ODOT contract 250409 bid tabulation

GEA-SR 86/SR 166-00.92/04.10 (CHIP SEAL). Let by Ohio DOT on September 11, 2025, GEA. 1 bid received; low bid $815,025 by Ronyak Paving Inc, -14% against the engineer's estimate of $946,000.

Owner
Ohio DOT
Letting
11 SEP 2025
Pay items
24
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ronyak Paving Inc$815,025Low-14%
ODOT contract 250409: bids by rank

Engineer's estimate: $946,000.

Bid tabulation

LinePay itemUnitQuantity1. Ronyak Paving Inc
1Erosion control (832E30000)EACH1,000$1.00
2Partial depth pavement repair (441) (251E01000)SY2,500$65.00
3Pavement repair (253E02000)CY150$565.00
4Aggregate, single chip seal, type A (422E11000)SY140,873$0.75
5Emulsion, chip seal (422E25000)GAL56,349$2.75
6Monument assembly adjusted to grade, as per plan (623E39501)EACH4$1,250.00
7Fog seal (886E11000)GAL21,131$4.00
8RPM (621E00100)EACH699$37.76
9Raised pavement marker removed (621E54000)EACH525$20.00
10Edge line, 4", type 1 (642E00100)MI18.26$598.00
11Center line, type 1 (642E00300)MI9.13$692.00
12Stop line, type 1 (642E00500)FT100$6.00
13Word on pavement, 96", type 1 (642E01410)EACH16$99.00
14Removal of pavement marking (642E30000)FT144,719$0.25
15Removal of pavement marking (642E30020)EACH8$80.00
16Work zone marking sign (614E12460)EACH12$60.00
17Work zone marking sign, as per plan (614E12461)EACH4$60.00
18Work zone center line, class III, 642 paint (614E21550)MI18.26$800.00
19Work zone edge line, class III, 4", 642 paint (614E22350)MI36.52$450.00
20Work zone stop line, class III, 642 paint (614E26610)FT200$2.50
21Premium for contract performance bond and for payment bond (103E05000)LS1$6,099.07
22Maintaining traffic (614E11000)LS1$29,800
23Construction layout stakes and surveying (623E10000)LS1$10,100
24Mobilization (624E10000)LS1$45,000
ODOT contract 250409: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy