ODOT letting results, September 11, 2025

22 contracts let by Ohio DOT on September 11, 2025, $39,444,932 in low bids, a median of 3 bidders per contract. On the 22 with an engineer's estimate, the low bid came in under it 14 times; median low bid -7.0% against the estimate.

Owner
Ohio DOT
Contracts
22
Low bids, total
$39,444,932
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250410GUE-IR 70-12.32 (FOUR LANE RESURFACING)GUE2Shelly & Sands Inc$7,833,693$8,054,508+3.0%-5.0%ODOT
250411HAM-CR 270-02.96 Miami Ave (MINOR RECONSTRUCTION)HAM5Ford Development Corp$5,460,521$5,644,975+3.0%+34%ODOT
250414LIC-SR 13-11.11 (TWO LANE RESURFACING)LIC2Shelly Company$4,808,685$5,174,465+8.0%-14%ODOT
250399WOO-SR 64/SR 65-05.78/06.18/23.39 Br Rpl (BRIDGE REPLACEMENT (3 BRIDGES))WOO3Vernon Nagel Inc$3,693,160$3,971,389+8.0%-24%ODOT
250413LAK-IR 90-11.51 Deck (BRIDGE REPAIR)LAK3Perk Company Inc$2,492,194$2,582,537+4.0%+4.0%ODOT
250408D10-Chip Seal FY 2026 South (CHIP SEAL)District 102Shelly Company$2,339,977$2,974,434+27%-13%ODOT
250417SEN-SR 19/SR 228/SR 590-06.07/00.00/00.00 (TWO LANE RESURFACING)SEN4M & B Asphalt Co Inc$2,296,034$2,484,725+8.0%-9.0%ODOT
250423D04-LG FY2026 (West) (LIGHTING)District 41Cornerstone Electric Inc$1,758,818-7.0%ODOT
250418STA-US 62-36.42/38.60 (TWO LANE RESURFACING)STA3Karvo Companies Inc$1,618,571$1,689,502+4.0%+12%ODOT
250421CUY-US 6-14.56 Tower B (BRIDGE REPAIR)CUY5Catts Construction Inc$1,108,670$1,329,288+20%+15%ODOT
250405BUT-SR 122-06.50R (CULVERT REPLACEMENT)BUT4Temple & Temple Excavating & Paving Inc$1,093,394$1,151,167+5.0%-9.0%ODOT
250422D02-LG FY2026 (LIGHTING)District 23J Ranck Electric Inc$946,225$1,014,893+7.0%+5.0%ODOT
250409GEA-SR 86/SR 166-00.92/04.10 (CHIP SEAL)GEA1Ronyak Paving Inc$815,025-14%ODOT
250416SCI-US 52-00.00 (CHIP SEAL)SCI2Shelly Company$698,102$719,431+3.0%0.0%ODOT
258021MAR-SR 231-03.42 (BRIDGE REPAIR)MAR4Double Z Construction Company$481,432$518,501+8.0%-25%ODOT
250415PIC-SR 56-20.77 (SLIDE REPAIR)PIC10Sunesis Construction Co$468,522$486,768+4.0%-47%ODOT
250419WAS-Marietta SRTS FY2026 (SIDEWALK)WAS3LMS Construction Inc$464,954$488,839+5.0%-7.0%ODOT
254023ASD-SR 39-05.20 (CULVERT REPLACEMENT)ASD4Advanced Excavating & Demolition LLC$442,608$449,367+2.0%-4.0%ODOT
250420CLA-Clark Lake WLF (PARKING AREAS)CLA4A & B Asphalt Corporation$226,563$235,589+4.0%-14%ODOT
250412HIG-US 62-17.10 (BRIDGE REPAIR)HIG3Double Z Construction Company$221,601$304,509+37%+12%ODOT
250407CUY-Eastland Rd/SR 237 Signal (SIGNALIZATION)CUY3Perram Electric Inc$108,285$121,536+12%+3.0%ODOT
250406CLA-SR 235/SR 571-04.36/01.05 (LIGHTING)CLA9Security Fence Group Inc$67,899$71,225+5.0%-69%ODOT
ODOT contracts let on September 11, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy