing Construction Company Inc$61,334,604+6.0%ODOT
250189BUT-SR 126-02.92 (SLIDE REPAIR)BUT5Beaty Construction Inc$5,163,250$5,397,265+5.0%+35%ODOT
250194HUR-US 250/SR 61-00.75/VAR (TWO LANE RESURFACING)HUR2Gerken Paving Inc$4,887,128$5,115,588+5.0%0.0%ODOT
250185ATH-US 50-33.58 (INTERSECTION)ATH3Axis Civil Construction LLC$3,195,538$3,469,964+9.0%-2.0%ODOT
250190CUY-Villaview Road (MINOR RECONSTRUCTION)CUY3Ronyak Paving Inc$2,898,675$3,194,153+10%-24%ODOT
250198ROS-US 35-34.22 (FOUR LANE RESURFACING)ROS2Shelly & Sands Inc$2,194,944$2,614,786+19%-3.0%ODOT
250193GUE-SR 658-10.14/10.98 (BRIDGE REPAIR)GUE3Complete General Construction Company$2,125,624$2,429,324+14%+8.0%ODOT
250204D04-PM FY2025 (West) (PAVEMENT MARKING)District 42 of 3Oglesby Construction Inc$1,947,452$2,140,000+10%-26%ODOT
250199SCI-US 52-15.06 (RELOCATION)SCI3Allard Excavation LLC$1,898,155$2,059,322+8.0%+25%ODOT
250191D03-D12 Pedestrian Safety FY2025 (SPOT SAFETY)District 32Perk Company Inc$1,627,656$2,371,885+46%+7.0%ODOT
250203D04-Culverts FY2025 (West) (CULVERT REPLACEMENT)District 42Eclipse Co LLC$1,140,873$1,199,824+5.0%+29%ODOT
254013GRE-IR 675-09.60, GRE-US 35-18.46 (CULVERT REPLACEMENT)GRE5Axis Civil Construction LLC$1,046,347$1,279,903+22%-11%ODOT
250207MOT-IR 75-18.32 Bridge Hit (BRIDGE REPAIR)MOT2Complete General Construction Company$1,002,310$1,549,564+55%-45%ODOT
250197PRE-SR 725-13.60 (CULVERT REPLACEMENT)PRE6Double Jay Construction Inc$931,294$969,889+4.0%-4.0%ODOT
250205D08-SAFETY GR FY25 (GUARDRAIL REBUILDING)District 82Cuyahoga Fence LLC$885,264$1,124,125+27%-6.0%ODOT
250195MOT-CS-Denlinger Rd RSF-01.51 (TWO LANE RESURFACING)MOT2John R Jurgensen Company$838,353$903,609+8.0%-14%ODOT
250196NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE))NOB6J & J Bridge Company Inc$773,793$888,470+15%-28%ODOT
250188BEL-SR 148-08.45 (SLIDE REPAIR)BEL8Ohio-West Virginia Excavating Co$489,254$493,447+1.0%-16%ODOT
250200STA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT)STA5Stanley Miller Construction Company$330,889$368,958+12%-12%ODOT
258004LUC-SR 25-08.37 Bridge Repair (BRIDGE REPAIR)LUC2Legend Painting Inc$270,225$330,040+22%+29%ODOT
250206D11-DS-FY2025 (BRIDGE REPAIR)District 113BCC Ohio Inc$215,471$259,686+21%0.0%ODOT
250208TRU-N River Rd Parking Lot (PARKING AREAS)TRU3Shook Company LLC$204,204$219,299+7.0%+19%ODOT
ODOT contracts let on April 10, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy