Ronyak Paving Inc: ODOT bid record
Ronyak Paving Inc submitted 131 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 15 OCT 2026, and was the low bidder on 50 of them (38%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $85,633,983
- Latest bid
- 15 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 22 | 9 | 41% |
| 2021 | 19 | 8 | 42% |
| 2022 | 20 | 7 | 35% |
| 2023 | 22 | 6 | 27% |
| 2024 | 15 | 6 | 40% |
| 2025 | 19 | 10 | 53% |
| 2026 | 14 | 4 | 29% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| GEA | 24 | 18 | 75% |
| CUY | 23 | 9 | 39% |
| LAK | 19 | 8 | 42% |
| ATB | 17 | 7 | 41% |
| POR | 14 | 3 | 21% |
| District 4 | 8 | 2 | 25% |
| TRU | 8 | 1 | 13% |
| SUM | 7 | 2 | 29% |
| LOR | 4 | 0 | 0% |
| MED | 3 | 0 | 0% |
| District 12 | 3 | 0 | 0% |
| ASD | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 114 | 114 (100%) | $1.00 | $1.00 |
| Non-tracking tack coat | 407E20000 | GAL | 123 | 70 (57%) | $2.00 | $3.25 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 101 | 66 (65%) | $900.00 | $950.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 102 | 64 (63%) | $950.00 | $1,186.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 98 | 62 (63%) | $3.00 | $3.50 |
| Center line | 646E10200 | MI | 86 | 62 (72%) | $3,900.00 | $12,144 |
| Work zone marking sign | 614E12460 | EACH | 79 | 62 (78%) | $75.00 | $92.00 |
| Stop line | 646E10400 | FT | 85 | 58 (68%) | $12.00 | $13.00 |
| Raised pavement marker removed | 621E54000 | EACH | 75 | 55 (73%) | $1.00 | $12.00 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 89 | 53 (60%) | $25.00 | $20.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 89 | 52 (58%) | $25.00 | $23.50 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 66 | 52 (79%) | $30.00 | $34.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Karvo Companies Inc | 110 | 32 of 110 |
| Shelly Company | 68 | 21 of 68 |
| Kokosing Construction Company Inc | 60 | 12 of 60 |
| Chagrin Valley Paving Inc | 51 | 19 of 51 |
| Barbicas Construction Company Inc | 44 | 4 of 44 |
| Shelly & Sands Inc | 30 | 16 of 30 |
| Phillips Paving LLC | 18 | 3 of 18 |
| Perk Company Inc | 13 | 6 of 13 |
| Geauga Highway Co | 13 | 8 of 13 |
| Specialized Construction Inc | 11 | 2 of 11 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2026 | 260426 | LAK | LAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING) | 3 of 5 | $6,902,358 | +1.0% |
| 17 SEP 2026 | 260403 | CUY | CUY-/GEA-US 422-18.17/00.00 (FOUR LANE RESURFACING) | 4 of 4 | $5,789,690 | +9.0% |
| 25 JUN 2026 | 260310 | CUY | CUY-SR 10-01.97 (FOUR LANE RESURFACING) | 1 of 4 | $4,357,635 | Low, 5.0% under the second |
| 21 MAY 2026 | 260276 | ATB | ATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS) | 6 of 6 | $2,362,273 | +12% |
| 21 MAY 2026 | 260277 | District 4 | D04-SP FY2026 (East) (SPOT PATCHING / PAVEMENT REPAIR) | 2 of 3 | $1,545,295 | +40% |
| 07 MAY 2026 | 260245 | POR | POR-SR 261-03.51 (TWO LANE RESURFACING) | 2 of 6 | $1,040,637 | 0.0% |
| 23 APR 2026 | 260211 | POR | POR-US 224-00.00 (MAJOR RECONSTRUCTION) | 3 of 5 | $12,226,500 | +12% |
| 12 MAR 2026 | 260120 | GEA | GEA-SR 528-14.52 (TWO LANE RESURFACING) | 1 of 4 | $399,832 | Low, 16% under the second |
| 19 FEB 2026 | 260081 | CUY | CUY-SR 87-14.72 (TWO LANE RESURFACING) | 1 of 7 | $669,304 | Low, 10% under the second |
| 19 FEB 2026 | 260094 | POR | POR-SR 82/SR 306-02.37/00.00 (TWO LANE RESURFACING) | 3 of 5 | $2,112,163 | +1.0% |
| 29 JAN 2026 | 260056 | LAK | LAK-SR 174-00.00 (TWO LANE RESURFACING) | 2 of 8 | $1,729,867 | 0.0% |
| 29 JAN 2026 | 260057 | LAK | LAK-SR 84/VAR-18.21/VAR (TWO LANE RESURFACING) | 4 of 7 | $1,571,832 | +40% |
| 15 JAN 2026 | 260013 | District 12 | D12-PPM FY2026 (SPOT PATCHING / PAVEMENT REPAIR) | 3 of 4 | $2,720,671 | +15% |
| 15 JAN 2026 | 260025 | POR | POR-SR 82/VAR-10.64/VAR (TWO LANE RESURFACING) | 1 of 5 | $4,051,587 | Low, 3.0% under the second |
| 18 DEC 2025 | 250561 | LAK | LAK-SR 174-04.39 (TWO LANE RESURFACING) | 3 of 7 | $907,841 | +21% |
| 18 DEC 2025 | 250588 | LAK | LAK-US 20-17.13 (FOUR LANE RESURFACING) | 1 of 6 | $900,574 | Low, 8.0% under the second |
| 04 DEC 2025 | 250546 | ATB | ATB-US 20/SR 307-03.94/07.81 (TWO LANE RESURFACING) | 1 of 3 | $1,887,965 | Low, 16% under the second |
| 04 DEC 2025 | 250551 | District 4 | D04-CHIP FY2026 (CHIP SEAL) | 1 of 3 | $1,314,405 | Low, 6.0% under the second |
| 04 DEC 2025 | 250556 | GEA | GEA-/LAK-SR 44-18.39/00.00 Rehab (MINOR RECONSTRUCTION) | 2 of 3 | $11,461,970 | +8.0% |
| 04 DEC 2025 | 250560 | LAK | LAK-E 305th St. Resurface (FOUR LANE RESURFACING) | 5 of 5 | $3,213,926 | +21% |
| 23 OCT 2025 | 250497 | GEA | GEA-SR 88/US 422-02.05/15.52 (FOUR LANE RESURFACING) | 1 of 5 | $1,595,505 | Low, 6.0% under the second |
| 25 SEP 2025 | 250436 | GEA | GEA-SR 87-02.73 (TWO LANE RESURFACING) | 1 of 6 | $1,361,400 | Low, 16% under the second |
| 11 SEP 2025 | 250409 | GEA | GEA-SR 86/SR 166-00.92/04.10 (CHIP SEAL) | 1 of 1 | $815,025 | Low |
| 31 JUL 2025 | 250364 | TRU | TRU-SR 193-17.77 (TWO LANE RESURFACING) | 4 of 4 | $1,734,900 | +15% |
| 17 JUL 2025 | 250349 | SUM | SUM-SR 21-19.57/VAR (TWO LANE RESURFACING) | 2 of 8 | $872,940 | +8.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.